• Title/Summary/Keyword: Delay Line

Search Result 791, Processing Time 0.033 seconds

PERFORMANCE OF FIMS MICROCHANNEL PLATE DETECTOR SYSTEM (FIMS의 마이크로채널 플레이트 검출기 시스템의 특성)

  • Nam, U.W.;Rhee, J.G.;Kong, K.N.;Park, Y.S.;Jin, K.C.;Jin, H.;Park, J.H.;Yuk, I.S.;Seon, K.I.;Han, W.;Lee, D.H.;Ryu, K.S.;Min, K.W.;Edelstein, J.;Korpela, E.
    • Journal of Astronomy and Space Sciences
    • /
    • v.19 no.4
    • /
    • pp.273-282
    • /
    • 2002
  • We describe some performance of the detector electronics system for the FIMS (Far-ultraviolet Imaging Spectrograph) mission. The FIMS mission to map the far ultraviolet sky uses MCP (micro-channel plate) detectors with a crossed delay line anode to record photon arrival events. FIMS has two MCP detectors, each with a ~25mm$\times$25mm active area. The unconventional anode design allows for the use of a single set of position encoding electronics for both detector fields. The centroid position of the charge cloud, generated by the photon-stimulated MCP, is determined by measuring the arrival times at both ends of the anode following amplification and external delay. The temporal response of the detector electronics system determines the readout's positional resolution for the charge centroid. High temporal resolution (<$35{\times}75$ps FWHM) and low power consumption (< 6W) were achieved for the FIMS detector electronics system.

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

Simulation Study of a Large Area CMOS Image Sensor for X-ray DR Detector with Separate ROICs (센서-회로 분리형 엑스선 DR 검출기를 위한 대면적 CMOS 영상센서 모사 연구)

  • Kim, Myung Soo;Kim, Hyoungtak;Kang, Dong-uk;Yoo, Hyun Jun;Cho, Minsik;Lee, Dae Hee;Bae, Jun Hyung;Kim, Jongyul;Kim, Hyunduk;Cho, Gyuseong
    • Journal of Radiation Industry
    • /
    • v.6 no.1
    • /
    • pp.31-40
    • /
    • 2012
  • There are two methods to fabricate the readout electronic to a large-area CMOS image sensor (LACIS). One is to design and manufacture the sensor part and signal processing electronics in a single chip and the other is to integrate both parts with bump bonding or wire bonding after manufacturing both parts separately. The latter method has an advantage of the high yield because the optimized and specialized fabrication process can be chosen in designing and manufacturing each part. In this paper, LACIS chip, that is optimized design for the latter method of fabrication, is presented. The LACIS chip consists of a 3-TR pixel photodiode array, row driver (or called as a gate driver) circuit, and bonding pads to the external readout ICs. Among 4 types of the photodiode structure available in a standard CMOS process, $N_{photo}/P_{epi}$ type photodiode showed the highest quantum efficiency in the simulation study, though it requires one additional mask to control the doping concentration of $N_{photo}$ layer. The optimized channel widths and lengths of 3 pixel transistors are also determined by simulation. The select transistor is not significantly affected by channel length and width. But source follower transistor is strongly influenced by length and width. In row driver, to reduce signal time delay by high capacitance at output node, three stage inverter drivers are used. And channel width of the inverter driver increases gradually in each step. The sensor has very long metal wire that is about 170 mm. The repeater consisted of inverters is applied proper amount of pixel rows. It can help to reduce the long metal-line delay.

On the vibration influence to the running power plant facilities when the foundation excavated of the cautious blasting works. (노천굴착에서 발파진동의 크기를 감량 시키기 위한 정밀파실험식)

  • Huh Ginn
    • Explosives and Blasting
    • /
    • v.9 no.1
    • /
    • pp.3-13
    • /
    • 1991
  • The cautious blasting works had been used with emulsion explosion electric M/S delay caps. Drill depth was from 3m to 6m with Crawler Drill ${\phi}70mm$ on the calcalious sand stone (soft -modelate -semi hard Rock). The total numbers of test blast were 88. Scale distance were induced 15.52-60.32. It was applied to propagation Law in blasting vibration as follows. Propagtion Law in Blasting Vibration $V=K(\frac{D}{W^b})^n$ were V : Peak partical velocity(cm/sec) D : Distance between explosion and recording sites(m) W : Maximum charge per delay-period of eight milliseconds or more (kg) K : Ground transmission constant, empirically determind on the Rocks, Explosive and drilling pattern ets. b : Charge exponents n : Reduced exponents where the quantity $\frac{D}{W^b}$ is known as the scale distance. Above equation is worked by the U.S Bureau of Mines to determine peak particle velocity. The propagation Law can be catagorized in three groups. Cubic root Scaling charge per delay Square root Scaling of charge per delay Site-specific Scaling of charge Per delay Plots of peak particle velocity versus distoance were made on log-log coordinates. The data are grouped by test and P.P.V. The linear grouping of the data permits their representation by an equation of the form ; $V=K(\frac{D}{W^{\frac{1}{3}})^{-n}$ The value of K(41 or 124) and n(1.41 or 1.66) were determined for each set of data by the method of least squores. Statistical tests showed that a common slope, n, could be used for all data of a given components. Charge and reduction exponents carried out by multiple regressional analysis. It's divided into under loom over loom distance because the frequency is verified by the distance from blast site. Empirical equation of cautious blasting vibration is as follows. Over 30m ------- under l00m ${\cdots\cdots\cdots}{\;}41(D/sqrt[2]{W})^{-1.41}{\;}{\cdots\cdots\cdots\cdots\cdots}{\;}A$ Over 100m ${\cdots\cdots\cdots\cdots\cdots}{\;}121(D/sqrt[3]{W})^{-1.66}{\;}{\cdots\cdots\cdots\cdots\cdots}{\;}B$ where ; V is peak particle velocity In cm / sec D is distance in m and W, maximLlm charge weight per day in kg K value on the above equation has to be more specified for further understaring about the effect of explosives, Rock strength. And Drilling pattern on the vibration levels, it is necessary to carry out more tests.

  • PDF

Implementation of a Predictor for Cell Phase Monitoring at the OLT in the ATM-PON (ATM-PON의 OLT에서 상향 셀 위상감시를 위한 예측기의 구현)

  • Mun, Sang-Cheol;Chung, Hae;Kim, Woon-Ha
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.27 no.2C
    • /
    • pp.160-169
    • /
    • 2002
  • An ATM-PON (Passive Optical Network) system consists of an OLT (Optical Line Termination), multiple ONUs (Optical Network Units) and the optical fiber which has a PON (Passive Optical Network)configuration with a passive optical splitter. To avoid cell collisions on the upstream transmission, an elaborate procedure called as ranging is needed when a new ONU is installed. The ONU can send upstream cells according to the grant provided by the OLT after the procedure. To prevent collisions being generated by the variation of several factors, OLT must performs continuously the cell phase monitoring. It means that the OLT predicts the expected arrival time, monitors the actual arrival time for all upstream cells and calculates the error between the times. Accordingly, TC (Transmission Convergence) chip in the OLT needs a predictor which predicts the time that the cell will arrive for the current grant. In this paper, we implement the predictor by using shift registers of which the length is equivalent to the equalized round trip delay. As each register consists of 8 bit, OLT can identify which ONU sends what type of cell (ranging cell, user cell, idle cell, and mini-slot). Also, TC chip is designed to calculate the effective bandwidth for all ONUs by using the function of predictor. With the time simulation and the measurement of an implemented optical board, we verify the operation of the predictor.

Symbol Power Allocation and Channel Estimation Method for LR-WPAN System (LR-WPAN 시스템에서 심볼 전력 할당과 2개의 직교 코드를 사용한 채널 추정 기법)

  • Lee, Kyung-Tak;Lee, Sung-Jun;Sohn, Sung-Hwan;Kim, Jae-Moung
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.44 no.11
    • /
    • pp.1-10
    • /
    • 2007
  • In this paper, we proposed channel estimation scheme for LR-UWB system which has low data rate for WPAN in IEEE 802.15.4a. At the transmitter, we proposed dynamic power level allocation depends on channel condition in specific period when we modulate signal. We use two orthogonal code to estimate channel at once. It can estimate channel more accurately by using two code which shows good correlation characteristic then it can estimate more accurately by spreading gain. Using estimated channel condition, we synchronize symbol timing of transmitted signal. Then determined power allocation scheme and channel information is transmitted to transmiter side. Finally, using these information, transmiter side change the power level of repeated pulse to adopt to channel condition. Simulation is performed under S-V channel for LR-WPAN in IEEE 802.15.4a and we compare the performance with a different type of receiver type. We use coherent and non-coherent method at the receiver. Simulation result shows us at the NLOS channal performance evaluation is greater than that of LOS channel and the result is independent of receiver type. In the NLOS channel, as the signal delay spreading is big, performance evaluation is also increased.

A Study on the Interface between DAS and SCADA by using Direct Method (직접연계방법에 의한 DAS-SCADA 연계 연구)

  • Park, So-Young;Shin, Chang-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.5
    • /
    • pp.1154-1163
    • /
    • 2008
  • DAS and SCADA system are main systems, which operate and manage the power system by using computer and communication technology. But DAS and SCADA have been operated independently in Korea, so there was some time delay in the fault handling and live-line work. To improve that problems, studies on the interface between DAS and SCADA have been needed. From November 2005 to December 2007, the pilot project has been performed in KEPCO's branch offices, as a result, direct method will be applied widely all over the country until 2010 because the operation information of substation users want can be transmitted fast and it is possible to control 43RC directly although the expense for direct method is about 1.3 times larger than that for web method. To improve problems revealed during the pilot project, substation object to object communication method is proposed and interface database automatic generation and interface system diagnosis and logging functions are developed. Interface data point and communication data type are defined, substation single line diagram automatic generation or manual editing function, SCADA monitoring and controlling function, log data managing function are developed in SCADA HMI program. It is expecting to reduce the average time for each outage about 33% and to improve the reliability, efficiency of operation, execution of DAS from automatic load transfer under a fault, and to contribute to export project.

A Reuse Model Utilizing Diverse Aspects of Components and Services (컴포넌트의 다면성과 서비스를 기반으로 하는 재사용 모델)

  • Park, Soo-Jin;Park, Soo-Yong
    • Journal of KIISE:Software and Applications
    • /
    • v.34 no.4
    • /
    • pp.303-316
    • /
    • 2007
  • Even though many approaches for reuse have been introduced, software engineers are still hesitating to reuse existing software components. Among various reasons for the phenomena, the most significant one is that existing approaches failed to give substantial benefit for the reduction of developers' effort in reusing software assets. To solve this problem, we introduce a custom reuse model utilizing diverse aspects of components specified by RAS and services oriented architecture. We also carried out a case study to demonstrate its feasibility and evaluated it by comparing it to an existing code-based software reuse process. The proposed reuse model helps in the reduction of effort in reusing existing components by decreasing the time for searching and understanding them. Compared to other approaches such as product line engineering, our approach for software reuse using MPC does not require much initial work for implementing the reuse model in different projects. It is of interest to software engineers who are worried about heavy investment, which can cause the delay in their usual development work. Furthermore, the proposed reuse model is not mutually exclusive with other approaches for software reuse such as CBSD or product line engineering. It can accelerate the benefits gained from them.

Delayed intentional replantation of periodontally hopeless teeth: a retrospective study

  • Lee, Eun-Ung;Lim, Hyun-Chang;Lee, Jung-Seok;Jung, Ui-Won;Kim, Ui-Sung;Lee, Seung-Jong;Choi, Seong-Ho
    • Journal of Periodontal and Implant Science
    • /
    • v.44 no.1
    • /
    • pp.13-19
    • /
    • 2014
  • Purpose: The purpose of this study was to retrospectively evaluate the survival of periodontally hopeless teeth that were intentionally extracted and replanted after a delay and to compare the radiographic characteristics of the survival group with those of the failure group. Methods: The clinical and radiographic data from patients who underwent delayed intentional replantation between March 2000 and July 2010 were reviewed. Twenty-seven periodontally hopeless teeth were extracted and preserved in medium supplemented with antibiotics for 10-14 days. The teeth were then repositioned in the partially healed extraction socket and followed for 3 to 21 months. The radiographic parameters were analyzed using a paired t test and the cumulative survival rate was analyzed using Kaplan-Meier analysis. Results: Seven replanted teeth failed and the overall cumulative survival rate was 66.4%. In the survival group, the amount of bone loss was reduced from 68.45% to 34.66% three months after replantation. There was radiologic and clinical evidence of ankylosis with 5 teeth. However, no root resorption was found throughout the follow-up period. In the failure group, bone formation occurred from the bottom of the socket. However, a remarkable radiolucent line along the root of a replanted tooth existed. The line lengthened and thickened as time passed. Finally, in each case of failure, the tooth was extracted due to signs of inflammation and increased mobility. Conclusions: Delayed intentional replantation has many advantages compared to immediate intentional replantation and could serve as an alternative treatment for periodontally involved hopeless teeth. However, techniques for maintaining the vitality of periodontal structures on the tooth surface should be developed for improved and predictable results.

Thermal Stable Ni-silicide Utilizing Pd Stacked Layer for nano-scale CMOSFETs (나노급 CMOSFET을 위한 Pd 적층구조를 갖는 열안정 높은 Ni-silicide)

  • Yu, Ji-Won;Zhang, Ying-Ying;Park, Kee-Young;Li, Shi-Guang;Zhong, Zhun;Jung, Soon-Yen;Yim, Kyoung-Yean;Lee, Ga-Won;Wang, Jin-Suk;Lee, Hi-Deok
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.10-10
    • /
    • 2008
  • Silicide is inevitable for CMOSFETs to reduce RC delay by reducing the sheet resistance of gate and source/drain regions. Ni-silicide is a promising material which can be used for the 65nm CMOS technologies. Ni-silicide was proposed in order to make up for the weak points of Co-silicide and Ti-silicide, such as the high consumption of silicon and the line width limitation. Low resistivity NiSi can be formed at low temperature ($\sim500^{\circ}C$) with only one-step heat treat. Ni silicide also has less dependence of sheet resistance on line width and less consumption of silicon because of low resistivity NiSi phase. However, the low thermal stability of the Ni-silicide is a major problem for the post process implementation, such as metalization or ILD(inter layer dielectric) process, that is, it is crucial to prevent both the agglomeration of mono-silicide and its transformation into $NiSi_2$. To solve the thermal immune problem of Ni-silicide, various studies, such as capping layer and inter layer, have been worked. In this paper, the Ni-silicide utilizing Pd stacked layer (Pd/Ni/TiN) was studied for highly thermal immune nano-scale CMOSFETs technology. The proposed structure was compared with NiITiN structure and showed much better thermal stability than Ni/TiN.

  • PDF