• 제목/요약/키워드: Dam outflow

검색결과 105건 처리시간 0.032초

Transverse variability of flow and sediment transport in estuaries with an estuarine dam

  • Steven Figueroa;Minwoo Son
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2023년도 학술발표회
    • /
    • pp.125-125
    • /
    • 2023
  • Estuarine dams are dams constructed in estuaries for reasons such as securing freshwater resources, controlling water levels, and hydroelectric power generation. These estuarine dams alter the flow of freshwater to the coastal ocean and the tidal properties of the estuaries which has implications for the estuaries' circulation and sediment transport. A previous study has analyzed the effect of estuarine dams on 1D (along-channel) circulation and sediment transport. However, the effect of estuarine dams on the transverse variability of along-channel and across-channel circulation and sediment transport has not been studied and is not known. In this study, a coupled hydrodynamic-sediment dynamic numerical model (COAWST) was used to analyze the transverse variability of along-channel and across-channel flow and sediment transport in estuaries with estuarine dams. The estuarine dam was found to change the 3D structure of circulation and sediment transport, and the result was found to depend on the estuarine type (i.e., strongly stratified (SS) or well-mixed (WM) estuary). The SS estuary had inflow in the channel and outflow over the shoals, consistent with estuarine circulation. Longer discharge interval reduced the estuarine circulation. The WM estuary had inflow over the shoals and outflow in the channel, consistent with tide-induced circulation. As the estuarine dam was located nearer to the estuary mouth, the tide-induced circulation was reduced and replaced with estuarine circulation. The lateral circualtion was the greatest in the tide-dominated estuaries. It was reduced and changed direction due to differential advection change as the dam was located nearer the mouth. Overall, the WM estuary transverse flow structure changed the most. Lateral sediment flux was important in all estuaries, particularly for transporting sediments to the tidal flats.

  • PDF

DAMBRK 모형을 이용한 괴연저수지 붕괴유출량 추정 (Estimation of Break Outflow from the Goeyeon Reservoir Using DAMBRK Model)

  • 이진영;박동혁;김성준;김태웅
    • 대한토목학회논문집
    • /
    • 제37권2호
    • /
    • pp.459-466
    • /
    • 2017
  • 최근 지자체 및 한국농어촌공사가 관할하는 저수지의 붕괴가 빈번하게 발생하고 있다. 최근의 사례로, 축조된 지 70년 이상의 노후된 농업용 저수지인 경북 영천시 소재의 괴연저수지가 2014년 08월 21일 9시경 집중호우로 인하여 여수로를 중심으로 붕괴되었다. 본 연구에서는 괴연저수지의 붕괴상황을 DAMBRK 모형을 통하여 재현하였다. 그리고 DAMBRK 모형에서 분석된 댐붕괴 유출량으로 침수범람도를 작성하였다. 괴연저수지 붕괴 당시 무인항공기로 촬영한 침수사진과 비교하여 괴연저수지의 붕괴 지속기간과 붕괴유출량을 추정하였다. 본 연구 결과는 괴연저수지와 같이 저수지 붕괴가 발생할 경우, 하류 지역에 대한 침수피해 예측에 활용할 수 있을 것으로 기대된다.

황룡강 유역 저수지군 하류하천 영향평가 (Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed)

  • 황순호;강문성;김지혜;송정헌;전상민;이상현;최진용
    • 한국농공학회논문집
    • /
    • 제54권3호
    • /
    • pp.103-111
    • /
    • 2012
  • Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.

용담댐 운영이 하류 기준유량 설정에 미치는 영향 (Effect of Yongdam Dam Operation to Level of Reference Flows Downstream)

  • 노재경;유재민;오진영
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.1772-1776
    • /
    • 2006
  • The Ministry of Environment is determining reference flows and goal water qualities in many stations over all around riverbasin to control TMDL. Reference flow is now defined to 10 years averaged 275th minimum flow$(Q_{275})$. Dam operation takes direct effect on flows downstream. The Yongdam mutipurposed dam was constructed in 2002 and TMDL managing stations between the Daecheong dam and the Yongdam dam are the Geumbon B, C, D, E, and F in main stream of the Geum river. Geumbon F is the Daecheong dam site. Observed flows are ideal to be used to set reference flows, but simulated flows are more practical to be used to set reference flows from the cause of the Yongdam dam's operation. A system for simulating daily storages of the Yongdam dam was constructed and the DAWAST model was selected to simulate daily streamflows. Analysis period was selected for 10 years from 1996 to 2005. Scenario was set as follows; Firstly, observed outflows from the Yongdam dam are used from 2002 to 2005 and the Yongdam dam does not exist from 1995 to 2001. Secondly, the Yongdam dam existed also from 1995 to 2001 and simulated outflows from the Yongdam dam are used from 1996 to 2005 with provision of constant outflow of $7.0m^3/s$ and water supply to the Jeonju region outsided watershed of $900,000m^3/day$. In case of scenario 1 reference flows at the Geumbon B, C, D, E, F are 4.52, 6.69, 7.96, 11.17, and $13.21m^3/s$, respectively. And in case of scenario 2 reference flows at the Geumbon B, C, D, E, F are 6.27, 8.48, 9.58, 12.73, and $15.12m^3/s$, respectively.

  • PDF

단지 개발로 인한 우수 유출량 변화 예측 및 저감방안에 관한 연구 - 서울 은평뉴타운 13, 14단지(못자리골)를 중심으로 - (An Analysis of Rainwater Overflow by Housing Development and Overflow Decrease Method - Focused on the 13, 14 Districts (Motjarigol) of the Eun-pyung New Town in Seoul -)

  • 성종상;이은석;김대희
    • 한국조경학회지
    • /
    • 제34권4호
    • /
    • pp.116-128
    • /
    • 2006
  • This study focuses on hydrological changes caused by developments in the 13th, 14th (Motjarigol) district in Eun Pyoung New Town, Seoul on the basis of the Land Use Planning of development plan. Through analyses from the hydrological experiments about rainfall outflow using universal equation and amounts of infiltration through soils, the changes in amounts of overflows were estimated and the results were discussed from a urban ecological point of view. As a result, it has been predicted that the amount of rainfall outflow at post-development was dramatically increased, compared to pre-development. Installing of Derbris Dams and infiltration facilities were suggested as alternative plan to meditigate these changes. If we apply these alternatives, the rainfall outflow would be reduced up to 30% compared to the development plan without BMPs (Best Management Practice). In conclusion, it is proposed that once the ecological principles were considered during development planning process, we can minimize the adverse effects of developments to our environments.

댐 운영 제약사항을 고려한 섬진강댐 홍수조절방식에 관한 연구 (A study for flood control method of Sumjingang Dam considering dam operation constraints)

  • 이용택;정관수
    • 한국수자원학회논문집
    • /
    • 제57권4호
    • /
    • pp.249-261
    • /
    • 2024
  • 최근 기후변화로 인해 극한홍수가 증가하여 댐 운영에 큰 어려움으로 작용하고 있다. 그간 댐 설계 시 제시되는 홍수조절방식은 하류 상황에 대한 고려 없이 계획홍수량이라는 특정 홍수상황을 가정하여 수립된 것으로, 실제 상황에는 기상예보를 기반으로 저수지 모의운영을 통해 홍수조절을 실시한다. 하지만 기상예보의 불확실성과 댐 관리자마다 달라지는 의사결정 등 한계가 존재한다. 따라서 본 연구에서는 섬진강댐에 대해 댐 유입량을 기준으로 댐 운영 제약사항을 고려한 단계적 방류량 증량을 실시하는 홍수조절방식을 제시하고, 계획홍수량 및 역대 최대홍수사상을 적용한 저수지 모의운영을 통해 효과를 평가하였다. 본 연구에서 제시한 홍수조절방식은 다양한 댐 운영자가 현실적 댐 운영 여건을 반영하여 일관성 있는 홍수조절 의사결정에 활용 가능할 것으로 판단된다.

저수지 붕괴함수의 매개변수 결정이 유량과 침수범위에 미치는 영향 (Impact of Parameters of Nonlinear Breach Progression Curve on Outflow Rate)

  • 이길하
    • 한국환경과학회지
    • /
    • 제28권2호
    • /
    • pp.211-217
    • /
    • 2019
  • A Numerical modeling approach is usually applied to reproduce the physical phenomena of a fill dam-break. The accuracy of the dam-break model depends on the physical structure that defines input variables such as the storage volume, breach formation and progress, and the parameters of the model, which are subjective as they are prescribed by users. In this study, a sensitivity analysis was performed for the nonlinear breach progression curve that was already developed, which includes four parameters. The study focuses on the two of the parameters which control the breach forming time and peak discharge. The model is coupled with a two-dimensional flood simulation model (FLO-2D) to examine flood coverage and depth. It is generally observed that the parameter ${\beta}$ controls only the breach forming time, the parameter ${\gamma}$ is particularly sensitive to the peak flow.

퍼지제어모형을 이용한 다목적 댐의 홍수조절모형( I ) - 단일댐의 운영모형 개발 - (Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( I ) - Development of Single Dam Operation Models -)

  • 심재현;김지태;허준행;김진영
    • 한국방재학회 논문집
    • /
    • 제4권1호
    • /
    • pp.33-40
    • /
    • 2004
  • 본 연구에서는 치수방재 효과를 향상시키기 위한 단일댐운영 모형을 개발하였으며, 제어기법은 퍼지제어 기법을 사용하였다. 본 모형은 저수지 수위와 유입량을 기준으로 제어규칙을 설정하였으며 방류량을 결정하는 제어기준에 따라 Fuzzy I, II, III의 세가지 모형을 개발하였다. Fuzzy I 모형은 6개의 제어규칙에 의해 홍수조절만을 고려한 것이고, Fuzzy II 모형은 I 모형의 치수효과를 가지면서도 홍수후의 저수위를 상승시켜 이수적인 효과도 얻기 위한 모형이며, Fuzzy III 모형은 적응제어모형으로 제어규칙을 9개로 세분화하여 치수효과와 이수효과를 동시에 거둘 수 있도록 한 모형이다.

확률강우량을 이용한 AMC 조건에 따른 비점원 오염량의 변화 (Variation of Non-Point Source Pollution according to AMC Condition Using Probable Rainfall)

  • 안승섭
    • 한국농공학회지
    • /
    • 제42권3호
    • /
    • pp.76-88
    • /
    • 2000
  • AGNPS model is applied in this study to analyze the changes of non-point source pollutant according to AMC condition using probable rainfall. Probable rainfall of H-dam area by Gumber's extreme value distribution is computed through frequency analysis for each return period. 35 coarse grids are subdivided into 134 find grids of finite differential network to analyze peak flow soil loss quantity and nutrients of study area and the modified CN estimation equation shows good result about rainfall events-peak flow relationship. And as the consequence of estimation of soil loss quantity for each rainfall event soil loss quantity shows 120%-170% of actual soil loss quantity Regression analysis for the observed and calculated values of flow T-P AMC has an important effect on nutrients concentration of outflow and it if found that the excessive fertilization under AMC III condition may cause eutrophication by nutrients because the range of increase of outflow concentration appears relatively high.

  • PDF

저수용량을 고려한 가뭄지수 산정과 가뭄관리에 관한 연구 (A Study on the Index of Drought and Drought Management Considering Reservoir Storage)

  • 조홍제;박한기;김수현
    • 상하수도학회지
    • /
    • 제12권4호
    • /
    • pp.97-105
    • /
    • 1998
  • The goal of the present research was to develop a mean to determine indices of drought warning and emergency necessary to manage drought and establish water supply contingency plan for the municipal and industrial water supply system in urban areas. To do this, we worked on the Sayun catchment which is the main water source of Ulsan and used measured hydrologic data (storage, inflow, supply, outflow) from 1980 to 1996. The indices of drought calculated by the method of Phillips drought index based only on monthly precipitation do not pertinently represent drought phenomena in case water supply is from dam or reservoir in an urban area. Therefor, we developed the drought index technique including inflow, storage, outflow and supply which are the chief factors of drought management. The result showed that the method of Phillips drought index considering the capacity of water supply was excellent when applied to practical drought phenomena.

  • PDF