• Title/Summary/Keyword: Defect liability

Search Result 71, Processing Time 0.032 seconds

Legal Direction of Defect Warranty Liability in the Korean Construction Industry

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.195-202
    • /
    • 2018
  • The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.

Comparative Review on Term of Warranty Liability of Reinforced Concrete Work through Occurred Defect Data Analysis in Apartment Building (공동주택 하자실적자료 분석을 통한 철근콘크리트 공사의 하자담보책임기간 비교연구)

  • Seo, Deok-Seok;Park, Jun-Mo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.266-267
    • /
    • 2017
  • As apartment buildings defect lawsuits become socioeconomic problems, an objective basis system for the term of warranty liability of reinforced concrete constructions is urgent. This study was carried out as a basic study for developing a basis system for the term of warranty liability. To do this, defect data actual collected in apartment complexes were collected and analyzed. As the result of checking the cumulative rate of defect occurrence in reinforced concrete construction by year, the point of time of reaching the 90% level was the 5th years, which was similar with the provision of the Apartment Building Management Act. However, the current Supreme Court precedent has decided that the term of warranty liability for the main structural parts in reinforced concrete construction shall be 10 years and the dispute is expected to continue in the future in the defect lawsuit.

  • PDF

Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

On the problem and improvements about 'End of Confirmation for Defect Liliability' on the Management of Apartment Houses Decree (공동주택관리법 하자담보책임 종료 확인 절차의 문제점 및 개선방안)

  • Kim, Jin-Kuk;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.274-275
    • /
    • 2017
  • Decree on the Management of Apartment Houses. Article 36 (Liability for warranty Repair Defects), Article 37 (About Repair Defect, etc), and its implementing ordinances, Article 36 (Term of warranty liability) Article 37 (Defect criteria), Article 38 (procedure of Repair defect), Article 39 (type of warranty liability), Enforcement Rule Article 17 (Certifiation of warranty liability). On the basis of the upper Decree, In spite of Standard and forms of 'Completion of Repair Defect' was exist, it was hard to receive 'End of Confirmation' in practice. The purpose of this study is to propose basics in order that Practitioners can apply problems and improvements about Decree on the Management of Apartment Houses.

  • PDF

A Study on the Contractor's Liability for Defect in Public Construction Project - through comparing Civil Law with Government Contract Law - (공공건설사업 하자에 대한 수급인의 책임에 대한 연구- 민법과 국가계약법령의 비교를 통하여 -)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.69-79
    • /
    • 2001
  • Characteristics of Contactor's Defect Liability was too many discussed. But it's not clearly defined yet. Because recent Government Construction Projects are very complex and executed through long time, too many conflicts were appeared related to Contactor's Defect Liability. Therefore to analyse and to resolve the conflicts legal aspects of Contactor's Defect Liability stated in Civil Law and Government Contract Act was systematically compared. The result of this research is as follows : (1) Characteristic of Contactor's Defect must be regarded as a breach of Contract and be an incomplete contract implementation. (2) To decide the range of Damage, Characteristic of Defect must be regarded. (3) Contactor's Defect Liability must be effectual from the day of delivery. (4) Retainage must be added to secure the completion during the Contract Period and Defect Repairing Liability must be omitted in the Contract performance Security.

  • PDF

The Product Defectiveness to Products Liability Claims in China (중국의 제조물책임 관련법규에서의 제조물결함에 관한 연구)

  • Lee, Shie-Hwan
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.34
    • /
    • pp.3-26
    • /
    • 2007
  • Product liability law lies at the center of the modem world. This law concerns liability for damages arising from the commercial sale of a product that causes personal injury or property damage because it was defective or falsely represented. One engaged in the business of selling or otherwise distributing products who sells or distributes a defective product is subject to liability for harm to persons or property caused by the defect. In short, product defectiveness is the heart of products liability law. Regardless of the underlying cause of action, the plaintiff in nearly every products liability case must prove that the defendant's product contained an unnecessary hazard that caused the harm. The purpose of this paper is to clarify the meaning of the product defectiveness to products liability claims in China. In China, Product to include most movable personal property, but to exclude services. And a product is defective when, at the time of sale or distribution, it contains a manufacturing defect, is defective in design, or is defective because of inadequate instructions or warnings.

  • PDF

A Study on the Term of Warranty Liability by the Law-suit Requesting of the Guarantee against Defects in the Apartment Building (공동주택 하자보증금 청구소송에 의한 하자담보책임기간 연구)

  • Koo, Hae-Shik
    • KIEAE Journal
    • /
    • v.12 no.3
    • /
    • pp.11-18
    • /
    • 2012
  • The purpose of this study is to contribute to solution of the defect dispute in apartment house in advance. We want to propose the improved devices in defect problems by investigating the money that exacted from the practical business of the inspection company and the money that a judge gave a decision in a civil court in 50 cases of the lawsuit to requesting the guarantee against defects and the improved schemes of the applied rate by analyzing the diagnosis money of each applied years about the term of warranty liability in 40 cases of the lawsuit separately from that. As the result, we have to reflect the defect of non construction and error construction on apartment building defects, which recognizes very important factor when we compute the defect repair warranty money and it needs to be rearranged the applied ratio in guarantee peried of housing law practically.

Basic Research on Evaluation of Defect Repair Period of Finishing Works in Apartment Houses according to Performance Data (실적자료에 의한 공동주택 마감공사의 하자보수기간의 적절성 평가 기초연구)

  • Kim, Dae-gil;Lee, Ung-Kyun;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.245-246
    • /
    • 2015
  • Cases of lawsuit and conflict are increasing because of defects in apartments in use after the completion of construction. Further, with changes in the consciousness of residents and in the social environment, many residents are showing interest in defect-related lawsuits. However, the term of warranty liability defined in the current law is not practically appropriate, and the verification of the determination of the term of warranty liability is insufficient. Against this background, this research aims to evaluate the appropriateness of defect repair periods by examining the actual defect condition of the finishing work among the various defects related to apartments. Collected performance data are analyzed by statistical techniques by considering the defect occurrence rate per construction type and the construction year of the finishing work in apartment construction. The analysis results will be used as basic data for evaluating the appropriateness of the standards for the term finishing works warranty liability.

  • PDF

Analysis of the Truck Fire Caused by Return Spring Defect of a Braking System during Expressway Driving (고속도로 주행 중 제동장치 리턴스프링 결함으로 발생한 트럭화재의 분석)

  • Kim, Younhoi;Lee, Euipyeong
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.2
    • /
    • pp.148-155
    • /
    • 2014
  • Most truck fires breaking out on the expressway are directly damaged by fire destruction of truck and freight and many of them cause indirect damage such as serious traffic holdups. This study analyzed the fire causes and their liability of the 25-ton truck fire breaking out during expressway driving. This truck fire was caused by manufacturing defect of return spring of a braking system. The fire liability rested with a maker(manufacturer) rather than a truck owner or a driver and the maker also bore fire liability based on the Product Liability Law.

A study on the Quality Management System of Medium and Small-sized Enterprises under Product Liability Law (제조물책임법 시행에 따른 중소기업 품질경영시스템에 관한 연구)

  • 배성아;김복만
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.362-365
    • /
    • 2001
  • Human, physical damage is happened frequently to consumer's safety accident by product defect on modern industrial society. Accordingly, advanced nation including the United States of America enforce product liability law and is protecting consumer more actively from danger of product defect. Our country(Korea) may enforce product liability law since July, 2002, and if business does not grope effective confrontation way about PL, capital strength weak smaller enterprise and venture business corporation's competitive power may affect much corporation's competitive power enfeeblement and survival. This research supplement based on induction and operating QMS in smaller enterprise essential factor that corporations must equip according to product liability law enforcement. And we present integration quality management system model of Product liability to do so that smaller enterprises may can cope effectively at force of Product liability law.

  • PDF