• Title/Summary/Keyword: Data Base Construction

Search Result 503, Processing Time 0.026 seconds

A Study on the Fault Diagnosis System for Combustion System of Diesel Engines Using Knowledge Based Fuzzy Inference (지식기반 퍼지 추론을 이용한 디젤기관 연소계통의 고장진단 시스템에 관한 연구)

  • 유영호;천행춘
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.27 no.1
    • /
    • pp.42-48
    • /
    • 2003
  • In general many engineers can diagnose the fault condition using the abnormal ones among data monitored from a diesel engine, but they don't need the system modelling or identification for the work. They check the abnormal data and the relationship and then catch the fault condition of the engine. This paper proposes the construction of a fault diagnosis engine through malfunction data gained from the data fault detection system of neural networks for diesel generator engine, and the rule inference method to induce the rule for fuzzy inference from the malfunction data of diesel engine like a site engineer with a fuzzy system. The proposed fault diagnosis system is constructed in the sense of the Malfunction Diagnosis Engine(MDE) and Hierarchy of Malfunction Hypotheses(HMH). The system is concerned with the rule reduction method of knowledge base for related data among the various interactive data.

A study on WSN based ECG and body temperature measuring system for ubiquitous healthcare: 1. the construction of sensor network platform (유비쿼터스 헬스케어를 위한 센서 네트워크 기반의 심전도 및 체온 측정 시스템: 1. 센서 네트워크 플랫폼 구축)

  • Lee, Young-Dong;Chung, Wan-Young
    • Journal of Sensor Science and Technology
    • /
    • v.15 no.5
    • /
    • pp.362-370
    • /
    • 2006
  • The wireless sensor network (WSN) based ECG and body temperature measuring system for ubiquitous health-care were designed and developed. The system was composed of a wireless sensor network node, base station and server computer for the continuous monitoring of ECG signals and body temperatures of patients at home or hospital. ECG signal and body temperature data, important vital signals which are commonly used in clinical and trauma care, were displayed on a graphical user interface (GUI). The data transfer from sensor nodes on patients' body to server computer was accomplished through a base-station connected to a server computer using Zigbee compatible IEEE802.15.4 standard wireless communication. Real-time as well as historical, ECG data of elderly persons or patients, can also be retrieved and played back to assist the diagnosis. The ubiquitous health care system presented in this study can effectively reduce social medical expenses, which will be increased greatly in the coming aging society.

In-construction vibration monitoring of a super-tall structure using a long-range wireless sensing system

  • Ni, Y.Q.;Li, B.;Lam, K.H.;Zhu, D.P.;Wang, Y.;Lynch, J.P.;Law, K.H.
    • Smart Structures and Systems
    • /
    • v.7 no.2
    • /
    • pp.83-102
    • /
    • 2011
  • As a testbed for various structural health monitoring (SHM) technologies, a super-tall structure - the 610 m-tall Guangzhou Television and Sightseeing Tower (GTST) in southern China - is currently under construction. This study aims to explore state-of-the-art wireless sensing technologies for monitoring the ambient vibration of such a super-tall structure during construction. The very nature of wireless sensing frees the system from the need for extensive cabling and renders the system suitable for use on construction sites where conditions continuously change. On the other hand, unique technical hurdles exist when deploying wireless sensors in real-life structural monitoring applications. For example, the low-frequency and low-amplitude ambient vibration of the GTST poses significant challenges to sensor signal conditioning and digitization. Reliable wireless transmission over long distances is another technical challenge when utilized in such a super-tall structure. In this study, wireless sensing measurements are conducted at multiple heights of the GTST tower. Data transmission between a wireless sensing device installed at the upper levels of the tower and a base station located at the ground level (a distance that exceeds 443 m) is implemented. To verify the quality of the wireless measurements, the wireless data is compared with data collected by a conventional cable-based monitoring system. This preliminary study demonstrates that wireless sensing technologies have the capability of monitoring the low-amplitude and low-frequency ambient vibration of a super-tall and slender structure like the GTST.

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

Building Code Typology and Application for Open BIM based Code Checking (개방형BIM기반의 건축법규검토를 위한 법규유형화 및 적용방안)

  • Kim, Inhan;Kim, Yongha;Choi, Jungsik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.3
    • /
    • pp.224-235
    • /
    • 2014
  • Recently, Productivity of the construction industry has been decreasing than other industries. Because of this, BIM is being spread in the construction industry. However, quality criteria for BIM data is insufficient. Regulation information is an important factor for initial architectural design evaluations. However, building code and related regulation are numerous. National building code structure in Korea is much more complex than other countries. The purpose of this study is to suggest the typology method of building code and apply to real regulations. To achieve this purpose, the authors have extracted required information to from original regulation for code checking and suggested mapping methods between extracted information and information of IFC scheme. In addition, the authors have represented EXPRESS-G diagram for extracting information from IFC scheme and suggested code checking method through stair case. Output of this study can be used as a base line data for automated code checking system based on open BIM. Automated code checking system will be utilized in architectural design evaluations and supported to increase design quality. It can be used to mount in SEUMTER that is the construction administration system of Ministry of Land, Infrastructure and Transport (MOLIT).

Study on the Modeling of Health Medical Examination Knowledge Base Construction using Data Analysis based on AI (인공지능 기반의 데이터 분석을 적용한 건강검진 지식 베이스 구축 모델링 연구)

  • Kim, Bong-Hyun
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.6
    • /
    • pp.35-40
    • /
    • 2020
  • As we enter the society of the future, efforts to increase healthy living are a major area of concern for modern people. In particular, the development of technology for a healthy life that combines ICT technology with a competitive healthcare industry environment is becoming the next growth engine. Therefore, in this paper, artificial intelligence-based data analysis of the examination results was applied in the health examination process. Through this, a research was conducted to build a knowledge base modeling that can improve the reliability of the overall judgment. To this end, an algorithm was designed through deep learning analysis to calculate and verify the test result index. Then, the modeling that provides comprehensive examination information through judgment knowledge was studied. Through the application of the proposed modeling, it is possible to analyze and utilize big data on national health, so it can be expected to reduce medical expenses and increase health.

EVMS Database System Implementation for interworking of WBS & CBS based management in Construction Works (건설공사의 활동·내역 연동관리를 위한 기성관리운영시스템(EVMS) 데이터 모델링 및 구현)

  • Park, Hong-Tae;Lee, Bu-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.6
    • /
    • pp.2851-2858
    • /
    • 2011
  • The schedule management in construction project have been performed independently by two method, WBS base management and CBS based management, However, the integrated management model is needed according to efficiency of construction project management and introduction of new EVMS system of KOREA government. For this purpose, interworking database system is designed through efficient modeling of WBS based management data and CBS based management data and relation establishment between entities in this paper. WBS based management DB consists of 4 entities and CBS based management DB consists of 3 entity and one of the 4 WBS DB entities is used to play interworking role between WBS and CBS, Also, attributes of all entities are well defined so that data consistency, integrity and newest are guaranteed. The designed interworking database model was realized using Nex-Pert Pro and the efficiency of data interworking was proved.

Prediction Model Development of Defect Repair Cost for Apartment House according to Performance Data (실적 자료에 의한 공동주택 하자보수비용 예측모형 개발 방안)

  • Kim, Byung-Ok;Je, Yeong-Deuk;Song, Ho-San;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.459-467
    • /
    • 2011
  • The work of constructing apartment housing involves various fields of industry that are linked to each other, and is based on a design document prepared by multiple technicians and architects. Consequently, design errors, material flaws or faulty construction works can cause defects, which sometimes overlap with each other. Construction companies should repair any defects found in a completed building within a specified period of time, and to do this, should establish a business plan by efficiently predicting the cost of defect repair. As it is very difficult for companies to accurately predict the occurrence of defects, historical performance data is used as a base. For domestic apartment housing units, data on the cost of defect repair is insufficient, so there are hardly any methods that can be used to make precise predictions. Therefore, the intent of this study is to develop a model that can predict the cost of defect repair by supply type and area, based on historical performance data with ten years worth of post-completion.

A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase (업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스)

  • Han, Ji-Ho;Nam, Dong-Hee;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF

Extraction of Road Facility Information Using Multi-Imagery (다중영상을 이용한 도로시설물 정보추출)

  • Sohn, Duk-Jae;Yoo, Hwan-Hee;Lee, Hey-Jin
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.10 no.1 s.19
    • /
    • pp.91-100
    • /
    • 2002
  • Recently, many studies on the construction of management system for road facility have been accomplished, and in its process the digital map is used as the essential data for spatial database. But in case where the existing topographical map or completion map of construction data is not sufficient for Data Base construction, the compilation, modification or renewal of digital map should be conflicted with large obstacles. This study intended to extract the road facility information using the image data of various form such as aerial photographs, terrestrial photographs and so on. The terrestrial photographic images are taken by hand-held camera, digital camera and video camera which are widely used and of low price in general. This study used the single frame images only for the raw image data, and the extracted spatial and attribute data from the images are used for modifying and updating the database. In addition, the creating possibility of the digital map in the relative scale using the spatial data extracted from the single images was tried.

  • PDF