• Title/Summary/Keyword: Data Life Cycle

Search Result 1,362, Processing Time 0.032 seconds

Life Cycle Assessment of CdTe Photovoltaic System (CdTe 태양광 발전 시스템의 전과정평가)

  • Kim, Yeunhee;Huh, Jinho;Jeong, Jaewoo;Kang, Jeongrim;Choi, Jongdoo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.54.1-54.1
    • /
    • 2011
  • The conventional energy-production system by burning fossil fuels releases many pollutants and carbon dioxide($CO_2$) to the environment. Therefore, many countries pay attention to new and renewable energy and invest in the development of these new technologies for the future energy security. One of the most promising of these technologies is a photovoltaic system. In this study, Life Cycle Assessment(LCA) is carried out to analyse the environmental issues(e.g. global warming, abiotic resource depletion) of CdTe photovoltaic system. The spatial and temporal scope of this study was set in Korea during 2004~2005. We assumed that CdTe photovoltaic system was installed in Mokpo where the amount of solar irradiation was higher than other places in Korea. Based on the present data and some assumptions, greenhouse gas emission was 39.2g $CO_2$-eq./kWh. Therefore the electricity produced by CdTe photovoltaic system is more environmentally friendly than the conventional power generation system.

  • PDF

Application and Life Cycle Cost Analysis for Ice-rink using Seawater Heat Source Cooling System (해수 냉방시스템의 빙상경기장 적용 방안 및 LCC 분석)

  • Park, Jin-Young;Kim, Sam-Uel;Lee, Ho-Saeng;Kim, Hyeon-Ju
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.2
    • /
    • pp.50-55
    • /
    • 2013
  • On a plan for the Winter Olympics 2018, Korean government is in the process of the world's first use of ocean energy for the Olympic ice-rink. This technology will be applied to a seaside town and have possibility of an export industry. In this study, we researched facilities and system for P ice-rink that acts as a cultural center as well as a physical plant in Busan and provided the way that apply by seawater heat source. Also, existing system and seawater heat source system of P ice-rink was analyzed by the most commonly used life cycle cost analysis among economics methods. Such economics data for ice-rink using seawater will be utilized by a basic information.

A Development of BIM Planning Framework for BIM Based Collaboration (BIM 기반 협업을 위한 BIM Planning 체계 개발 - 가상건설 연구단의 CPLM 시스템 중심으로)

  • Yoon, Su-Won;Kim, Seong-Ah;Chin, Sang-Yoon;Choi, Cheo-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.369-374
    • /
    • 2010
  • 최근 건설 산업에서 BIM이 각광 받으면서, BIM 기반의 다양한 엔지니어링 기술 도입 및 프로세스 적용이 시도 되고 있다. 이중 BIM 기반의 프로젝트 운영을 위해서는 BIM의 데이터의 저장, 수정, 배포뿐만 아니라, 관련 주체간의 협업이 가능한 환경이 요구되고 있으며, 이러한 환경 구축을 위해 제조업에서 활용되고 있는 PDM(Project Data Management) 또는 PLM (Product Life-cycle Management) 시스템을 벤치마킹한 CPLM (Construction Project Life-cycle Management)과 같은 BIM 기반 협업 시스템이 등장하고 있다. 하지만 기존의 이러한 협업 시스템의 경우, 건설 프로젝트가 가지는 다양한 계약 방식, 관리 단계, 관련 정보의 체계 등에 대한 종합적 계획 없이 프로젝트의 각 참여 주체들의 기존 관리 방식을 도입함으로써, 당초 BIM 기술을 도입하여 달성하고자 하는 원활한 협업 환경을 구축하는데 한계를 가지고 있다. 따라서 본 연구에서는 최근 BIM 가이드라인의 도입 등에서 시도되고 있는 BIM Planning이라는 개념을 활용하여, BIM 기반 협업 시스템의 구축 이전에 BIM을 관리하기 위한 관리 구조, 방식, 데이터 체계 등을 효과적으로 계획하고, 이를 시스템에 반영시킴으로써 보다 효과적인 BIM 기반 협업 환경이 구축될 수 있는 체계를 제안하였다.

  • PDF

Apache NiFi-based ETL Process for Building Data Lakes (데이터 레이크 구축을 위한 Apache NiFi기반 ETL 프로세스)

  • Lee, Kyoung Min;Lee, Kyung-Hee;Cho, Wan-Sup
    • The Journal of Bigdata
    • /
    • v.6 no.1
    • /
    • pp.145-151
    • /
    • 2021
  • In recent years, digital data has been generated in all areas of human activity, and there are many attempts to safely store and process the data to develop useful services. A data lake refers to a data repository that is independent of the source of the data and the analytical framework that leverages the data. In this paper, we designed a tool to safely store various big data generated by smart cities in a data lake and ETL it so that it can be used in services, and a web-based tool necessary to use it effectively. Implement. A series of processes (ETLs) that quality-check and refine source data, store it safely in a data lake, and manage it according to data life cycle policies are often significant for costly infrastructure and development and maintenance. It is a labor-intensive technology. The mounting technology makes it possible to set and execute ETL work monitoring and data life cycle management visually and efficiently without specialized knowledge in the IT field. Separately, a data quality checklist guide is needed to store and use reliable data in the data lake. In addition, it is necessary to set and reserve data migration and deletion cycles using the data life cycle management tool to reduce data management costs.

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

The Surface Modification and Low Cycle Fatigue Behavior of N+ion Implantated 7050Al Alloy (질소 이온 주입시킨 7050Al합금의 표면 미세구조 변화와 저주기 피로거동)

  • Lee, C.W.;Kwun, S.I.
    • Journal of the Korean Society for Heat Treatment
    • /
    • v.7 no.4
    • /
    • pp.307-317
    • /
    • 1994
  • The surf ace microstructure modification by $N^+$ ion implantation into 7050Al alloy and its low cycle fatigue behavior were investigated. Ion implantation method is to physically implant accelerated ions to the surface of a substrate. High dose of nitrogen($5{\times}10^{17}ions/cm^2$) were implanted into 7050Al alloy using current density of accellerating voltage of 100KeV. The implanted layers were characterized by Electron Probe-Micro Analysis(EPMA), Auger Elecron Spectroscopy(AES), X-Ray Diffraction(XRD), X-Ray Photoelectron Spectroscopy(XPS), and Transmission Electron Microscopy(TEM). The experimental results were compared with computer simulation data. It was shown that AlN was formed to 4500 ${\AA}$ deep. The low cycle fatigue life of the $N^4$ion modified material was prolonged by about three times the unimplanted one. The improved low cycle fatigue life was attributed to the formation of AlN and the damaged region on the surface by $N^+$ ion implantation.

  • PDF

Web-based Materials Property Database System (Web 기반 재료물성 데이터베이스 시스템)

  • Lee, W.K.;Baek, U.B.;Park, P.;Jung, I.H.;Kim, D.M.
    • Proceedings of the KSME Conference
    • /
    • 2001.06a
    • /
    • pp.126-131
    • /
    • 2001
  • Materials property data are necessary to secure the reliability of failure prevention techniques such as inspection and remaining life assessment of civil infrastructure and industrial facilities. However, there is no properly collected data in Korea, and those foreign data are hard to use because of the scattering of the sources, the difference of standards, etc. In this paper, materials property database system which has been constructed at Korea Research Institute of Standards and Science is introduced. Constructed database contains 145,000 numeric data of materials property for 600 kinds of metals and can be retrieved on the internet. The database system provides graphical user interface-based information searching functions necessary for the life evaluation and safety analysis.

  • PDF

On the Development of Systems Safety Requirements Using Hazard Analysis Results (위험원 분석 결과를 반영한 시스템 안전 요구사항 생성에 관한 연구)

  • Kim, Jae-Chul;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.4
    • /
    • pp.9-16
    • /
    • 2011
  • Modern systems become more complex and the demand for systems safety goes up sharply. Thus, the proper handling of the safety requirements in the systems design is getting greatly increased attention these days. Hazard analysis has been one of the active areas of research in connection with systems safety. In this paper, we study a subject on how the hazard analysis results can be incorporated in the systems design. To this end we set up a goal on how to systematically generate safety requirements that should reflect hazard analysis results and be implemented in the systems design and development. To do so, we first review the process for systems design and suggest the associated Model. Then the process and results of hazard analysis are analyzed and Modeled particularly with emphasis on the safety data. The resulting data Model incorporating both the hazard analysis and system life cycle is used in the generation of safety requirements. Based on the developed data Model, the generation of the requirements, the construction of requirements DB, and the change management later on is demonstrated through the use of a computer-aided software tool.

Using Survey information of BIM-applied Project - Construction Industry Specialist Interview - (스마트 건설에서 디지털 측량정보의 활용)

  • Jo, Jae-Hee;Choi, Young-Woo;Lee, Ji-Woo;Kim, Hwan-Yong
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.33-42
    • /
    • 2020
  • Recently, in the smart construction field, it is possible to construct spatial information of 3D data base quickly and accurately using drones, LiDARs and ARs,. Most public ordering institutions are pushing for the efficiency of construction work through establishing and announcing road maps and guidelines for utilizing BIM for the entire life cycle of construction. However, in most policies, the impact of 3D data on the entire life cycle is limited by only partially constructing and utilizing 3D data or by being mentioned. In addition, many public institutions, construction companies and planning companies did not actively utilize survey information during the actual construction phase, despite the possibility of using 3D survey information. In order to confirm the utilization of survey information, a total of eight private construction companies were selected and interviewed by experts. The analysis shows that most of companies lack the performance of drone measurements or have a lack of awareness of advantages, and among them, construction companies are relatively active. Based on these opinions, this study examined the usability of surveying information and examined measures to expand the utilization of survey information in legal and institutional aspects, technology development aspects and industrial development.