Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery

  • Akinsiku, Olusegun Emmanuel;Akinsulire, Akintunde
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.25-31
    • /
    • 2012
  • The growing rate of delays is adversely affecting the timely delivery of construction projects. This study therefore assesses construction stakeholders' perception of the causes of delays and its effects on project delivery in a bid to proffer solution in minimizing the occurrences of delays. Questionnaire was used to elicit responses from construction stakeholders; a total of thirty three causes of delays, seventeen resultant effects of delays and fifteen methods of minimizing construction delays were identified for the study based on literature reviews. The results suggest that client's cash flow related problems are the main causes of delays while time and cost overruns are the major identifiable effects of delays in construction projects. However, adequate project planning and budgeting were suggested as possible ways of minimizing the occurrences of delays.

Enhancement of Source Localization Performance using Clustering Ranging Method (클러스터링 기법을 이용한 음원의 위치추정 성능향상)

  • Lee, Ho Jin;Yoon, Kyung Sik;Lee, Kyun Kyung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.19 no.1
    • /
    • pp.9-15
    • /
    • 2016
  • Source localization has developed in various fields of signal processing including radar, sonar, and wireless communication, etc. Source localization can be found by estimating the time difference of arrival between the each of sensors. Several methods like the NLS(Nonlinear Least Square) cost function have been proposed in order to improve the performance of time delay estimation. In this paper, we propose a clustering method using the four sensors with the same aperture as previous methods of using the three sensors. Clustering method can be improved the source localization performance by grouping similar estimated values. The performance of source localization using clustering method is evaluated by Monte Carlo simulation.

A Case Study on the R&D Programs of Fighter & Attacker Aircraft (군용항공기 연구개발 사업 사례분석)

  • Lee, Sung Eun;Kwon, Yong Soo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.7-20
    • /
    • 2009
  • This paper describes a case study on the R&D programs of fighter and attacker aircraft such as F-22A, F/A-18E/F, and T/A-50. F-22A and F/A-18E/F were developed in same age. The performance of each program was, however extremely different. F-22A program results in a lot of cost overrun and schedule delay. On the other hand F/A-18E/F program met the cost, schedule, and performance goals. In the T/A-50 program with a super-sonic advanced trainer, T-50 was also developed successfully on planned cost and time by Korea Air-force and KAI. This paper derives key elements for the success of the military aircraft R&D program through lessons learned from th e case study. Each program is analyzed in terms of its background, planning and management.

  • PDF

Proxy-AAA Authentication Scheme with Forwarding Mode Supporting in PMIPv6 Networks

  • Han, JeongBae;Jeong, Jongpil;Jo, Jun
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.5 no.2
    • /
    • pp.18-22
    • /
    • 2013
  • Mobile IPv6 (MIPv6) is a host-based protocol supporting global mobility while Proxy Mobile IPv6 (PMIPv6) is a network-based protocol supporting localized mobility. This paper makes its focus on how to reduce the longer delay and extra cost arising from the combination of authentication, authorization and accounting (AAA) and PMIPv6 further. Firstly, a novel authentication scheme (Proxy-AAA) is proposed, which supports fast handover mode and forwarding mode between different local mobility anchors (LMAs). Secondly, a cost analysis model is established based on Proxy-AAA. From the theoretical analysis, it could be noted that the cost is affected by average arrival rate and residence time.

Design of Equal-Cost Bifurcated Routing Algorithm : A Case Study Using Closure Approximation (클로즈 근사화를 이용한 등가 라우팅 알고리즘의 설계)

  • Lee, Bong-Hwan
    • The Transactions of the Korea Information Processing Society
    • /
    • v.1 no.3
    • /
    • pp.380-390
    • /
    • 1994
  • In this paper, we propose an equal-cost bifurcated routing algorithm which may be useful in practical computer network design problem. The performance of the routing algorithm is evaluated using the conventional Monte Carlo simulation and a transient queueing approximation. The relative errors between the closure approximation and the Monte Carlo simulation was fairly small. The closure approximation may be used to evaluate the performance of the load splitting algorithms, which results in considerable execution time reduction. The performance of the proposed algorithm is compared to that of the known algorithms based on average packet delay. For networks that have many non-disjoint equal-paths, the proposed algorithm performed better than other algorithms.

  • PDF

A Study for Solving Multi-Depot Dial-a-Ride Problem Considering Soft Time Window (다수차고지와 예약시간 위반을 고려한 교통약자 차량 서비스에 대한 연구)

  • Kim, Taehyeong;Park, Bum-Jin;Kang, Weon-Eui
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.11 no.5
    • /
    • pp.70-77
    • /
    • 2012
  • Dial-a-ride is the most widely available transit service for disabled persons or seniors in the United States and Europe. This paper studies a static dial-a-ride problem considering multiple depots, heterogeneous vehicles, and soft time windows. In this paper, we apply a heuristic based on clustering first-routing second(HCR) to a real-world large dial-a-ride problem from Maryland Transit Administration(MTA). MTA's real operation is compared with the results of developed heuristic for 24 cases. The objective function of the proposed model is to minimize the total cost composed of the service provider's cost and the customers' inconvenience cost. For the comparison, the objective function values of HCR do not include waiting cost, delay cost, and excess ride cost. The objective function values from HCR are better than those from MTA's operation for all cases. This result shows that our heuristic method can make the real operation better and more efficient.

Economic Feasibility Analysis of a Tunnel Section Enlargement Method That Does Not Halt Traffic Flow (교통류 보존형 터널단면 확대 시공기술의 경제적 타당성 분석)

  • Lee, Seung Soo;Kim, Dong-Gyou;Seo, Jong Won
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.459-472
    • /
    • 2015
  • A recently developed tunnel section enlargement method can maintain traffic flow during construction by using a protector. By keeping traffic flowing, it can minimize the lost time and costs associated with diversions and also the accompanying environmental pollution. On the other hand, installing the protector can lengthen the construction period and increase the direct cost. This paper presents a method for analyzing the economic feasibility of tunnel section enlargement methods considering the direct construction cost and the indirect social cost. The indirect costs are divided into categories of: vehicle driving cost, travel time delay cost, and environmental pollution cost. The economic efficiency of existing technology is compared with the new method in an case study of Namsan Tunnel 3.

Imaging Technique Based on Continuous Terahertz Waves for Nondestructive Inspection (비파괴검사를 위한 연속형 테라헤르츠 파 기반의 영상화 기술)

  • Oh, Gyung-Hwan;Kim, Hak-Sung
    • Journal of Sensor Science and Technology
    • /
    • v.27 no.5
    • /
    • pp.328-334
    • /
    • 2018
  • The paper reviews an improved continuous-wave (CW) terahertz (THz) imaging system developed for nondestructive inspection, such as CW-THz quasi-time-domain spectroscopy (QTDS) and interferometry. First, a comparison between CW and pulsed THz imaging systems is reported. The CW-THz imaging system is a simple, fast, compact, and relatively low-cost system. However, it only provides intensity data, without depth and frequency- or time-domain information. The pulsed THz imaging system yields a broader range of information, but it is expensive because of the femtosecond laser. Recently, to overcome the drawbacks of CW-THz imaging systems, many studies have been conducted, including a study on the QTDS system. In this system, an optical delay line is added to the optical arm leading to the detector. Another system studied is a CW-THz interferometric imaging system, which combines the CW-THz imaging system and far-infrared interferometer system. These systems commonly obtain depth information despite the CW-THz system. Reportedly, these systems can be successfully applied to fields where pulsed THz is used. Lastly, the applicability of these systems for nondestructive inspection was confirmed.

Air Passenger Demand Forecasting and Baggage Carousel Expansion: Application to Incheon International Airport (항공 수요예측 및 고객 수하물 컨베이어 확장 모형 연구 : 인천공항을 중심으로)

  • Yoon, Sung Wook;Jeong, Suk Jae
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.4
    • /
    • pp.401-409
    • /
    • 2014
  • This study deals with capacity expansion planning of airport infrastructure in view of economic validation that reflect construction costs and social benefits according to the reduction of passengers' delay time. We first forecast the airport peak-demand which has a seasonal and cyclical feature with ARIMA model that has been one of the most widely used linear models in time series forecasting. A discrete event simulation model is built for estimating actual delay time of passengers that consider the passenger's dynamic flow within airport infrastructure after arriving at the airport. With the trade-off relationship between cost and benefit, we determine an economic quantity of conveyor that will be expanded. Through the experiment performed with the case study of Incheon international airport, we demonstrate that our approach can be an effective method to solve the airport expansion problem with seasonal passenger arrival and dynamic operational aspects in airport infrastructure.

Optimal Life Cycle Cost Design of a Bridge (교량의 생애주기비용 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The importance of the life cycle cost (LCC) analysis for bridges has been recognized over the last decade. However, it is difficult to predict LCC precisely since the costs occurring throughout the service life of the bridge depend on various parameters such as design, construction, maintenance, and environmental conditions. This paper presents a methodology for the optimal life cycle cost design of a bridge. Total LCC for the service life is calculated as the sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The optimization method is applied to design of a bridge structure with minimal cost, in which the objective function is set to LCC and constraints are formulated on the basis of Korean Bridge Design Code. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on damage probabilities to consider the uncertainty of load and resistance. Repair and rehabilitation cost is determined using load carrying capacity curves and user cost includes traffic operation costs and time delay costs. The optimal life cycle cost design of a bridge is performed and the effects of parameters are investigated.