Development of Monitoring System for Hull Construction Processes Using TOC Analysis (제약이론을 적용하여 설계된 선각건조공정 모니터링 시스템 개발)

  • Yun, Hoon-Hee;Sheen, Dong-Mok
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.45 no.3
    • /
    • pp.315-321
    • /
    • 2008
  • A large ship usually consists of 300 to 500 blocks, for which it is extremely difficult to monitor the whole manufacturing processes from assembly to erection. In an effort to unify all the data and procedures, shipbuilding companies are installing ERP systems, which have brought great improvement throughout the company as a whole. In some departments, however, the ERP systems are not being fully utilized. This paper analyzes and solves the problems revealed especially at the production departments after an ERP system is installed. In this research, firstly a TOC(Theory of Constraints) analysis is done to find out the best solution for those problems. Secondly, based on the solution found, a Monitoring System for hull construction processes is developed with an improved user interface. The visualization of data is designed to reflect the needs of the production departments. The new system supplements the ERP system in that it selectively utilizes the unified data base and is operated under ERP environment. The system is installed in the production departments and its usefulness is verified.

A Study on the Measurement of Slope by Softcopy Photogrammetry (소프트카피 사진측량에 의한 사면지반 측정)

  • 배상호;이형석;주영은
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.19 no.2
    • /
    • pp.183-188
    • /
    • 2001
  • Topographic map is important for the additional detailed construction planning followed by slope sliding. It is a base map that is used to compute the volume of soil, the cost of construction, and check the stability in the area of slope sliding. In this study, 3D topographic data were acquired appling softcopy photogrammetry to the dangerous slope, and the method which can transform these data to the same coordinates system as early TM coordinates was designed. There was a problem when the one meter contour line was made by analysing the image taken from the distance three hundred meters. By solving this problem, this could be used as important data for the planning of road expansion construction. It is expected to be useful for the measurement of various dangerous area in civil engineering works.

  • PDF

Performance Analysis of Strength Development of FRC Base Depending on Maturity (적산온도에 의한 FRC 기층의 강도발현 성능 분석)

  • Choi, Sung-Yong;Park, Young-Hwan;Jung, Woo-Tai
    • International Journal of Highway Engineering
    • /
    • v.18 no.1
    • /
    • pp.13-21
    • /
    • 2016
  • PURPOSES : In this study, we analyzed the compressive strength characteristics of lean base concrete in relation to changes in the outdoor temperature after analyzing the cold and hot weather temperature standards and calculated the minimum and maximum temperatures when pouring concrete. We examined the rate of strength development of lean base concrete in relation to the temperature change and derived an appropriate analysis formula for FRC base structures by assigning the accumulated strength data and existing maturity formula. METHODS : We measured the strength changes at three curing temperatures (5, 20, and $35^{\circ}C$) by curing the concrete in a temperature range that covered the lowest temperature of the cold period, $5^{\circ}C$, to the highest temperature of the hot period, $35^{\circ}C$. We assigned the general lean concrete and FRC as test variables. A strength test was planned to measure the strength after 3, 5, 7, 14, and 28 days. RESULTS : According to the results of compressive strength tests of plain concrete and FRC in relation to curing temperature, the plain concrete had a compressive strength greater than 5 MPa at all curing temperatures on day 5 and satisfied the lean concrete standard. In the case of FRC, because the initial strength was substantially reduced as a result of a 30% substitution of fly ash, it did not satisfy the strength standard of 5 MPa when it was cured at $5^{\circ}C$ on day 7. In addition, because the fly ash in the FRC caused a Pozzolanic reaction with the progress into late age, the amount of strength development increased. In the case of a curing temperature of $20^{\circ}C$, the FRC strength was about 66% on day 3 compared with the plain concrete, but it is increased to about 77% on day 28. In the case of a curing temperature of $35^{\circ}C$, the FRC strength development rate was about 63% on day 3 compared with the plain concrete, but it increased to about 88% on day 28. CONCLUSIONS : We derived a strength analysis formula using the maturity temperatures with all the strength data and presented the point in time when it reached the base concrete standard, which was 5 MPa for each air temperature. We believe that our findings could be utilized as a reference in the construction of base concrete for a site during a cold or hot weather period.

Structure-From-Motion Approach to the Reconstruction of Surfaces for Earthwork Planning

  • Nassar, Khaled;Jung, Young-Han
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.1-7
    • /
    • 2012
  • The reconstruction of surfaces from unorganized point clouds can provide very useful information for construction managers. Although point clouds are generally created using 3D scanners, they can also be generated via the structure-from-motion technique using a sequence of images. Here we report a novel surface reconstruction technique for modeling and quantifying earthworks that can be used for preliminary planning, project updates and estimating of earthwork quantities, as well as embedded planning systems in construction equipment. The application of structure-from-motion techniques in earth works is examined and its advantages and limitations identified. Data from 23 earthwork excavation construction sites were collected and analyzed. 3D surface reconstructions during the construction phase were compared to the original land form. Similar experiments were conducted with piles of earth and the results analyzed to determine appropriate ranges of use for structure-from-motion surface reconstructions in earthwork applications. The technique was found to be most suited to pile of materials with volumes less than 2000 m3. Piles up to 10 m in height and with base areas up to $300m^2$ were also successfully reconstructed. These results should be of interest to contractors seeking to utilize new technology to optimize operational efficiency.

Development of CITIS Model and Analysis of Its functionality as a Collaborative Virtual Factory for Construction Projects (건설프로젝트의 협업적 가상기업으로서의 CITIS 모델개발 및 성능분석에 관한 연구)

  • Han Seung Heun;Chin Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.87-98
    • /
    • 2002
  • Korea government is making an effort to improve the efficiency in construction industry by introducing CITIS (Contractor integrated Technical Information Service). In order to provide a base for the application of CITIS into the construction industry, this research provides a concept of virtual factory which should be incorporated into CITIS system for the successful collaborative work in the virtual space. It then implements a prototype system through process and data modeling to apply into the road construction projects. The prototype system is tested to verify its efficiency. Finally, lesson learned from these works is provided to advance the current CITIS toward a collaborative virtual factory.

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Analytic study of 4~10 years Defect Deposite Use State based on Actual Data after moving in apartment complex (4~10년차 실적자료에 근거한 공동주택 하자보수 보증금의 사용실태 분석연구)

  • Seo, Deok-Seok;Jeon, Myeong-Soo;Lee, Eun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.153-154
    • /
    • 2011
  • In Korea, the apartment supplier should satisfy the apartment residents' demand on the defect repair found in apartment housing by the law of Management of Apartment Complexs. But in the cost of defect repair, not only the actual defect repair cost, but also the cost of residents' complains are contained. So in this analytic study, the actual use state of defect deposite during 4~10 years after moving in are analysed base on actual data of 15 apartment complexes. In this study, about 66% of defect repair deposites are used to actual defect repair and only 34% of defect repair cost are spent to satisfy the demand of apartment residents'.

  • PDF

Development of a displacement measurement system for architectural structures using artificial intelligence techniques (인공지능 기법을 활용한 건축 구조물 변위측정시스템 개발)

  • Kang, Ye-Jin;Kim, Dae-Geon;Woo, Jong-Yeol;Lee, Dong-Oun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.135-136
    • /
    • 2022
  • As a recent technology, it is possible to partially grasp the occurrence of displacement of the entire building through artificial intelligence technology for big data through scanning. However, scanning and data processing take a lot of time, so there is a limit to constant monitoring, so constant monitoring technology of building behavior that combines wireless remote sensors and 3D shape scanning is required. Therefore, in this study, artificial intelligence program coding technology is linked. In addition, a technology capable of real-time wireless remote measurement of structure displacement will be developed through technology development in response to safety management that combines existing building technologies such as sensors. Through this, it is possible to establish an integrated management system for safety inspection and diagnosis.

  • PDF

Development Procedure of Generic Component Reliability Data Base in PSA and Its Application (확률론적 안전성평가를 위한 일반 기기 신뢰도 데이타 베이스 구축 절차와 적용)

  • Hwang, M.J.;Kim, K.Y.;Lim, T.J.;Jung, W.D.;Kim, T.W.
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.4
    • /
    • pp.241-248
    • /
    • 1997
  • This paper presents the development procedure and application of the generic component reliability data base considering the dependency among dependent generic compendia in NPPs (Nuclear Power Plants) PSA (Probabilistic Safety Assessment) under construction or without operating history. We use MPRDP (Multi-Purpose Reliability Data Processor) code developed in KAERI (Korea Atomic Energy Research Institute) based on a PEB (Parametric Empirical Bayesian) procedure to estimate the reliability. The employed model in this study accounts for the relative credibility as well as the dependency among generic estimates. Numerical examples and the part of summarized reliability data table are provided as the application.

  • PDF

The Study on the Demands and Utilization of 3D Geo-spatial Data in Local Governments (지방자치단체를 위한 3차원 공간정보 활용방안에 관한 연구)

  • Choi, Bong-Moon;Lim, Young-Taek
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2006.05a
    • /
    • pp.71-74
    • /
    • 2006
  • By the progress of Information Technology, spatial data have been recognizes as one of essential infrastructure. Now for the near future needs of urban simulation, management, u-City construction, etc. MOCT(Ministry Of Construction & Transportation) have been driving to construct the 3D Geo-spatial Data as one of National Spatial Data Information on a base of 2D GIS(Geographic Information System). In this study we tried to analysis the demands and the optimum implementation method of 3D Geo-spatial Data in local governments. As the result of study, the plan to utilize 3D Geo-spatial Data and to carry out its utilization, and the advanced vision of 3D GIS in for the public affairs of Local Governments and private business scope were proposed.