• Title/Summary/Keyword: Data Base Construction

Search Result 503, Processing Time 0.028 seconds

Effects of hardness values on the creep rupture strength in a Mod. 9Cr1Mo Steel (Mod. 9Cr1Mo 강의 크리프 강도에 미치는 경도의 영향)

  • Lee, Yeon-Su;Yu, Seok-Hyeon;Gong, Byeong-Uk;Kim, Jeong-Tae
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.637-642
    • /
    • 2003
  • The Modified 9Cr-1Mo steel identified as T91, P91 and F91 in the ASME specification has been widely used for the construction of modern power plants. The available data on the influence of process parameters during manufacturing and fabrication on its properties are not sufficient. In this study, the influence of various thermal cycles on the hardness and the creep rupture strength was analyzed in the base metal and the weldments made in tube and pipe of a Mod.9Cr-1Mo steel. The low hardness, 155Hv, showed low creep rupture strength below the allowable stresses of T91 base metal in the ASME specification. This low value was attributed to the fully recovered dislocation structure and the weakening of precipitation hardening associated with the abnormal thermal cycles.

  • PDF

Design of a knowledge-based controller for job scheduling in assembly (조립 작업에서의 생산계획 수립을 위한 지식베이스형 제어기의 설계)

  • 김성수;서기성;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10a
    • /
    • pp.514-518
    • /
    • 1990
  • This paper describes an experimental Knowledge-Based Control System, named KBCS, for manufacturing and assembly. The KBCS of five parts and function : data-base, knowledge acquisition, optimization, and graphic monitoring. The KBCS is utilized for a FMS which is of five machine centers and automatic assembly lines. Each machine can perform almost all manufacturing functions which some difference in efficiency. Buffers store temporarily the incoming components and the outing components. Parts arrive at assembly lines after many steps of manufacturing, and the transfer path and time are determined by procedural knowledge of control systems. Nine different incoming components are set up. The total control system is expected to perform four algorithms, timing algorithm ,sequencing algorithm, penalty algorithm, and cart algorithm. The construction of controller require basic components of manufacturing systems in which knowledges are formulated on the base of the results and the repeated simulation of KBCS with graphic monitoring system. Simulation results by KBCS are compared with those by the other rules of manufacturing.

  • PDF

A Research on how to turn informationization Database of construction materials to practical use (건설 자재정보 DataBase의 실용화 방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Lee, Hwa-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.747-750
    • /
    • 2007
  • Information of construction material is served through internet to user but it is poor to use information of construction material because of lack of information which is accumulated and insufficience of standardization. So informationization of civil materials are closely connected with works and then it is promoted to be used through works like design, construction etc. Informationization for management of information of construction material which reflects questionnaires about opinion of workers presents promotion by stage considering first, continuous renewal of information of construction material and increase in quantity, second classification system and standardization of terms in order to share and connect information of construction material third, developing inquiry method of material information needed in construction stage fourth, connecting material information DB and application through design and construction.

  • PDF

A Study on the 3D Injection Mold Design Using CATIA API (CATIA API를 이용한 사출 금형의 3차원 설계에 관한 연구)

  • 박주삼;김재현;박정환
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.12
    • /
    • pp.115-125
    • /
    • 2003
  • The design methodology of plastic injection molding die has been gradually moved from two-dimensional line drawings to three-dimensional solid models. The 3D design gives many benefits, a few of which are: ease of design change, data associativity from concept design to final assembly. In the paper represented is the implementation of a program which automatically generates 3D mold-bases and cooling-lines, conforming to given geometric constraints. It utilized a commercial CAD software and the related API(application program interface) libraries. We constructed a DB(database) of typical mold-bases assembled from standard parts, from which the geometry (position & dimension) of a mold-base and composed parts can be automatical]y determined by a few key parameters. Also we classified cooling lines into several typical types and constructed a DB, from which the position of cooling lines is automatically determined. The research is expected not only to simplify construction of a 3D mold-base model including cooling lines but also to reduce design efforts, by way of databases and automatized determination of geometric dimensions.

A Study on the Application of the Construction Management showing up the HuaSungSungYouk-EuGye during the Chosen Dynasty (조선시대 화성성역의궤에 나타난 건설관리 적용에 관한 연구)

  • Yi Tae-Yeual;Lee Sang-Hae;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-346
    • /
    • 2001
  • The purpose of this study is not only to show up the fact which a kind of construction management was applied during the ancient Korea, especially, Chosun Dynasty but also to understand its construction capacity by analysing various information. mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may involve a single person or many thousands. 1'his study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modem construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.

  • PDF

DATA WAREHOUSE PROTOTYPE SYSTEM TO SUPPORT THE MASTER PLAN OF URBAN REGENERATION PROJECT

  • Dong-Hyun Cho;Sang-Geum Lee;Hyung-Jin Park;Kyo-Jin Koo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.361-368
    • /
    • 2009
  • In the Urban Regeneration Project, the scale becomes huge and the composition of participating organizations is complex. It is necessary to establish the master plan fast and effectively harmonize conflict options and interests in the early stage of the project. However, the master planner, who is tasked to establish the master plan, and the master planning team, are difficult to establish the master plan fast while effectively considering various and complex information related to regeneration. The Urban Regeneration Project is composed of various types of computer files like HWP, EXL, PDF, DWG and others. When the master plan is established, it is necessary to link the information items and physical files of urban generation in order to effectively save the files in storage for easy search and utilization. This study developed a prototype system to support participating subjects of the Urban Regeneration Projects. It will effectively utilize the information items in the physical computer files using information blocks and Metadata. The developed system provides the base to effectively manage large amount of documents in the early stage of the Urban Regeneration Project and make effective decision-making using the concept of data warehouse.

  • PDF

Preliminary Investigation for Apply of e-Government Framework at the Construction CALS System (건설CALS시스템에 전자정부 표준프레임워크 적용을 위한 사전 고찰)

  • Yang, Sung-Hoon;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.433-440
    • /
    • 2013
  • The Ministry of Land, Infrastructure and Transport was developed the Construction CALS system for improvement of the construction economy. Construction CALS system is consist by Construction Portal System, Construction Management System, Construction Authorization and Permission System, Compensation Management System, Facility Maintenance Management System and has utilized at construction site of more than 900. Ministry of Land, Infrastructure and Transport and related researcher was proposed method of various function improvements for usability of the system. However, the proposed method was expanded the problems like increase of system management cost and development cost with decrease of data process rate. The problem was increases because has added of only service function without modify of software structure to the system on each different platform base. One of the methods for solving problems is to apply the e-Government framework and then integrated the different platform. The purpose of this paper is analyse of the applicability and efficiency of e-Government framework to the construction CALS system. For that was analyzed the e-Government standard framework and the developments case. And then was verified about the adaption possibility and efficiency by use the Function Point tool.

The Development of a Computer-Assisted HACCP Program for the Microbiological Quality Assurance in Hospital Foodservice Operations (병원급식의 미생물적 품질보증을 위한 HACCP 전산프로그램의 개발)

  • Kwak, Tong-Kyung;Ryu, Kyung;Choi, Seong-Kyung
    • Journal of the Korean Society of Food Culture
    • /
    • v.11 no.1
    • /
    • pp.107-121
    • /
    • 1996
  • This study was carried out to develop the computer-assisted Hazard Analysis and Critical Control Point (HACCP) program for a systematic approach to the identification, assessment and control of hazards for foodservice manager to assure the microbiological quality of food in hospital foodservice operations. Sanitation practices were surveyed and analyzed in the dietetic department of 4 hospitals. Among them, one 762-bed general hospital was selected as standard model to develop computer-assisted HACCP program. All data base files and processing programs were created by using Foxpro package for easy access of HACCP concept. HACCP program was developed based on the methods suggested by NACMCF, IAMFES and Bryan. This program consisted of two parts: the pre-stage for HACCP study and the implementation stage of the HACCP system. 1. Pre-stage for HACCP study includes the selection of menu item, the development of the HACCP recipe, the construction of a product flow diagram, and printing the HACCP recipe and a product flow diagram. A menu item for HACCP study can be selected from the menu item lists classified by cooking methods. HACCP recipe includes ingredients, their amount and cooking procedure. A flow diagram is constructed based on the HACCP recipe. The HACCP recipe and a product flow diagram are printed out. 2. Implementation of HACCP study includes the identification of microbiological hazards, the determination of critical control points, the establishment of control methods of each hazard, and the complementation of data base file. Potentially hazardous ingredients are determined and microbiological hazards are identified in each phase of the product flow. Critical control points (CCPs) are identified by applying CCP decision trees for ingredients and each process stage. After hazards and CCPs are identified, criteria, monitoring system, corrective action plan, record-keeping system and verification methods are established. When the HACCP study is complemented, HACCP study result forms are printed out. HACCP data base file can be either added, corrected or deleted.

  • PDF

4S Framework Construction Structure for Interoperability of Spatial Information (공간 정보의 상호운용성을 위한 4S 기반 프레임워크 구축)

  • Oh, Byoung-Woo;Kim, Min-Soo;Joo, In-Hak;Lee, Jong-Hun;Yang, Young-Kyu
    • Journal of Korea Spatial Information System Society
    • /
    • v.3 no.1 s.5
    • /
    • pp.95-108
    • /
    • 2001
  • The provision of spatial data is a key infrastructural requirement for the promotion of economic growth, environmental quality, social progress, etc. 4S technology integrates 4 kinds of systems that process spatial data: GIS (Geographic Information System), GNSS (Global Navigation Satellite System), ITS (Intelligent Transport System), and SIIS (Spatial Imagery Information System). Spatial data processing field is expected to get synergy effect and overcomes development limit of individual unit technology via 4S technology. This paper discusses both the development of 4S-kernel technology and the construction of 4S-based framework, In the development of 4S kernel technology, we will concentrate on the following issues: the development of 4S base components for reciprocity integration among GIS, SIIS, GNSS and ITS technologies, the development of 4S-Mobile S/W and H/W, 4S-Van components, and national LBS technologies. And in the construction of 4S-based framework, we will especially concentrate on the ISP for overall 4S technologies, the international cooperative research center, and the guide model deduction for supervision and certification of 4S projects. Finally, we examine about how the construction of 4S-baed framework affects 4S industry.

  • PDF

A case study of the technology of measurement system using Global Positioning System(GPS) for high-rise buildings (GPS를 이용한 초고층 시공 측량 기술)

  • Kang, Seon-Chong;Kang, Kyoung-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.187-193
    • /
    • 2006
  • With the development of technology the Global Positioning System(GPS) measurement method which uses the artificial satellites to locate its position has been adopted in construction projects. Especially in civil engineering projects which have not any base points needed to measure their position they use the GPS measurement method has been put to practical use. But it was still difficult to use that method in building construction sites which require more accurate measurement data than the current GPS measurement method can provide. In this paper we introduce a new GPS measurement method adopted in Burj Dubai project which would be the tallest building in the world after its completion.

  • PDF