• 제목/요약/키워드: Delay Risk

검색결과 291건 처리시간 0.024초

Multiclass Botnet Detection and Countermeasures Selection

  • Farhan Tariq;Shamim baig
    • International Journal of Computer Science & Network Security
    • /
    • 제24권5호
    • /
    • pp.205-211
    • /
    • 2024
  • The increasing number of botnet attacks incorporating new evasion techniques making it infeasible to completely secure complex computer network system. The botnet infections are likely to be happen, the timely detection and response to these infections helps to stop attackers before any damage is done. The current practice in traditional IP networks require manual intervention to response to any detected malicious infection. This manual response process is more probable to delay and increase the risk of damage. To automate this manual process, this paper proposes to automatically select relevant countermeasures for detected botnet infection. The propose approach uses the concept of flow trace to detect botnet behavior patterns from current and historical network activity. The approach uses the multiclass machine learning based approach to detect and classify the botnet activity into IRC, HTTP, and P2P botnet. This classification helps to calculate the risk score of the detected botnet infection. The relevant countermeasures selected from available pool based on risk score of detected infection.

중수로 원자로건물 총누설감시계통 시험 중지에 따른 리스크 영향 평가 (Risk Assessment for Abolition of Gross Containment Leak Monitoring System Test in CANDU Design Plant)

  • 배연경;나장환;방기인
    • 한국안전학회지
    • /
    • 제30권5호
    • /
    • pp.123-130
    • /
    • 2015
  • Wolsong Unit 2,3&4 has been performing a containment integrity test during power operation. This test could impact to the safe operation during test. If an accident occurs during pressure dropping phase, reactor trip can be delayed because of the increased pressure difference which causes a time delay to reach the trip set-point. On the contrary, if an accident occurs during pressure increasing phase, reactor trip could be accelerated because the pressure difference to the trip set-point decrease. Point Lepreau nuclear power plant, which installed GCLMS (Gross Containment Leakage Monitoring System) in 1990, has discontinued the test since 1992 due to these adverse effects. Therefore, we evaluated the risk to obviate the GCLMS test based on PWR's ILRT (Integrated Leak Rate Test) extension methodologies. The results demonstrate that risk increase rate is not high in case of performing only ILRT test at every 5 years instead of doing GCLMS test at every 1.5 years. In addition, the result shows that GCLMS test can be removed on a risk-informed perspective since risk increasement is in acceptable area of regulatory acceptance criteria.

공동주택 재건축사업의 리스크 분석에 관한 연구 (A Study of Risk Analysis on Apartment Reconstruction Projects)

  • 이로나;우광민;이학기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.232-235
    • /
    • 2004
  • 공동주택 재건축사업은 조합의 비전문성에 의한 사업지연, 사업주체들간의 분쟁, 그리고 비용상승과 같은 많은 문제점을 가지고 있으며, 사업시행절차가 복잡하고 사업기간이 길며, 많은 사업주체들이 참여하기 때문에 항상 불확실성에 직면하고 있다. 따라서 성공적으로 재건축사업을 추진하기 위해선 재건축사업의 추진과정에서 발생하는 불확실한 요인들을 제거 할 수 있는 리스크 관리 프로세스의 구축이 필요하다. 본 연구는 공동주택 재건축 사업에서 인지되는 리스크 요인을 체계적이고 효율적으로 관리할 수 있는 리스크 분석방법을 제안하고자 한다. 본 연구에서 제안한 리스크 분석방법은 객관적이고 체계적인 기초자료가 부재한 상태에서 담당자들의 경험에 의존하여 이루어졌던 공동주택 재건축사업에서의 리스크 관리를 객관적으로 수행할 수 있는 기초자료로서의 활용성이 기대된다.

  • PDF

우주 발사체 추진기관의 위험 관리 (Risk Management of Launch Vehicle Propulsion System)

  • 조상연;신명호;고정환;오승협;박정주
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2007년도 제28회 춘계학술대회논문집
    • /
    • pp.3-6
    • /
    • 2007
  • 한국항공우주연구원에서는 소형의 위성을 원하는 궤도에 투입할 수 있는 최초의 민간 로켓인 KSLV-I을 개발하고 있다. 우주 발사체의 개발에는 큰 스케일과 복잡성, 그리고 기술적 난점에 의한 수많은 불확실성이 존재한다. 이러한 불확실성은 사업적 측면에서는 일정의 차질, 비용의 증가 등을 야기하고 기술적 측면에서는 서브시스템이나 부품단위의 설계 변경 등을 가져오게 된다. 이 연구는 발사체 추진기관에 있어서 fault tree analysis (FTA)를 이용한 기술적 위험 식별과 위험 분석 및 완화의 과정을 보여주고자 한다.

  • PDF

공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스 (GMP Calculation Process in CM at Risk for Public Construction Project)

  • 김건성;김정훈;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

IDENTIFYING CRITICAL RISKS IN PUBLIC PRIVATE PARTNERSHIP PROJECTS IN SINGAPORE

  • Xianbo Zhao;Bon-Gang Hwang;Mindy Jiang Shu Gay
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.444-450
    • /
    • 2013
  • Public private partnership (PPP) procurement was introduced into Singapore in 2003, and 10 PPP projects was successfully completed and have been in operation. The objective of this study is to identify the critical risk factors and risk allocation preferences for PPP projects in Singapore. To achieve this objective, a comprehensive literature review was carried out and 42 risks were identified and grouped into three meta levels, i.e. macro, meso and micro levels. The questionnaire survey produced 48 completed questionnaires from 48 different contractors. The survey results indicated that 23 risk factors had significantly high criticalities and that four macro-level risks, four meso-level risks and two micro-level risks were among the top 10 risk ranking. "Lack of support from government", "availability of finance" and "construction time delay" were perceived as the top three critical risks. Also, the result implied that micro-level risks had a higher criticality mean score than macro-level and meso-level risks. The findings of this study help both public and private sectors to better understand the risks and their allocation in PPP projects, providing valuable information for organizations that intend to participate in PPP projects in Singapore.

  • PDF

확률 통계적 일정 시뮬레이선 - 민감도 분석을 이용한 최종 공사비 예측 (Predicting Construction Project Cost using Sensitivity Analysis in Stochastic Project Scheduling Simulation (SPSS))

  • 이동은;박찬식
    • 한국건설관리학회논문집
    • /
    • 제6권4호
    • /
    • pp.80-90
    • /
    • 2005
  • 프로젝트의 일정 네트워크는 선-후행 관계로 정의된 액티 비 티들로 구성되어 있다 액티비티를 완료하는데 소요되는 기간은 다양한 단축-지연 원인들에 의해 임의적이고, 확률-통계적 인 특성을 지닌다. 이러한 특성은 최종공사기간을 불확실하게하며, 재무리스크의 주요인이 된다. 본 연구는 선행 연구에서 개발된 확률-통계적 일정 시뮬레이션 시스템(Stochastic Project Scheduling Simulation)을 확장하여 액티비티 기간이 임의적으로 변동함에 따라 최종공사비가 어떻게 거동하는지 추정하는 방법론을 제시한다. 액티비티 기간을 임의의 변수로 취급하였고, 액티비티에 할당된 직접공사비에 공사기간의 단축-지연에 따른 간접비의 증감을 반영하여 최종공사비를 추정하였다. 액티비티 기간의 변동에 따라 의존 변수인 간접비가 변동하는 특성을 고려하여 시뮬레이션 출력값들(최종공사기간들)의 통계적 특성을 정량적으로 분석하여 최종공사비를 추정하였으며, 예비할 필요가 있는 지체보상금의 정도를 정량화하였다. 기존의 결정론적 기법이 불확실성을 내재한 체 지체 보상금의 비율을 주관적으로 적용해 왔던 반면, 본 연구에서 제시된 기법은 확실성과 신뢰도를 가지고 지체보상금의 비율을 책정할 수 있도록 하는 방법론을 제시하고 있다. 하나의 예제 프로젝트가 시뮬레이션을 이용한 정량분석기법을 예시하기위해 사용되었으며, 불확실성을 내포하고 있는 액티비티 기간들이 최종공사비에 미치는 영향을 검증하기위해 시뮬레이션 모의실험을 실행하였다 자동화된 민감도분석 기법을 이용하여 액티비티 기간을 정의하는 확률분포함수의 통계적 위치를 변화시킴에 따라 최종공사기간 및 최종공사비가 어떠한 거동을 나타내는지 확인하였다. 예제로 사용된 표본 프로젝트에 내재되어있는 재무리스크에 대응하기위해 지체보상금을 어느 정도까지 보유할 필요가 있는지를 정량적으로 분석하고, 의사결정을 위해 어떻게 적용될 수 있는지를 소개한다. 본 연구에 제시된 기법은 연구자들 및 현업 종사자들에게 최종공사비 예측에있어서 액티비티 기간 변화의 확률적 영향과 이론적 의미를 밝힘으로 프로젝트 자본계획과 관련된 위기관리에 진보된 예측방법론을 제공한다.

고령자 남녀의 발목관절 근육 반응시간의 비교 (Comparison of Reaction Times of Ankle Joint Muscles in the Elderly Men and Women)

  • 김지원;정홍영;김효희;권유리;엄광문;이정환;김경섭;전재훈;박병규
    • 대한의용생체공학회:의공학회지
    • /
    • 제33권4호
    • /
    • pp.163-168
    • /
    • 2012
  • Elderly women are reported to have greater risk of falls. The purpose of this paper was to investigate the possible gender differences in the reaction performance of ankle joint muscles, which have dominant role in the control of sagittal plane balance. Twenty-six elderly men and women with comparable mean age participated in this study. Reaction times to the audible beeps were measured in the tibialis anterior muscle and gastrocnemius muscle. Reaction time variables included premotor time, electromechanical delay and total reaction time. Gender difference in each reaction time was investigated by independent t-test. In both muscles, premotor time was longer in men but the electromechanical delay was longer in women (p < 0.05). Resulting total reaction time was longer in men in tibialis anterior muscle (p < 0.01) and it tended to be longer in men also in gastrocnemius muscle (p = 0.25). The results demonstrates that the overall reaction performances of elderly women is better than or comparable to those of elderly men in ankle joint muscles. This suggests that the reaction performance of ankle muscles is hardly the cause of the greater risk of falls in elderly women.

철도 BTL 민자적격성조사의 위험계량화방안 연구 (A Risk Quantification of Public Sector Comparator in the Financial Analysis of the BTL (Build-Transfer-Lease) Scheme of Railway Projects: a Case Study of the Haman-Jinju Link)

  • 장수은;강지혜
    • 대한교통학회지
    • /
    • 제24권5호
    • /
    • pp.67-74
    • /
    • 2006
  • 지금까지 민간투자사업은 대부분 수익형 민자사업(BTO; Build-Transfer-Operate) 방식으로 추진되었다. BTO 방식은 수요위험을 민간투자자가 부담하므로 철도부문처럼 투자의 필요성에 비해 수익이 보장되기 힘든 분야의 투자는 저조할 수밖에 없었다. 2005년 민간투자법의 개정과 함께 도입된 임대형 민자사업(BTL, Build-Transfer-Lease) 방식은 민간의 투자비를 국가나 지자체의 임대료로 회수하므로 수익성 제약으로부터 자유로울 수 있으며, 그 결과 BTO 방식보다 민간투자 도입의 본 취지에 더욱 충실한 방식으로 평가되고 있다. 그러나 BTL 방식은 미래세대로부터 재원을 차입함으로써 미래세대에 부담을 전가하고 재원배분의 자유를 제약한다는 부정적인 측면을 내포하고 있다. 따라서 대상사업의 규모와 범위를 과학적으로 검토하는 작업이 중요하며 이는 1차적으로 민자적격성조사(VfM Test ; Value for Money Test)에 의해 결정된다. 민자적격성조사는 특정사업의 재정대안과 민자대안의 각종 정량적 정성적 생애주기비용(LCC; Life Cycle Cost)을 비교 검토하는 절차이므로 각 대안의 핵심 비용항목이 반드시 포함되어 평가될 때 신뢰성 높은 조사라 할 것이다. 그러나 현재까지 고시된 BTL사업은 위험계량화비용이 반영되지 않음으로써 그 완결성이 떨어진다. 본 연구에서는 경전선 함안${\sim}$진주간 BTL사업을 대상으로 재정사업의 위험을 계량화할 수 있는 방안을 실증적으로 예시하며, 이를 통해 보다 합리적인 민자적격성조사를 수행할 수 있는 근거를 제시한다.

VISSIM을 활용한 도심 지하도로 연결로 위험도 산정을 위한 기초연구 : 분·합류부 기준 특성 비교 (Preliminary Study for Risk Assessment Estimation of Urban Underground Connect Section Using VISSIM : Comparison of Characteristics Based on Diverge/Merge)

  • 박상현;이진각;양충헌;김진국
    • 한국ITS학회 논문지
    • /
    • 제20권5호
    • /
    • pp.59-74
    • /
    • 2021
  • 국내 도로공간은 평면적 공간 분배의 한계점에 다다르고 있으며, 점점 지하공간의 개발을 통한 입체적 공간 분배의 중요성이 대두되고 있다. 이에 본 연구에서는 지상도로와 지하도로의 연계에 있어 서로 다른 두 교통흐름을 안전하게 유도할 수 있는 교통제어 방안에 대한 연구를 수행하였다. VISSIM을 통해 지하도로 내 분·합류부가 존재할 경우의 본선 용량대비 적정 유출·입 교통량을 산출하였으며, 상충 수 분석을 통해 지하도로 내 안전을 위한 적정 교통량 제어수준을 분석하였고, 지상도로의 지·정체 시나리오 분석을 통해 지상부 지·정체 수준에 따른 지하도로 내 위험도 수준에 대한 기초연구를 수행하였다.