• 제목/요약/키워드: Data construction

검색결과 9,772건 처리시간 0.033초

사업초기단계에서 토지비 및 건축공사비 산정을 위한 의사결정프로세스에 관한 고찰 - 제주도 내 주택건설사업 중심으로 - (A Review on the Decision-making Process for Calculating Land and Construction Costs in the Early Stages of the Project - Focusing on the Housing Vonstruction Project in Jeju Island -)

  • 조성민;조성희;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.321-322
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

상업건축물의 공사칠적 데이터베이스(DB) 모델구축 밑 응용방안 (A Study on the Actual Construction Database Modeling and Application for Commercial Buildings)

  • 김선국;이성호;김태희;주진규
    • 한국건설관리학회논문집
    • /
    • 제3권1호
    • /
    • pp.83-90
    • /
    • 2002
  • 공사실적자료는 후속 공사에서 다양하게 활용할 수 있음에도 불구하고 공사 준공과 함께 방치되어 효율적으로 활용되지 못하고 있다. 이러한 문제점을 개선하기 위하여 다양한 연구가 진행되어 왔다. 본 논문은 이러한 연구의 일부로서 공사실적 데이터베이스를 후속 공사에 효율적으로 활용하기 위한 데이터 모델과, 이를 응용할 수 있는 방안을 자원 중심으로 제시하는 것을 목적으로 한다. 대상 건축물은 주거용 건축물과 함께 가장 많이 건축되는 상업건축물을 선정하였다. 데이터 모델을 구축하기 위하여 상업 건축물의 공사 영향요인 및 기획, 설계, 조달, 건설단계 등의 이용자별 필요정보를 분석하였다. 응용방안은 공사실적자료의 활용가치가 높은 원가와 자원관리 부분을 중심으로 제시하였고, 실적자료와 관련된 기개발 시스템에 지원이 가능할 것으로 기대된다.

IT 기술 기반의 건설 생산성 정보 및 영향요인의 수집 및 활용 (Collection and Utilization of the Construction Productivity Data and the Influence Factors Using Information Technology)

  • 이현정;오세욱;김영석;김예상;김상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.548-553
    • /
    • 2006
  • 건설 프로젝트에 있어서 생산성은 프로젝트의 성과측정 및 향후 공사계획 수립 등 매우 중요한 공사관리의 기능을 지니고 있다. 건설 현장의 특성상 작업에 영향을 미치는 요인들이 많이 존재하며, 이러한 요인들에 의해 건설 공사에는 변화가 많이 발생하고 따라서 건설 생산성을 정확히 분석하고 예측하는 것은 매우 어려운 실정이다. 국내 대부분의 현장에서는 생산성 데이터와 관련된 정보의 수집 및 분석 방법이 체계화되어 있지 못하여 건설 생산성 관리와 관련된 사항을 대부분 현장관리자의 경험과 직관에 의존하고 있는 상황이다. 이는 건설 공사 관리의 신뢰성을 저하시키는 요인이 될 수 있으며 공사 일정에 차질이 발생할 경우 무리한 공사로 인한 부실시공이나 일정 지연 등의 결과를 초래하여 큰 손실을 야기할 수 있다. 따라서 건설 프로젝트에서 발생하는 생산성 데이터와 생산성 영향요인들을 체계적으로 수집하여 공사관리에 활용하기 위한 관리체계의 개발이 요구된다. 본 연구에서는 공동주택 구체공사의 단위작업을 중심으로 발생하는 생산성 데이터와 생산성 영향요인을 정의하고, 정보기술을 활용하여 정보의 수집 및 가공을 통한 생산성 분석의 활용 방안을 제시하고자 한다.

  • PDF

건설생산성 관리 시스템 구축을 위한 데이터웨어하우스의 적용 (The Application of Data Warehouse for Developing Construction Productivity Management System)

  • 오세욱;김명호;김영석
    • 한국건설관리학회논문집
    • /
    • 제7권2호
    • /
    • pp.127-137
    • /
    • 2006
  • 건설생산성은 단위작업에서 발생되는 자원의 활동과 이로 인한 산출물간의 관계를 지표로 표현한 것을 의미하며 수집된 건설 생산성 정보는 공사 진행의 효율성 파악, 작업여건 및 투입자원의 성능이 공정에 미치는 영향도 분석, 프로젝트별 성과 측정, 향후 공사계획을 위한 참고자료로서의 활용 등 프로젝트 관리를 위한 다양한 목적으로 이용될 수 있다. 본 연구의 목적은 데이터웨어하우스, OLAP, 데이터 마이닝 기술을 활용하여 PDA 및 바코드를 통해 수집된 생산성 데이터를 축적 및 분석하고, 생산성 예측 모델을 제시하기 위한 방법론을 제안하는 것이다. 이를 통해 보다 효율적이고도 다차원적인 생산성 분석이 가능한 건설 생산성 관리 시스템을 개발하는 것이며, 개발된 시스템은 건설 사업의 합리적인 성과 측정과 유사 프로젝트의 공사계획 수립에 활용할 실적데이터를 축적할 수 있을 것이다.

공종분류체계를 활용한 도시철도 시설물 유지관리시스템 개발 (The Development of Urban Metro Maintenance Facility System Using Construction Classification System Management)

  • 현지훈;양병수;문성우
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.69-77
    • /
    • 2012
  • 건설정보를 효과적으로 관리하기 위해서는 데이터 생성부터 유지관리까지 전 과정을 관리해야 한다. 그러나 사업관리정보시스템 (PMIS, Project Management Information System)은 설계를 포함하여 시공단계에서 사업관리를 중심으로 운영하고 있어서 유지관리와의 연계가 부족하다. 본 논문에서는 유지관리분류와 도시철도시설물 공종분류를 활용하여 시공단계에서 발생하는 데이터를 유지관리 활동에 활용하는 프로세스를 제시한다. 유지관리분류와 공종분류를 연계함으로써 시공정보와 유지관리정보를 일괄적으로 추적할 수 있으며, 유지관리 시 필요한 시공정보를 손쉽게 활용할 수 있다. 또한 사업관리정보시스템과 유지관리정보시스템(MMIS, Maintenance Management Information System)을 연동할 수 있으며, 시공정보를 건설사업의 라이프싸이클 정보를 관리할 수 있게 하여 생애비용을 추적관리 할 수 있도록 돕는다. 본 논문에서는 유지관리정보시스템 프로토타입을 개발했으며, 업무적용 시 타당성이 있음을 보여줬다.

건설현장 적용을 위한 디지털맵 노이즈 제거 알고리즘 성능평가 (Performance Evaluation of Denoising Algorithms for the 3D Construction Digital Map)

  • 박수열;김석
    • 한국BIM학회 논문집
    • /
    • 제10권4호
    • /
    • pp.32-39
    • /
    • 2020
  • In recent years, the construction industry is getting bigger and more complex, so it is becoming difficult to acquire point cloud data for construction equipments and workers. Point cloud data is measured using a drone and MMS(Mobile Mapping System), and the collected point cloud data is used to create a 3D digital map. In particular, the construction site is located at outdoors and there are many irregular terrains, making it difficult to collect point cloud data. For these reasons, adopting a noise reduction algorithm suitable for the characteristics of the construction industry can affect the improvement of the analysis accuracy of digital maps. This is related to various environments and variables of the construction site. Therefore, this study reviewed and analyzed the existing research and techniques on the noise reduction algorithm. And based on the results of literature review, performance evaluation of major noise reduction algorithms was conducted for digital maps of construction sites. As a result of the performance evaluation in this study, the voxel grid algorithm showed relatively less execution time than the statistical outlier removal algorithm. In addition, analysis results in slope, space, and earth walls of the construction site digital map showed that the voxel grid algorithm was relatively superior to the statistical outlier removal algorithm and that the noise removal performance of voxel grid algorithm was superior and the object preservation ability was also superior. In the future, based on the results reviewed through the performance evaluation of the noise reduction algorithm of this study, we will develop a noise reduction algorithm for 3D point cloud data that reflects the characteristics of the construction site.

스마트 건설에서 디지털 측량정보의 활용 (Using Survey information of BIM-applied Project - Construction Industry Specialist Interview -)

  • 조재희;최영우;이지우;김환용
    • 한국BIM학회 논문집
    • /
    • 제10권3호
    • /
    • pp.33-42
    • /
    • 2020
  • Recently, in the smart construction field, it is possible to construct spatial information of 3D data base quickly and accurately using drones, LiDARs and ARs,. Most public ordering institutions are pushing for the efficiency of construction work through establishing and announcing road maps and guidelines for utilizing BIM for the entire life cycle of construction. However, in most policies, the impact of 3D data on the entire life cycle is limited by only partially constructing and utilizing 3D data or by being mentioned. In addition, many public institutions, construction companies and planning companies did not actively utilize survey information during the actual construction phase, despite the possibility of using 3D survey information. In order to confirm the utilization of survey information, a total of eight private construction companies were selected and interviewed by experts. The analysis shows that most of companies lack the performance of drone measurements or have a lack of awareness of advantages, and among them, construction companies are relatively active. Based on these opinions, this study examined the usability of surveying information and examined measures to expand the utilization of survey information in legal and institutional aspects, technology development aspects and industrial development.

건설사업 수행성과평가에 대한 분석 고도화 연구 (A Study on Advanced Analysis of Construction Project Performance Evaluation)

  • 김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

건설공사 사후평가결과보고서 표준화 방안 (Standardization for Post-Construction Evaluation Report)

  • 김경훈;이찬규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

Data Refactor 기법의 개선을 통한 건설원자재 가격 예측 적용성 연구 (A Study on the Application of the Price Prediction of Construction Materials through the Improvement of Data Refactor Techniques)

  • 리우양;이동은;김병수
    • 한국건설관리학회논문집
    • /
    • 제24권6호
    • /
    • pp.66-73
    • /
    • 2023
  • 건설 프로젝트는 기획부터 완공까지 공사비 예측, 확인, 그리고 정산 단계로 이루어진다. 건설원자재 평균 가격은 변동성을 지닌다. 하지만 건설 프로젝트의 자재비 산정은 계획단계 시점의 시세를 반영하여 결정되기 때문에, 시공단계에서 자재가 투입될 시점의 시세 변동에 따라 예상한 가격과 차이가 날 수 있다. 건설 산업은 건설원자재 가격 변동으로 인한 수요예측 실패, 프로젝트 비용변경으로 인한 사용자 비용 증가, 예측 체계성 부족으로 인한 손실이 발생한다. 이에 따라 건설원자재 가격 예측의 정확도 개선이 필요하다. 본 연구는 Data Refactor 기법의 개선을 통해 건설원자재 가격 예측 및 적용성 검증을 목적으로 한다. 건설원자재의 가격 예측의 정확도를 높이기 위하여 기존의 데이터 리팩토 간의 저·고빈도의 분류 및 ARIMAX 활용법을 빈도 위주 및 ARIMA 기법 활용으로 개선하여 건설원자재 목재, 시멘트 등 6개 품목의 단기(미래 3개월), 중기(미래 6개월), 장기(미래 12개월) 가격을 예측하였다. 분석한 결과 개선된 Data Refactor 기법을 기반으로 한 예측값이 오차는 줄었고 변동성은 확장되었다. 따라서, 본 연구에서 제안된 Data Refactor 기법을 통해 건설원자재 가격을 더 정확하게 예측하여 예산을 효과적으로 관리할 수 있을 것으로 기대된다.