• Title/Summary/Keyword: Daily Work Plan

Search Result 59, Processing Time 0.024 seconds

Improvement Plan of Daily Work Accomplishment Index based Process Management based on Lean Construction Principles

  • Yoo, Dong Uk;Hong, Eun Hwa;Choi, Byung Sun;Chae, Myung Jin;Chun, Jae Youl
    • Architectural research
    • /
    • v.20 no.4
    • /
    • pp.147-152
    • /
    • 2018
  • As construction projects become larger, process plans become more complex, and inadequate process management leads to waste of time and resources. Effective process management requires process management techniques that can identify problems inherent in the process, continuously improve, and reflect interdependent process characteristics. In the field, the day's details by work type and work status are to be entered in the work daily report. However, even when important information is written, it is not directly linked to the overall process management. This study aims to propose specific process management and decision-making plan based on actual worker by visualizing and quantifying the information described in the existing work daily report. It is expected efficient process management to increase reliability and productivity through process management, which can increase the utilization of work daily reports and facilitates organic communication among participants.

A Daily Production Planning Method for Improving the Production Linearity of Semiconductor Fabs (반도체 Fab의 생산선형성 향상을 위한 일간생산계획 방법론)

  • Jeong, Keun-Chae;Park, Moon-Won
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.3
    • /
    • pp.275-286
    • /
    • 2015
  • In this paper, we propose a practical method for setting up a daily production plan which can operate semiconductor fabrication factories more stably and linearly by determining work in process (WIP) targets and movement targets. We first adjust cycle times of the operations to satisfy the monthly production plan. Second, work in process (WIP) targets are determined to control the production progress of operations: earliness and tardiness. Third, movement targets are determined to reduce cumulated differences between WIP targets and actual WIPs. Finally, the determined movement targets are modified through a simulation model which considers capacities of the equipments and allocations of the WIPs in the fab. The proposed daily production planning method can be easily adapted to the memory semiconductor fabs because the method is very simple and has straightforward logics. Although the proposed method is simple and straightforward, the power of the method is very strong. Results from the shop floor in past few periods showed that the proposed methodology gives a good performance with respect to the productivity, workload balance, and machine utilization. We can expect that the proposed daily production planning method will be used as a useful tool for operating semiconductor fabrication factories more efficiently and effectively.

A Case Study for Development of the Block Arrangement on Fixed Area and Scheduling System (고정 정반에서의 블록 배치 및 일정계획 시스템 개발 사례연구)

  • Min Sang-Gyu;Lee Sang-Hyup;Kim Ji-On;Ha Seung-Jin;Choi Tae-Hoon
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2005.06a
    • /
    • pp.159-164
    • /
    • 2005
  • In this paper, we study some problems of the scheduling on the fixed area in a shipbuilding. The scheduling, constrainted a working area, is not easy to make a load balance and to operate a change of daily work plan. we proposed a block arrangement algorithm to make the load balance and developed a system used to operate the change of daily work plan.

  • PDF

A Study on the Survey of the Meal Management (식생활관리 실태에 관한 연구 -서울시내 주부를 중심으로-)

  • 유영상
    • Journal of the Korean Home Economics Association
    • /
    • v.18 no.1
    • /
    • pp.53-66
    • /
    • 1980
  • One of the most pressing problems of the day in our household economy is the scientific improvement of meal management, which has direct bearings on the efficiency of housewives, domestic economy, and health care for the whole family. The concern of this paper is to investigate the current meal management situation in which more than three hundred housewives in Seoul find themselves, and to propose a tentative plan for its improvement. The result of the investigation is summarized as follows : 1) The number of families with old-fashioned kitchens forms a percentage of 30.3 ; only 4.3 percent of them have waterworks and drainage system. 2) The number of families equipped with cooking machines and utensils constitutes 51.2 percent ; that of those without cooking machines reaches the high percentage of 92.8. 3) The expense for daily meals amounts to 37.9 percent of the whole domestic expenses. the number of those who prepare daily meals without any planning comprises 78 percent. It is from habit that 60.5 percent of them make no workable plan for their meals. 4) The frequency of housewives doing daily marketing is comparatively high. 5) The time spent in preparing and clearing the table is 280.4 minutes a day on the average. 6) In preparing daily meals the low income bracket tends to keep expense as low as possible, while the high income bracket is chiefly concerned with taste. 7) The frequency of home cooking is on the increase as the housewives grow older, especially in the large families with housemaids. 8) In most cases housewives do the cooking for themselves; the high income brackets have housemaids do the cooking. The number of husbands who help their wives do kitchen work a small percentage of 10-14. 9) The simplification of kitchen work presupposes the simplification of the daily cooking, the improvement of the structure and equipment of the kitchen, and a good help of the whole family.

  • PDF

CREATING TOTAL PROJECT MANAGEMENT SYSTEM ON APPLYING LEAN CONSTRUCTION

  • Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.41-49
    • /
    • 2007
  • GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF

Plan-Class Specific Reference Quality Assurance for Volumetric Modulated Arc Therapy

  • Rahman, Mohammad Mahfujur;Kim, Chan Hyeong;Kim, Seonghoon
    • Journal of Radiation Protection and Research
    • /
    • v.44 no.1
    • /
    • pp.32-42
    • /
    • 2019
  • Background: There have been much efforts to develop the proper and realistic machine Quality Assurance (QA) reflecting on real Volumetric Modulated Arc Therapy (VMAT) plan. In this work we propose and test a special VMAT plan of plan-class specific (pcsr) QA, as a machine QA so that it might be a good solution to supplement weak point of present machine QA to make it more realistic for VMAT treatment. Materials and Methods: We divided human body into 5 treatment sites: brain, head and neck, chest, abdomen, and pelvis. One plan for each treatment site was selected from real VMAT cases and contours were mapped into the computational human phantom where the same plan as real VMAT plan was created and called plan-class specific reference (pcsr) QA plan. We delivered this pcsr QA plan on a daily basis over the full research period and tracked how much MLC movement and dosimetric error occurred in regular delivery. Several real patients under treatments were also tracked to test the usefulness of pcsr QA through comparisons between them. We used dynalog file viewer (DFV) and Dynalog file to analyze position and speed of individual MLC leaf. The gamma pass rate from portal dosimetry for different gamma criteria was analyzed to evaluate analyze dosimetric accuracy. Results and Discussion: The maxRMS of MLC position error for all plans were all within the tolerance limit of < 0.35 cm and the positional variation of maxPEs for both pcsr and real plans were observed very stable over the research session. Daily variations of maxRMS of MLC speed error and gamma pass rate for real VMAT plans were observed very comparable to those in their pcsr plans in good acceptable fluctuation. Conclusion: We believe that the newly proposed pcsr QA would be useful and helpful to predict the mid-term quality of real VMAT treatment delivery.

Utilization of Work Song for Infant-Mother Interaction (영아-어머니의 상호작용을 위한 노동요의 활용 방안 탐색)

  • Kwon, Hye-Jin
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.6
    • /
    • pp.269-280
    • /
    • 2008
  • This study was intended to reconsider the work song in the modem children's life and to search its utilization plan. For it, folk songs were collected from internet website("Search for Korean Forlk song") and books, then the proper work songs suitable for the purpose of the study were selected. Selected work songs were reformed in order to utilize in a daily life including infant daily life and play in the home with mother. That is, the work song was presented to be utilized while changing a diaper, massaging, taking a rest, letting children take a nap, whispering in the children's ears, taking a bath, exercising after the bath, doing a body play, and facing each other.

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

A Case Study on the Development of Daily Living Behaviors of the Elderly with Dementia in Nursing Homes for the Elderly in Gyeongnam-Province (경남지역 노인요양시설 치매노인의 일상생활행위 전개에 대한 사례연구)

  • Yang, Kum-Suek
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.4
    • /
    • pp.49-58
    • /
    • 2022
  • The purpose of this study is to present the basic direction of a desirable space plan for the elderly with dementia by examining the characteristics of the development of daily living behavior of the elderly with dementia. As a research method, First, the literature survey identified the increase in the elderly population in gyeongnam-province and the basic status of 197 elderly care facilities installed and operated in gyeongnam-province, and second, the development of daily living behaviors of eight dementia elderly people in two facilities in the form of overlapping-shaped nursing homes. The results of the survey and analysis are as follows. First, on average, it was found that the elderly with dementia in nursing facilities spend 98.3% of their work hours in the bedroom and the residents' control room. Second, it was found that the elderly with dementia accounted for 57.2% of sleep and idleness, 21.3% of leisure and hobby, and 10.7% of basic behavior. Third, in the development of the daily living behaviors of the elderly with dementia, the time to develop daily living behaviors related to identity and sociality is prominent in the living zone, and the time to develop daily living behaviors related to identity, safety, and family atmosphere is prominent in the public zone.

Effects of the Need for Rehabilitation Services on the Daily Life Satisfaction of Returned-to-Work and Reemployed Injured Workers : Mediating Effects Self-Efficacy (원직장복귀 및 재취업 산재근로자의 재활서비스 욕구가 일상생활만족도에 미치는 영향 : 자기효능감의 매개효과)

  • Kim, Soung-Wan
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.7
    • /
    • pp.194-206
    • /
    • 2020
  • This study aims at creating a daily life satisfaction improvement plan by using motivation for seeking need for rehabilitation services and self-efficacy in individuals who returned-to-work and reemployed injured workers. The subjects of this study were 2,642 returnees and 3,742 reemployed individuals who participated in the first to fifth year survey of the first cohort of the Panel Survey of Workers' Compensation Insurance. The analysis checked the mediating effect through the multiple regression analysis and bootstrapping. The result indicated the need for rehabilitation services had negative impact on self-efficacy and daily life satisfaction whereas self-efficacy had a positive effect on daily life satisfaction and played a mediating role between the need for rehabilitation services and daily life satisfaction. Based on these results, a need for the advancement of social psychological rehabilitation program and establishing an integrative rehabilitation process were identified.