• Title/Summary/Keyword: Database Construction

Search Result 1,438, Processing Time 0.025 seconds

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

WORKFORCE INFORMATION DATABASE AND RFID TECHNOLOGY TO TRACK AND MANAGE WORKFORCE INFORMATION

  • Yong-Woo Kim;Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1094-1099
    • /
    • 2009
  • Workforce information is important in production planning because production planning requires matching a production unit's capacity to loads of assignments. However, tracking and managing workforce information such as skills and accident history is not an easy job. This paper describes a prototype database system for a workforce database system that employs RFID technology. This system tracks daily workforce production capacity on sites. A pilot project is described to explore the benefits and possibility of using radio-frequency identification (RFID) to track and manage workforce information, and is followed by the results of a survey to identify benefits. In addition to the survey identifying the benefits of the database system, the paper also presents a list of challenges through a series of interviews.

  • PDF

A Comparative Study about Construction and the Service of the Domestic Biographical Database (국내 인물데이터베이스의 구축과 서비스에 관한 비교 분석)

  • Han, Sang-Kil
    • Journal of Korean Library and Information Science Society
    • /
    • v.39 no.4
    • /
    • pp.331-352
    • /
    • 2008
  • The person information is a database given free most lively. This study investigates the construction of the domestic person information database and the service present situation. And I compare a search item and a search method with problems for the biographical database construction process and analyze it. I analyze the problems of the person information database and show the person idea who can solve this. I use term relations and the attribute data of the person which used thesaurus by biographical database construction with this purpose.

  • PDF

Developing an IFC-based database for construction quality evaluation

  • Xu, Zhao;Li, Bingjing;Li, Qiming
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.301-312
    • /
    • 2017
  • Quality evaluation and control represent increasingly important concerns for construction quality management. There is an evident need for a standard data model to be used as the basis for computer-aided quality management. This study focuses on how to realize evaluation of construction quality based on BIM and database technology. In this paper, the reinforced concrete main structure is taken as an example, and the BP neural network evaluation model is established by inquiring current construction quality acceptance specification and evaluation standard. Furthermore, IFC standard is extended to integrate quality evaluation information and realize the mapping of evaluation information in BIM model, contributing to the visualization and transfer sharing of evaluation information. Furthermore, the conceptual entity model is designed to build quality evaluation database, and this paper select MySQL workbench system to achieve the establishment of the database. This study is organized to realize the requirement of visualization and data integration on construction quality evaluation which makes it more effective, convenient, intuitive, easy to find quality problems and provide more comprehensive and reliable data for the quality management of construction enterprises and official construction administratiors.

  • PDF

BIM-Based New Construction Technology Database Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM 기반 건설신기술 데이터베이스 구축)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.163-164
    • /
    • 2023
  • The active promotion of construction technology application, aimed at cost reduction, construction time shortening, and performance enhancement during the implementation of Value Engineering (VE) in design, is underway. However, in the process of deriving VE ideas, it is common to simply reuse VE ideas from similar past construction projects, and the application of construction technology is often insufficient. Therefore, in this study, we intend to establish a database linking construction technology information with Building Information Modeling (BIM) models to activate the application of construction technology in the process of deriving VE ideas.

  • PDF

A Fundamental Study on Development Framework of Integrated Database for Construction CALS (건설CALS 통합데이터베이스 구축을 위한 기초적 연구)

  • Kwon Sung-Hyun;Moon Sung-Woo;Lee Cheol-Kyu;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2002
  • To establish integrated Database, this paper (1) grasped key success factors of integrated data environment, (2) selected linking information through investigating information-oriented projects and database necessary to perform construction project in public section, (3) divided selected information into project-based information and general information, and then (4) presented plan of sharing knowledge through using the linking method of knowledge database and meta-database.

  • PDF

Standardization of the Construction Process and Development of the Process Management Software for Spatial Database Quality Maintenance (공간데이터베이스 품질유지를 위한 구축 공정 표준화 및 공정관리 소프트웨어 개발)

  • 최병길;김성수;조광희
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.21 no.1
    • /
    • pp.89-97
    • /
    • 2003
  • This study is aimed at standardizing the process of spatial database construction and developing a software tool for process management. Knowhow of five GIS firms and provisions of NGI(National Geography Institute) was analyzed. In this study, the process of spatial database construction was standardized. The system from this study has the capability to manage the process of construction database using GIS and to deal with the metadata of unit map, generated from the process, systematically and continuously. The process was also shown by using either Gantt chart or PERT chart after developing an interface for "MS Project". A software "Visual Basic for Application" was used for this study.

A Study on Inventory of Cut-Slope using the Mobile PC (Mobile PC를 이용한 절토사면 현황조사에 관한 연구)

  • Rhee, Jong-Hyun;Kim, Seung-Hee;Kim, Seung-Hyun;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.813-820
    • /
    • 2008
  • We have developed inventory database program which is available in the mobile PC. The mobile PC is convenient in terms of portability, data input, modification, practicality of various program and data confirmation in site. By utilizing the inventory database program in mobile PC, we are able to complete database in site. Then, database is converted into the Hangul document and Excel worksheet. Also, based on the above procedure, effective management and utilization of inventory on cut-slope can be achieved.

  • PDF

Establishment of Change Order Database for Reducing Change Order in Construction Phase

  • Shin, Hyun-Kyung;Cha, Yongwon;Han, Sangwon;Hyun, Chang-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.622-624
    • /
    • 2015
  • As uncertain factors are latent in a construction project by nature, a change order occurs frequently. The occurrence of change orders in construction projects conducted during construction phase is known to cause unexpected negative impacts such as cost overrun, schedule delay, quality problem, and claims in the post-process. Thus, an efficient management method is necessary to prevent and minimize change orders during construction phase when they occur frequently. This paper analyzed the causes of change orders and the impact factors that occur during the construction phase of a construction project and suggested a direction for change order database building.

  • PDF

PRACTICAL USE OF INDOOR SPATIAL DATABASE

  • Wenyuan Luo;Yoon-Sun Lee;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1491-1496
    • /
    • 2009
  • Because of the development of advanced construction technology, the inner environments of building become more and more complicated, which may result in many problems. The administer may forget where they put up the certain picture, and search for it all over the building, or they underestimate the number of the visitors, and find the situation is out of control, while the pedestrian may get lost, and after making their efforts, they found they turned back to the origin point again. So it is very necessary to establish an indoor spatial database. On one hand, it is able to assist administrator to manage the property and human flow inside the building, on the other hand it could help the pedestrian find the way easily especially when they are not familiar with the building or there is an emergency. This paper focused on how to create the indoor spatial database including both static database and moving objects database. The static database is built on the basis of 3D building models, and the moving objects database gets information from many kinds of cameras and sensors installed in the building. And at the same time the paper discussed the practical use of indoor spatial database mainly in three aspects including consistency management, building restructure, and pedestrian navigation.

  • PDF