• Title/Summary/Keyword: Dam site

Search Result 335, Processing Time 0.031 seconds

Suitable Site Prediction of Erosion Control Dam by Sediment (산지사면에 있어서 퇴사량에 의한 사방댐의 시공적지 예측)

  • Ma, Ho-Seop;Jeong, Won-Ok
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.3
    • /
    • pp.300-306
    • /
    • 2007
  • This study was carried out to analyze the characteristics of forest environmental and stream morphological factors by using the quantification theory (I) for prediction of the suitable dam site. The results obtained from this study were summarized as follows; The selection of suitable site for erosion control dam was estimated by normalized score of each category. And the prediction method of suitable site for erosion control dam divided into class I (Very suitable site), II (Suitable site), and III (Poor suitable site) for the convenience of use. In conclusion, if we select the suitable site for construction of erosion control dam for disaster prevention, we could save the loss of tremendous budget, avoid the poor suitable site due to subjective judgment, and it would promote the functions of erosion control dam.

Effects of low-head dam removal on benthic macroinvertebrate communities in a Korean stream

  • Kil, Hye-Kyung;Bae, Yeon-Jae
    • Animal cells and systems
    • /
    • v.16 no.1
    • /
    • pp.69-76
    • /
    • 2012
  • This study was conducted to examine how a low-head dam removal (partial removal) could affect benthic macroinvertebrate communities in a stream. Benthic macroinvertebrates and substrates were seasonally sampled before and after dam removal (March 2006-April 2007). Benthic macroinvertebrates and substrates were quantitatively sampled from immediately upstream (upper: pool) and downstream (lower: riffle) sites, the location of the dam itself (middle), and immediately above the impoundment (control: riffle). After the removal, species richness and density of benthic macroinvertebrates as well as the EPT group (Ephemeroptera, Plecoptera and Trichoptera) increased to higher levels than those before the removal, while functional feeding groups and habitat orientation groups changed more heterogeneously at the upper site. At the lower site, species richness and density decreased somewhat immediately after dam removal, which was associated with an increase of silt and sand, but recovered after monsoon floods which helped to enhance substrate diversity at the upper site. Decreased dominance index and increased diversity index in both the upper and lower sites are evidence of positive effects from the dam removal. In conclusion, we suggest that even a partial removal of a dam, resulting in increased substrate diversity in the upper site, could sufficiently help rehabilitate lost ecological integrity of streams without major habitat changes.

Environmentally Sound and Sustainable Dam Construction in Asia (Hantan River Dam in Korea)

  • Baek, Unil;Kim, Myunsun;Park, Younghwan;Noh, Seungkyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.134-147
    • /
    • 2004
  • Theses days, there are 3 prerequisites for dam building in Korea: First one is how to build the dam safe and stable from the technical points of view. Second one is how to design and construct the dam environmentally sound with the minimum change of the surrounding area of the dam site. Third one is how to activate the local economy of the surrounding area of the dam site in order to make the dam construction sustainable from the social and economical points of view. As far as technical aspects far dam building, there are hardly any problems in dam design and construction in our country. However, there are a little difficulty according to the location of the dam site. In order to fulfill the second option it is believed that a lot of effort should be made to accomplish the second task not only because that fairly large area shall be inundated with water after impounding but also because that ecological environments shall be changed due to change of water environment. Therefore, thoughtful investigation and assessment of the environmental features of the local regions have to be preceded before starting of the dam building. In order to overcome these difficulties Hantan river dam has been declared as an Eco-dam with 3 strategies and 9 activities plan at the design stage after sufficient consideration of the local identities of these region and coupled national plans for surrounding areas. Finally, Eco-tourism with the several coupled network-wise touristic courses, namely PERTH model, has been proposed after thorough analysis of the local identities by the Jahari window to make local economy being activated. Detailed descriptions for 3 strategies and 9 activities plan for declaration of Eco-dam and proposal of Eco-tourism with the network-wise touristic courses will be mentioned in the main content.

  • PDF

Effect of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam

  • Jun, Byoung-Ho;Shin, Hyun-Suk;Yoon, Jae-Young
    • Korean Journal of Hydrosciences
    • /
    • v.5
    • /
    • pp.17-31
    • /
    • 1994
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in the country. The other is the DWOPER(Dynamic Wave Operational Model) package conducted on four different scenarios: (1) before the construction of the Keumkangsan-Dam and the Peace-Dam; (2) the exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam); (3) the exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam) ; (4) the exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the Hwachun-Dam need to be modified.

  • PDF

Arrival direction effects of travelling waves on nonlinear seismic response of arch dams

  • Akkose, Mehmet
    • Computers and Concrete
    • /
    • v.18 no.2
    • /
    • pp.179-199
    • /
    • 2016
  • The aim of this study is to investigate arrival direction effects of travelling waves on non-linear seismic response of arch dams. It is evident that the seismic waves may reach on the dam site from any direction. Therefore, this study considers the seismic waves arrive to the dam site with different angles, ${\theta}=0^{\circ}$, $15^{\circ}$, $30^{\circ}$, $45^{\circ}$, $60^{\circ}$, $75^{\circ}$, and $90^{\circ}$ for non-linear analysis of arch dam-water-foundation interaction system. The N-S, E-W and vertical component of the Erzincan earthquake, on March 13, 1992, is used as the ground motion. Dam-water-foundation interaction is defined by Lagrangian approach in which a step-by-step integration technique is employed. The stress-strain behavior of the dam concrete is idealized using three-dimensional Drucker-Prager model based on associated flow rule assumption. The program NONSAP is employed in response calculations. The time-history of crest displacements and stresses of the dam are presented. The results obtained from non-linear analyses are compared with that of linear analyses.

Ecological Impact Analysis of a Stream on the Dam Construction Using Species Biotic Index (SBI) as a Tool of Ecosystem Health Assessment

  • An, Kwang-Guk;Kim, Jai-Ku
    • Korean Journal of Ecology and Environment
    • /
    • v.40 no.4
    • /
    • pp.495-502
    • /
    • 2007
  • Species biotic index (SBI), based on a fish assemblage, was applied to a stream assessment using long-term ecological fish data set (1996 to 2001) in Boryong dam area, which is located in the mainstream of Ungchun Stream of Chungnam province, Korea. According to the methods of Hilsenhoff (1988), the scores of tolerance guild assigned 10 classes to each species by its habitat and feeding guild, but modified current 7 criteria to 5 scoring standards due to unclear borderline among species. Relative abundance in the species number of upper stream guilds was only 7% of the total, whereas the abundance in the species number of middle to downstream upper stream guilds was 64%. Mean SBI, based on dataset in Site 1 during 1995-2001 averaged 5.10, which was judged as a "good" condition by the rank criteria of SBI. Before the dam construction, mean SBI in the Site 1 was 4.61, indicating a "good" condition, but after the dam construction, mean SBI was 5.60, indicating a "fair" condition. Trajectory analysis in the Site 1 showed significantly (One-way ANOVA, $F_{6,21}=3.26$, p=0.02) different among years, reflecting the changes of fish composition and population density by the dam construction, whereas Site 2 showed no significant changes ($F_{6,21}=1.00$, P =0.45) difference among years. Mean SBI prior to the dam construction in the Site 3 was 4.52 but after the construction, the value was 6.30, indicating a distinct difference between the pre- and post-dam construction. Trajectory analysis at the Site 3 supported this fact: Values of SBI showed significantly ($F_{6,21}$=14.37, p<0.01) different. Mean SBI was 4.67 in the Site 4, indicating a "good" condition in the health and the health rank was same as the sampling sites 1, 2, and 4. Trajectory in the Site 4 showed no significant ($F_{6,21}=2.35$, p=0.07) difference among the years. Overall, our trajectory analysis indicated that three of four sampling sites (sites 1, 3, 4) showed significant decreases (n=7, p<0.05) and that the proportions of sensitive species declined evidently in the sites 1 and 2 and the tolerant species increased in the dam sites. Our outcomes may be used as a key data for diagnosis of the long-term ecological impact in the future in the watershed.

Influence of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam (화천댐의 홍수량 및 수위에 미치는 평화댐의 영향 분석)

  • 전병호;신현석;이재철;윤용남
    • Water for future
    • /
    • v.26 no.1
    • /
    • pp.93-101
    • /
    • 1993
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in this country. The other is the DWOPER (Dynamic Wave Operational Model) package developed by the U.S. NWS for the hydraulic routing. Flood routing simulations have been performed on four different scenarios:1) Before the construction of the Keumkangsan-Dam and the peace-Dam, 2) The exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam), 3) The exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam), 4) The exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the hwachun-Dam need to be modified.

  • PDF

Development of Suitable Sites Assessment Criteria for Agricultural Subsurface Dam for drought Management using Analytic Hierarchy Process (AHP) (가뭄대비 농업용 지하댐 적지 평가 지표 개발 - 계층분석과정의 적용 -)

  • Myoung, Woo-Ho;Song, Sung-Ho
    • Journal of Soil and Groundwater Environment
    • /
    • v.22 no.6
    • /
    • pp.37-47
    • /
    • 2017
  • Climate change has often resulted in severe droughts in a rice-farming season (i.e., April to June), and the large amount of water resources were needed to cope with droughts during the season. Therefore, the subsurface dam, which is able to store groundwater resources in the alluvium aquifer, has been considered to be an alternative for securing more groundwater resources. In this study, suitable sites assessment criteria for agricultural subsurface dam using analytic hierarchy process (AHP) were established for adequate drought management. Moreover, the criteria were applied to the existing five agricultural subsurface dams to verify their applicability of groundwater supply for each subsurface dam. The assessment criteria were divided into three major categories (geology, hydrology and business condition) and classified to 12 individual sub-categories with weighting. From the assessment, Ian subsurface dam and Wooil subsurface dam were identified as the best and the worst suitable site, respectively, and this result was in accordance with the average amount of annual groundwater supply by each subsurface dam during the period of 2011-2017.

Analysis on dam operation effect and development of an function formula and automated model for estimating suitable site (댐의 운영효과 분석과 적지선정 함수식 및 자동화 모형 개발)

  • Choo, Taiho;Kim, Yoonku;Kim, Yeongsik;Yun, Gwanseon
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.3
    • /
    • pp.187-194
    • /
    • 2019
  • Intake ratio from river constitutes about 31% (8/26) that beings to "water stress country" as "Medium ~ High" with China, India, Italy, South Africa, etc. Therefore, the present study on a dam that is the most effective and direct for securing water resources has been performed. First of all, climate change scenarios were investigated and analyzed. RCP 4.5 and 8.5 with 12.5 km grid resolution presented in the IPCC (Intergovernmental Panel on Climate Change) 5th Assessment Report (AR5) were applied to study watershed using SWAT (Soil and Water Assessment Tool) and HEC-ResSim models that carried out co-operation. Based on the results of dam simulation, the reduction effects of floods and droughts were quantitatively presented. The procedures of dam projects of the USA, Japan and Korea were investigated. As a result, there are no estimating quantitative criteria, calculating methods or formulas. In the present study, therefore, indexes for selecting suitable dam site through literature investigation and analyzing dam watersheds were determined, Expert questionnaire for various indexes were performed. Based on the above mentioned investigation and expert questionnaire, a methodology assigning weight using AHP method were proposed. The function of suitable dam (FSDS) site was calibrated and verified for four medium-sized watersheds. Finally, automated model for suitable dam site was developed using FSDS and 'Model builder' of GIS tool.