  • Reperfusion delay in patients with acute myocardial infarction leads to increased morbidity and mortality. We sought to measure the rates of reperfusion delay and to identify factors associated with reperfusion delay after arrival to hospitals. We included 360 patients who had acute myocardial infarction with ST-elevation or left bundle branch block on electrocardiogram and received reperfusion therapy from the three participating academic medical centers from 1997 to 2000. Through retrospective chart review, we collected data about time to reperfusion therapy, patient and hospital factors potentially associated with reperfusion delay. Factors independently associated with reperfusion delay were determined by logistic regression analysis. Median door­to­needle time was 60.0 minutes, and median door­to­balloon time was 102.5 minutes. According to recommendation of the American College of Cardiology/American Heart Association Guidelines, 226 out of 264(85.6%) of thrombolytic patients and 43 out of 96(44.8%) percutaneous transluminal coronary angioplasty(PTCA) patients experienced reperfusion delay. The significant factors associated with delay were type of reperfusion therapy, patient factors including hypertension and delayed symptom onset to presentation(>4 hours), and hospital factors including nocturnal presentation(6pm∼8am), weekend, and an individual hospital. A significant proportion of patients experienced reperfusion delay. The identified predictors of reperfusion delay may help design a hospital system to reduce the delay in reperfusion therapy

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

Delay Factors Affecting the Completion of the Government Construction Projects in Vietnam

  • Kim, Soo-Yong;Nguyen, Viet Thanh;Luu, Van Truong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.161-165
    • /
    • 2015
  • The delay in construction is the challenge often faced in the course of executing construction projects. To the government projects, the delays become very serious. This problem directly affects the lives, social welfare of the people, and the other negative social impacts. However, the government projects have not been much interest. The questionnaire surveys in Vietnam were conducted to determine the causes of the delay and to find solutions for dealing with the delay. The average index was used to rank the delay factors and the solutions. This study identified the 5 most highly ranked delay factors and the 8 best solutions from a list of 31 delay factors and 19 solutions for the delay. The five most highly ranked delay factors were: information delays and lack of information exchange between the parties; incompetent owner; incompetent supervision consultant; incompetent contractor; and difficulties in financing project by owner. The findings of the study can help the parties involved the government construction projects and practitioners to give appropriate strategies for countering the delay in their projects.

  • PDF

Delay Factors in Building Construction Projects in Rwanda

  • Umuhoza, Esperance;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.467-475
    • /
    • 2019
  • Delay is one of the most critical issues for construction projects and leads to huge losses in both developing and industrialized countries. The construction sector in Rwanda, a rapidly-developing nation, is no exception. Delays can be mitigated only once we have identify their primary causes, and these may not be the same in each region. This study aims to ascertain the main critical factors responsible for delays in building construction in Rwanda through an intensive literature review and questionnaire survey. A total of 40 delay causative factors were obtained from a literature review and were further classified into nine major categories. The questionnaire survey was distributed to about 80 respondents from clients, contractors, and consultants. From the list of 40 different factors, the top twelve most critical causes were identified as stoppage of work due to cash flow constraints, delay in approving design documents, confidentiality of physical plan, price fluctuations and delay in approving significant change, change orders, delay in performing inspections, Ineffective project planning, inadequate drawing details, unqualified labor, lack of materials on the market and dishonesty.

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

A study of the factors affecting delay in apartment projects in Vietnam

  • Luu, Truong-Van;Kim, Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.718-721
    • /
    • 2007
  • Construction schedule plays a key role in project management due to its influence on the project success. Thus, it is important to identify factors affecting construction delay. The major objective of this study is to identify and evaluate factors affecting construction delay in apartment projects in Vietnam. The findings confirmed that financial difficulties of owners and contractors, contractors without adequate experience, non-available materials on time, slow site clearance, inappropriate construction methods, defective works and reworks, and lack of capable owners/project managers are the major causes of delay in apartment projects.

  • PDF

A Methodology for Analyzing on the Correlation of Factors Affecting the Acquisition of Military Weapons Systems : Focused on Factor Analysis of Naval Ship Acquisition Delay Cases (국방무기체계 획득영향요인 상호관계 분석 : 함정획득지연 사례 및 요인 분석을 중심으로)

  • Hwang, Jeong-Oh;Oh, Hyun-Seung;Choi, Bong-Wan;Yim, Dong-Soon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.48-58
    • /
    • 2020
  • Naval weapons systems of the Republic of Korea are acquired through the Defense Planning Management System. Recently, acquisition of some naval ships have been delayed, and the causes of the delays have been recognized as inappropriate project management at the Execution Phase. However, we argue that the delay problem in naval ships acquisition should be approached, with due regard for the entire Defense Planning Management System. That is, We should try to investigate from Planning Phase to those of Programming, Budgeting and Execution Phases. Therefore, in this study, we investigated the actual cases of the delay in naval acquisition at all phases of the Defense Planning Management System. Based on the investigation, we tried to identify the naval ship Acquisition Delay Factors and find out the Weights of those factors. As the next step, we calculated the Influence Measures on the naval missions, including the Cost of Naval Capability Gap derived from the delays in acquisition of naval ships. As a final step, we calculated the Acquisition Delay Measures based on the interrelationship between the Acquisition Delay Factors and the Influence Measures. Then we evaluated and analyzed what the results stand for. Finally, we made suggestions for future improvement. The improvement suggestions we made for preventing delay in acquisition of naval ships in this study are as follows. First, we need a shift in perception. It is necessary to measure the Acquisition Delay Factors in acquiring naval ships and manage them from the Planning Phase. Second, resolution must be concerted efforts. All relevant agencies, not just a few, should work together to resolve the problems of acquisition delay. Third, analysis must be based on the accumulation of data. This allows the elaborating of naval ship Acquisition Delay Factors and Delay Measures. If this research method is applied to other military weapons systems in the future, we may be able to not just identify the Acquisition Delay Factors in acquisition of other military weapons systems, but also pursue improvement in those cases.

Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project (사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안)

  • Cho, Tae-Jea;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Project delay is one of the most crucial impact factors in the construction process from a schedule and cost management perspective. This study focused on analyzing the causes of concrete frame work delay in the apartment construction project. According to the analysis of project cost composition, the direct cost of concrete works was highest in most samples. Actual delays of concrete works were analyzed for the six different construction components. Causes of delay were grouped into two categories; preconstruction and construction phases and these two groups were further divided into sub-groups. Analysis results revealed that the most significant delay was occurred in the 1st. floor concrete skeleton work. For each delay factor, implications of delay as well as suggestion(s) for reducing the possibility of schedule delay are provided.

Critical Factors Causing Delay on State-Funded Construction Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong;Pham, Nguyen-The-Thanh;Nguyen, Thanh-Long;Nguyen, Tuan-Kiet
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.104-108
    • /
    • 2015
  • Delay on State-Funded Construction Projects (SFCPs) in Dong Thap - a province in Mekong Delta of Vietnam, as many provinces of Vietnam, have caused budget overrun through many recent years. The budget-overrun situations, in turn, have deepened the delay. Identifying critical factors affecting delay SFCPs plays a key role to mitigate negative impact of delay. 134/160 questionnaires were collected from personals working for project owners, consultants, supervisors and contractors in Dong Thap Province. Convenient sampling method was used. EFA was resulted in critical 04 factors with 20 variables caused delay in SFCPs, including: "Project technic, contractor's financial capacity and adjustment role of the government", "Regulation and Policy", "Mutual benefit support and concern between the government and residents", and "Disadvantage of construction site and weather season". Reliable measures to reduce delay on SFCPs are discussed to establish legal corridors to strictly controlling the process, consider mutual benefit between the government and its residents, and evaluating construction conditions. Those measures are considered could be applied in not only Dong Thap province, but most provinces of Vietnam as well.

  • PDF

A Study on the Work Delay Factors of Reinforced Concrete Work in Apartment House Construction (공동주택 철근콘크리트 공사 작업지연요인에 관한 연구)

  • Lee, Hyun-Chul;Lim, So-Yean;Yeo, Sang-Ku;Go, Seong-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.55-61
    • /
    • 2009
  • In order to conduct construction projects effectively, the work delay factors would be managed by planned construction schedules. As construction works are delayed ceaselessly, the solution is to select and manage the key factors which delay the work ceaselessly. The subjects of this study were an apartment houses of reinforced concrete structure. Hidden work delay factor were extracted, the surveys were conducted and occurrence, severity and detection of each factor were analyzed. With this result, final orders of priority were fixed and key management factors were deducted and presented.