The Transactions of the Korean Institute of Electrical Engineers A
/
v.49
no.7
/
pp.345-349
/
2000
This paper presents an extended integral control with the PI controller by introducing the delay and decaying factors. The extended integral control scheme is developed by substituting the proportional convolution integral control for the PI(Proportional Integral) control. So far, the integral part of PI controller produces a signal that is proportional to the time integral of the input signal to the controller. The steady-state operation points are affected forever by errors in the past due to the input signal containing the information of the error in the past. These phenomena may cause some disturbances for other control purposes related to the given PI control. Introduction of forgetting factors to the error in the past can resolve the disturbance problems. Various forgetting factors are developed using the delay elements, the decaying factors, and the combination of the delay and decaying factors. The proposed various extended integral control schemes can be applicable to the corresponding PI control designs in which the error in the past may badly affect the current steady-state operation points and may cause some disturbances for other control purposes.
This paper presents an optimal robust LQ-PID controller design method for a second order system with time-delay to meet design specifications. By LQR formulation of the second order system with time-delay, tuning parameters of PID controller are related by the weighting factors Q and R of cost function. The selection of the weighting factors Q and R are chosen to satisfy such the design specifications as overshoot and settling time.
International conference on construction engineering and project management
/
2005.10a
/
pp.758-763
/
2005
For international projects in general and the projects in the Gulf area in Particular, the most common cause of construction disputes and claims is construction delay. This paper will present different surveys to identify the causes of delay, the parties responsible, and how delay can be avoided. This paper will outline how these factors impact damage assessment and entitlement. Furthermore, a case study will be presented to show how the responsibility and damages due to delay are assessed and how entitlements are calculated.
Journal of the Korean Society for Aviation and Aeronautics
/
v.19
no.1
/
pp.29-37
/
2011
Last April, Europe was severly damaged as all social and economic activities came to a halt prompted by the cancellation of all flights resulting from volcanic ash. This exemplifies that the meteorology conditions have significant influence on the flights of airplanes. Hence, in this research the influence that the meteorology has on the domestic flights and its characteristics will be examined, and the core meteorological factors that influence flights in each airport will be drawn. In order to do this, statistical analysis on the influence that the meteorology has on flights was carried out in order to analyze the data about flight cancelation and delay and also its cause, primarily based on the Gimpo, Gimhae, and the Jeju airports. As a result, first, the meteorological factors which impact flight cancellation and delay were different among the domestic airports, and second, it was analyzed that fog was the main meteorological factor in the Gimpo airport, strong wind in the Jeju airport, and fog in the Gimhae airport. Third, between the day the flights were cancelled and delayed occurred, and the day that weren't, the fact that there existed a difference among the actual meteorological factors was statistically drawn. With the result of such analysis, meteorological factors pertaining to the cancellation and delay of flights must be considered seperately by each airport and specialized meteorological information must be provided accordingly. Further, when selecting the position of an airport that is to be constructed in the future, implications that there is a definite need for the meteorology effect evaluation based on past meteorology data can be drawn.
Journal of Construction Engineering and Project Management
/
v.7
no.1
/
pp.1-12
/
2017
Construction delay is one of the basic constrains to achieve the project objectives in developing countries. This study aims to find the causes and effects of construction delays in developing countries. A thorough literature review has been done following the content analysis method. The relevant literature of 28 developing countries was collected from the scholarly journals published in the period of 2006 to 2016. The different developing countries are grouped into three geographic regions, i.e. South and Southeast Asia, Middle East, and Africa. In these regions, total 53 potential causes of delay under 8 major groups are identified. Frequency and ranking of these factors have been done. The factors, delay in progress payment by owner, contractors' cash flow problem, improper planning and scheduling, poor site management, and change order by owner during construction, are acknowledged as critical causes of delay in developing countries. This study will assist both academic and professional experts providing more insight about the construction delays and project management in developing countries.
Kim, Hyun-mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
Proceedings of the Korean Institute of Building Construction Conference
/
2011.05a
/
pp.191-192
/
2011
The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.
Baishya, Nizara;Das, Ashok Kumar;Krishnatreya, Manigreeva;Das, Anupam;Das, Kishore;Kataki, Amal Chandra;Nandy, Pintu
Asian Pacific Journal of Cancer Prevention
/
v.16
no.11
/
pp.4715-4718
/
2015
Background: Patient delay can contribute to a poor outcome in the management of head and neck cancers (HNC). The main objective of the present study was to investigate the factors associated with patient delay in our population. Materials and Methods: Patients with cancers of the head and neck attending a regional cancer center of North East India were consecutively interviewed during the period from June 2014 to November 2014. The participation of patients was voluntary. The questionnaire included information on age, gender, residential status, educational qualification, monthly family income, any family history of cancer, and history of prior awareness on cancer from television (TV) program and awareness program. Results: Of 311 (n) patients, with an age range of 14-88 years (mean 55.4 years), 81.7% were males and 18.3% females (M:F=4.4). The overall median delay was 90 days (range=7 days-365 days), in illiterate patients the median delay was 90 days and 60 days in literate patients (P=0.002), the median delay in patients who had watched cancer awareness program on TV was 60 days and in patients who were unaware about cancer information from TV program had a median delay of 90 days (p=0.00021) and delay of <10 weeks was seen in 139 (44.6%) patients, a delay of 10-20 weeks in 98 (31.5%) patients, and a delay of 20-30 weeks in 63 (20.2%) patients. Conclusions: Education and awareness had a significant impact in reduction of median patient delay in our HNC cases.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05a
/
pp.125-129
/
2010
The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.
The Journal of Economics, Marketing and Management
/
v.6
no.1
/
pp.9-16
/
2018
Purpose - Benefit delay type services have a characteristic of benefit delay that does not immediately appear at the time of delivery of service. Due to a characteristic of benefit delay, the customer's participation in the service delivery system is hindered, and the quality of service declines. As a result, customer satisfaction would be reduced. The purpose of this study is to construct an analytical framework to analyze a mechanism that promotes customer participation in benefit delay type services. Research design, data, and Methodology - Existing research has considered only the performance of service companies to enhance the quality of service and customer satisfaction. This study focused on customer participation as a factor affecting the quality of service and customer satisfaction and attempted to construct an analytical framework based on a theoretical perspective of motivational research. Results - By adopting the motivation theory, this research derived three concepts, the possibility of gaining benefits, the emotional experience, and the desire of benefit. And motivation is created when the three factors interact with each other. Conclusions - This paper has constructed an analytical framework for analyzing factors that promote customer participation in the benefit delay service and finally has proposed case study for further research.
Kim, Jeoung Hee;Lee, Eun Ha;Kim, Su Ran;Kim, Sung Reul
Korean Journal of Adult Nursing
/
v.28
no.1
/
pp.43-52
/
2016
Purpose: The aim of this study was to identify demographic, clinical, physical, and psychosocial factors affecting discharge delay in lumbar spinal surgery patients who were treated according to a critical pathway. Methods: A sample of 170 patients with lumbar spinal surgery agreed to participate in the study, between April 1, 2014 and August 30, 2015. Data were analyzed by mean, standard deviation, t-test, ${\chi}^2$-test, ANCOVA, and logistic regression analysis using SPSS 22.0 program. Results: Approximately fifty-nine percent of the participants was delayed discharge. On logistic regression analysis, female gender (OR=2.63, 95% CI=1.40~4.94), age (OR=1.03, 95% CI=1.01~1.05), spondylolisthesis (OR=4.49, 95% CI=1.90~10.61), and spinal fusion operation (OR=4.14, 95% CI=1.89~9.05) were significant factors predicting discharge delay of the participants. However, discharge delay was not related with pain, physical function, depression, or family support. Conclusion: An analysis of discharge delay may assist in evaluating and revising critical pathway for optimal care. In addition, nurses need to understand the factors affecting discharge delay of the given population who were treated according to a critical pathway.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.