• Title/Summary/Keyword: Delay Causes

Search Result 503, Processing Time 0.029 seconds

An Improved Model Predictive Direct Torque Control for Induction Machine Drives

  • Song, Wenxiang;Le, Shengkang;Wu, Xiaoxin;Ruan, Yi
    • Journal of Power Electronics
    • /
    • v.17 no.3
    • /
    • pp.674-685
    • /
    • 2017
  • The conventional model predictive direct torque control (MPDTC) method uses all of the voltage vectors available from a two level voltage source inverter for the prediction of the stator flux and stator current, which leads to a heavy computational burden. This paper proposes an improved model predictive direct torque control method. The stator flux predictive controller is obtained from an analysis of the relationship between the stator flux and the torque, which can be used to calculate the desired voltage vector based on the stator flux and torque reference. Then this method only needs to evaluate three voltage vectors in the sector of the desired voltage vector. As a result, the computational burden of the conventional MPDTC is effectively reduced. The time delay introduced by the computational time causes the stator current to oscillate around its reference. It also increases the current and torque ripples. To address this problem, a delay compensation method is adopted in this paper. Furthermore, the switching frequency of the inverter is significantly reduced by introducing the constraint of the power semiconductor switching number to the cost function of the MPDTC. Both simulation and experimental results are presented to verify the validity and feasibility of the proposed method.

Fast Handover Provision Mechanism through Reduction of CoA Configuration Time (CoA 설정 시간 단축을 통한 빠른 핸드오버 제공 메카니즘)

  • Jin, Sung-Ho;Choi, Ji-Hyoung;Kim, Dong-Il
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.11 no.11
    • /
    • pp.2027-2031
    • /
    • 2007
  • Recently the diffusion of the advancement of mobile communication technique and mobile terminal increased, The users were demanded seamless services when carrying and moving. It proposed the FMIPv6(Fast Handoff for Mobile IPv6) from the IETF like this meeting this requirement. The handover procedure of the FMIPv6 causes to defecate with movement detection, new CoA configuration and binding update. But, the delay occurs from each process, when the DAD(Duplicate Address Detection) of the CoA executing, the big delay occurs. This paper proposes a scheme of delay reduction, it omits DAD process and stores in the AR(Access Router) relates in the CoA of the mobile terminal information.

Pediatric tetrasomy 18p presenting as a spastic cerebral palsy: A case report

  • Lim, Ikhyun;Park, Sang Hee;Suh, Mi Ri;Kwak, Hyunseok;Park, Wookyung;Shim, Sung Han;Kim, MinYoung
    • Journal of Genetic Medicine
    • /
    • v.18 no.2
    • /
    • pp.105-109
    • /
    • 2021
  • Tetrasomy 18p is a genetic syndrome caused by an isochromosome consisting of two copies of the short arm of chromosome 18. Clinically, pediatric cases of tetrasomy 18p manifest with global developmental delay, similar to most cases of chromosomal abnormality. In addition, it causes various symptoms including abnormal muscle tone. We report a case of an infant with global developmental delay and remarkable spasticity, the typical phenotype of bilateral spastic cerebral palsy. However, she had a subtle anomaly in her face, and brain magnetic resonance imaging (MRI) findings were inconsistent with her strong upper motor neuron signs. Upon genetic testing, she was determined to have an 18p isochromosome, confirming de novo non-mosaic tetrasomy 18p. Cerebral palsy is a neurological disorder that includes developmental delay caused by a non-progressive lesion in the developing brain. During diagnostic workup in patients with cerebral palsy, genetic testing should be considered when there are minor physical anomalies or equivocal MRI findings.

A Study on the Proper Methodology for Clauses of Delay Claim in the Accounting Regulation to Prevent Delay Claims (국내 회계예규상의 공기지연 클레임 관련사항의 개선방안)

  • Kim Jae-Wook;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.287-291
    • /
    • 2002
  • A construction claim is generally caused by several causes, and in the case of developed countries, the most fundamental problem in most claims is a delay claim. Also, it is predicted that the trouble will increase by this one in a domestic case as well. Even though the construction claims occurred by the delay claim are the most frequent ill construction project, it is very difficult to analyze due to the complexity of occurring forms. Therefore, the rational judgement and the solving method need to be concerned through the accurate understanding the clauses accepted in a international contract execution and a domestic contrail when the claim occurred. The purpose of this study is to present problems and improving methods by comparing FIDIC with a domestic accounting regulation in order to expand a general condition into the international contract condition.

  • PDF

1p36 deletion syndrome confirmed by fluorescence in situ hybridization and array-comparative genomic hybridization analysis

  • Kang, Dong Soo;Shin, Eunsim;Yu, Jeesuk
    • Clinical and Experimental Pediatrics
    • /
    • v.59 no.sup1
    • /
    • pp.14-18
    • /
    • 2016
  • Pediatric epilepsy can be caused by various conditions, including specific syndromes. 1p36 deletion syndrome is reported in 1 in 5,000-10,000 newborns, and its characteristic clinical features include developmental delay, mental retardation, hypotonia, congenital heart defects, seizure, and facial dysmorphism. However, detection of the terminal deletion in chromosome 1p by conventional G-banded karyotyping is difficult. Here we present a case of epilepsy with profound developmental delay and characteristic phenotypes. A 7-year-and 6-month-old boy experienced afebrile generalized seizure at the age of 5 years and 3 months. He had recurrent febrile seizures since 12 months of age and showed severe global developmental delay, remarkable hypotonia, short stature, and dysmorphic features such as microcephaly; small, low-set ears; dark, straight eyebrows; deep-set eyes; flat nasal bridge; midface hypoplasia; and a small, pointed chin. Previous diagnostic work-up, including conventional chromosomal analysis, revealed no definite causes. However, array-comparative genomic hybridization analysis revealed 1p36 deletion syndrome with a 9.15-Mb copy loss of the 1p36.33-1p36.22 region, and fluorescence in situ hybridization analysis (FISH) confirmed this diagnosis. This case highlights the need to consider detailed chromosomal study for patients with delayed development and epilepsy. Furthermore, 1p36 deletion syndrome should be considered for patients presenting seizure and moderate-to-severe developmental delay, particularly if the patient exhibits dysmorphic features, short stature, and hypotonia.

An MAC Protocol Design in Minimizing of Data Transmission Delay for Wireless Sensor Networks (센서 네트워크에서 데이타 전송 지연을 최소화하는 MAC 프로토콜의 설계)

  • Kim, Man-Seok;Kim, Sang-Soo;Koh, Kwang-Shin;Cho, Gi-Hwan;Lee, Moon-Ho
    • Journal of Internet Computing and Services
    • /
    • v.8 no.2
    • /
    • pp.43-54
    • /
    • 2007
  • The effective power consumption is the primary issue in a sensor network which consists of the sensor nodes with limited battery power. So, most of the MAC protocols in sensor networks have been designed with the consideration of energy efficiency. Generally, these protocols make use of the listen and sleep mode periodically. However, this approach inevitably causes a long transmission delay on the data forwarding path, which is mainly resulted from the sleep time of the receiver node. This paper deals with a design of DT-MAC(Data Transmission centric MAC) protocol, with minimizes the data transmission delay while it forces each node to consume its energy efficiently. Thus, a node received a packet converts its remained sleep time to the pseudo_listen time, in which the node is able to transmit a packet. With benefit of the pseudo_listen period, the data transmission delay along with the data forwarding path will be shortened as much as it possible. Therefore, DT-MAC protocol is very suitable to the various applications which require a real time sensing data such as disaster and fire alarm.

  • PDF

Clinical and Biochemical Evaluation of Institutionalized Population with Mental Retardation or Developmental Delay (정신지체 및 발달지연으로 수용된 인구의 임상, 내분비 및 대사 질환 평가)

  • Kim, Sook-Za;Jeon, Young-Mi;Song, Woong-Ju;Kim, Hak-Sung;Cho, Hwa-Yeon;Kil, Hong-Ryang;Kim, Seung-Hwan
    • Journal of The Korean Society of Inherited Metabolic disease
    • /
    • v.12 no.2
    • /
    • pp.94-98
    • /
    • 2012
  • Purpose: Developmental delay and mental retardation are frequently occurring disorders that present major socio-economic burden on the affected individual's family and society. Both can be congenital or acquired. However, a large number of people are institutionalized without exact diagnosis and, as a result, have not received proper care. Methods: 508 subjects with mental retardation or developmental delay from six institutions in Chung Buk Province were clinically evaluated and screened for metabolic and endocrinologic problems between 2000 and 2012. Results: Clinical genetic disorders were observed in 52 (10.2%) subjects. Cerebral palsy attributed to 21% of the institutionalized. 18 (3.5%) were diagnosed with metabolic disorders and 13 (2.6%) exhibited secondary endocrinologic dysfunction. Over 16% showed metabolic evidence of malnutrition. Conclusion: 21% and 3.5% of the population institutionalized due to mental retardation or developmental delay were afflicted by preventable cerebral palsy and metabolic disorders, respectively. Through early identification of the causes and early treatment, it may be possible to prevent, reduce, or alleviate the disability of many institutionalized individuals. Further research is imperative for establishing guidelines for diagnostic investigation for mental retardation.

  • PDF

Analysis and Evaluation of Reduction of Impact Force in a Coupler when a Long Freight Car Brakes (장대화물열차 제동 시 연결기에 발생하는 충격력 해석 및 분석)

  • Lee, Jeong Jun;Koo, Jeong Seo;Cho, Byung Jin;Na, Hee Seung;Mun, Hyung Seok
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.17 no.1
    • /
    • pp.130-137
    • /
    • 2018
  • In long freight trains, there is a brake time delay in the neighboring freight cars that causes damage and fractures of couplers, especially the knuckle of them. If there is a problem for couplers in the cars, this could cause a derailment and lead to damage of human life and property damage. In this study, maximum forces on the couplers are studied when a long freight car brakes, with brake delay time and coupler gap. We have made a dynamic model of 50 freight cars and couplers, applying contact between couplers and a characteristic curve for expressing force and displacement of buffers with SIMPACK, a multi-body dynamics program. We use EN 14531-2 from the British Standards Institution, a standard of freight car brakes for the verification of the dynamic model. We also use a simplified method to analyze the dynamic model of 50 freight cars. With changing coupler gap and brake delay time, we do comparative analysis with AAR M-201 from the Association of American Railroads, a standard of AAR couplers. From this result, we find that the standard on fatigue limit is satisfied, such that the brake delay time is within 0.06 second if the coupler gap of the AAR coupler is within 20 millimeters.

An Analysis of Primary Causes for Waiting for Inpatient Admission and Length of stay at Emergency Medical Center(EMC) (응급의료 센터의 체류 및 입원대기 시간 지연 요인 - 일개 의료기관을 중심으로 -)

  • Kil Suk-Yong;Kim Ok-Jun;Park Jin-Sun
    • Journal of Korean Academy of Fundamentals of Nursing
    • /
    • v.6 no.3
    • /
    • pp.522-531
    • /
    • 1999
  • This research identifies the ingress to egress primary factors that causes a patient to receive delayed emergency medical care. This material was collected between February 1st to 28th, 1998. Research envolved 4,118 people who visited the college emergency medical center in Kyeongido Province, South Korea. Medical records were examined, using the retrospective method. to determine the length of stay and the main cause for waiting. Results are as follows : 1. The age group with the highest admission rate was 10 and under, approximately 1,394 (33.9%). Followed by an even distribution for ages between 11-50 at 10-15% for their respective ranges. The lowest admission rate was 50 years and above. 2. From the 4,118 records examined, 3,489 received outpatient treatment (84.7%); 601 were admitted for inpatient care (14.6%); 25 arrived dead on arrival (0.6%); and 4 people died at the hospital. 3. Between 7PM to 12AM, 42.9% were admitted to the EMC. The hours from 9PM to 11PM recorded the highest admission rate and 5AM to 8AM was the lowest From 8PM to 12AM, the most beds were occupied. 4. For most patients. the average length of stay was approximately 2.2 hours. By medical department, external medicine was the longest for 2.8 hours. Pediatrics was the shortest for 1.6 hours. The average waiting period for inpatient admission was 2.6 hours. Inpatient admission for pediatrics and external medicine was 3.4 hours and 2.2 hours respectively. 5. Theses are primary factors for delay at EMC: 1) pronged medical consultations to decide between inpatient versus outpatient treatment, and delaying to be inpatient, 2) when you call physicians they are delayed to come 3) Understaffing during peak or critical hours, 4) Excessive consulting with different medical departments, 5) some patients require longer monitoring periods, 6) medical records are delayed in transit between departments, 7) repeated laboratory tests make delay the result, 8) overcrowded emergency x-ray place causes delay taking x-ray and portable x-ray, 9) the distance between EMC and registration and cashier offices is too far. 10) hard to control patient's family members. The best way to reduce EMC waiting and staying time is by cooperation between departments, both medical and administrative. Each department must work beyond their job description or duty and help each other to provide the best medical service and satisfy the patient needs. The most important answer to shortened the EMC point from ingress to egress is to see things from a patient point of view and begin from there to find the solution.

  • PDF

A Heuristic Methodology for Fault Diagnosis using Statistical Patterns

  • Kwon, Young-il;Song, Suh-ill
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.17-26
    • /
    • 1993
  • Process fault diagnosis is a complicated matter because quality control problems can result from a variety of causes. These causes include problems with electrical components, mechanical components, human errors, job justification errors, and air conditioning influences. In order to make the system run smoothly with minimum delay, it is necessary to suggest heuristic remedies for the detected faults. Hence, this paper describes a heuristic methodology of fault diagnosis that is performed using statistical patterns generated by quality characteristics The proposed methodology is described briefly as follows: If a sample pattern generated by random variables is similar to the number of prototype patterns, the sample pattern may be matched by any prototype pattern among them to be resembled. This concept is based on the similarity between a sample pattern and the matched prototype pattern. The similarity is calculated as the weighted average of squared deviation, which is expressed as the difference between the relative values of standard normal distribution to be transformed by the observed values of quality characteristics in a sample pattern and the critical values of the corresponding ones in a matched prototype pattern.

  • PDF