• 제목/요약/키워드: Customer Order Scheduling

검색결과 54건 처리시간 0.03초

입자 군집 최적화를 이용한 전지전력저장시스템의 충·방전 운전계획에 관한 연구 (Study on BESS Charging and Discharging Scheduling Using Particle Swarm Optimization)

  • 박향아;김슬기;김응상;유정원;김성신
    • 전기학회논문지
    • /
    • 제65권4호
    • /
    • pp.547-554
    • /
    • 2016
  • Analyze the customer daily load patterns, be used to determine the optimal charging and discharging schedule which can minimize the electrical charges through the battery energy storage system(BESS) installed in consumers is an object of this paper. BESS, which analyzes the load characteristics of customer and reduce the peak load, is essential for optimal charging and discharging scheduling to save electricity charges. This thesis proposes optimal charging and discharging scheduling method, using particle swarm optimization (PSO) and penalty function method, of BESS for reducing energy charge. Since PSO is a global optimization algorithm, best charging and discharging scheduling can be found effectively. In addition, penalty function method was combined with PSO in order to handle many constraint conditions. After analysing the load patterns of target BESS, PSO based on penalty function method was applied to get optimal charging and discharging schedule.

반도체 FAB 공정의 효율적인 통제를 위한 생산 기준점 산출 알고리듬 (A Milestone Generation Algorithm for Efficient Control of FAB Process in a Semiconductor Factory)

  • 백종관;백준걸;김성식
    • 대한산업공학회지
    • /
    • 제28권4호
    • /
    • pp.415-424
    • /
    • 2002
  • Semiconductor manufacturing has been emerged as a highly competitive but profitable business. Accordingly it becomes very important for semiconductor manufacturing companies to meet customer demands at the right time, in order to keep the leading edge in the world market. However, due-date oriented production is very difficult task because of the complex job flows with highly resource conflicts in fabrication shop called FAB. Due to its cyclic manufacturing feature of products, to be completed, a semiconductor product is processed repeatedly as many times as the number of the product manufacturing cycles in FAB, and FAB processes of individual manufacturing cycles are composed with similar but not identical unit processes. In this paper, we propose a production scheduling and control scheme that is designed specifically for semiconductor scheduling environment (FAB). The proposed scheme consists of three modules: simulation module, cycle due-date estimation module, and dispatching module. The fundamental idea of the scheduler is to introduce the due-date for each cycle of job, with which the complex job flows in FAB can be controlled through a simple scheduling rule such as the minimum slack rule, such that the customer due-dates are maximally satisfied. Through detailed simulation, the performance of a cycle due-date based scheduler has been verified.

고객 생애 가치를 활용한 단일 창구 일정계획 수립에 관한 연구 (A Study on Determining Single-Center Scheduling using LTV(LifeTime Value))

  • 양광모;박재현;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 춘계학술대회
    • /
    • pp.285-290
    • /
    • 2003
  • There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty Based on other objectives, many criteria may serve as s basis for developing job schedules. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.

  • PDF

PERFORMANCE ANALYSIS OF TWO FINITE BUFFERS QUEUEING SYSTEM WITH PRIORITY SCHEDULING DEPENDENT UPON QUEUE LENGTH

  • Choi Doo-Il
    • Journal of applied mathematics & informatics
    • /
    • 제22권1_2호
    • /
    • pp.523-533
    • /
    • 2006
  • We analyze two finite buffers queueing system with priority scheduling dependent upon queue length. Customers are classified into two types ( type-l and type-2 ) according to their characteristics. Here, the customers can be considered as traffics such as voice and data in telecommunication networks. In order to support customers with characteristics of burstiness and time-correlation between interarrival, the arrival of the type-2 customer is assumed to be an Markov- modulated Poisson process(MMPP). The service order of customers in each buffer is determined by the queue length of two buffers. Methods of embedded Markov chain and supplementary variable give us information for queue length of two buffers. Finally, performance measures such as loss and mean delay are derived.

고객 요구 집단에 의한 일정계획 수립에 관한 연구 (A Study on Scheduling by Customer Needs Group)

  • 양광모;박재현;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2002년도 추계학술대회
    • /
    • pp.233-238
    • /
    • 2002
  • The product process is sequence of all the required activities that a company must perform to develop, and manufacture a product. These activities include marketing, research, engineering design, quality assurance, manufacturing, and a whole chain of suppliers and vendors. The process also comprises all strategic planning, capital investments, management decisions, and tasks necessary to create a new product. manufacturing processes must be created so that the product can be produced in the product facility Purchasing new equipment and training workers may be required if new technology is to be used. Tools, fixtures, and the sequence of steps in the manufacturing processes must all be developed to allow rapid, high-quality, cost effective production. Also, it may be needed to be rearrange the production facility to adapt to the new manufacturing processes. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.

  • PDF

이종병렬기계로 구성된 변압기 권선공정의 생산일정계획 (A Heuristic Scheduling Algorithm for Transformer Winding Process with Non-identical Parallel Machines)

  • 박창권;장길상;이동현
    • 산업경영시스템학회지
    • /
    • 제26권2호
    • /
    • pp.35-41
    • /
    • 2003
  • This paper proposes a heuristic scheduling algorithm to satisfy the customer's due date in the production process under make to order environment. The goal is to achieve the machine scheduling in the transformer winding process, in which consists of parallel machines with different machine performances. The winding is important production process in the transformer manufacturing company. The efficiency of the winding machines is different according to the voltage capacity and the winding type. This paper introduces a heuristic approach in the transformer winding process where the objective function is to minimize the total tardiness of jobs over due dates. The numerical experiment is illustrated to evaluate the performance.

An Approach for Scheduling Problem in Port Container Terminals: Moving and Stacking

  • HA, Phuoc Lan;LE, Ba Toan;HUYNH, Tuong Nguyen;NGUYEN, An Khuong;NGUYEN, Van Minh Man
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제7권1호
    • /
    • pp.1-5
    • /
    • 2015
  • In this study, we consider the transportation problem in port container terminals. It aims to determine positions in yards to place the containers at the adequate times. The containers on ship must be unloaded one by one from top to bottom, and placed in the main yard in order to reduce additional cost required for unnecessary unloading when getting out by customer with given timetable. The cost for transportation at container terminals could be reduced by a new approach in scheduling: move the containers from ship and stack them onto main yard that minimizes cost of yard crane operation when unloading for customer.

국내 의류업계의 IT 인프라 구조에 관한 연구 (A Study on the IT Infrastructure of Korean Apparel Industry)

  • 최인려
    • 복식문화연구
    • /
    • 제17권3호
    • /
    • pp.512-522
    • /
    • 2009
  • The purpose of this study is to analyze IT infrastructure of Korean apparel industry in order to enhance business effectiveness and customer's satisfaction in information society with global networks. For this study, the questionnaires were distributed to 57 apparel industries in Korea. The data were analyzed by factor analysis, descriptive statistics, Cronbach's alpha coefficient, multi regression analysis. The results of this study are as follow: First, Considering the apparel industry, construction of information system is essential for assistance of information policy and utilization of information. Understanding of e-business policy affects profits of suppliers. Second, Apparel industry with higher information policy has higher productivity with flexibility. Third, Apparel industry which has close relationship with suppliers has better customer support. Flexible scheduling and production line are important factors for quick response of customer's order and need.

  • PDF

A Genetic Algorithm Based Task Scheduling for Cloud Computing with Fuzzy logic

  • Singh, Avtar;Dutta, Kamlesh
    • IEIE Transactions on Smart Processing and Computing
    • /
    • 제2권6호
    • /
    • pp.367-372
    • /
    • 2013
  • Cloud computing technology has been developing at an increasing expansion rate. Today most of firms are using this technology, making improving the quality of service one of the most important issues. To achieve this, the system must operate efficiently with less idle time and without deteriorating the customer satisfaction. This paper focuses on enhancing the efficiency of a conventional Genetic Algorithm (GA) for task scheduling in cloud computing using Fuzzy Logic (FL). This study collected a group of task schedules and assessed the quality of each task schedule with the user expectation. The work iterates the best scheduling order genetic operations to make the optimal task schedule. General GA takes considerable time to find the correct scheduling order when all the fitness function parameters are the same. GA is an intuitive approach for solving problems because it covers all possible aspects of the problem. When this approach is combined with fuzzy logic (FL), it behaves like a human brain as a problem solver from an existing database (Memory). The present scheme compares GA with and without FL. Using FL, the proposed system at a 100, 400 and 1000 sample size*5 gave 70%, 57% and 47% better improvement in the task time compared to GA.

  • PDF

SNS에 근거한 주문가능 판단 시스템 설계 및 구현 (A Design and Development of Order Feasibility Decision System Based on SNS)

  • 전태준;김희중
    • 경영과학
    • /
    • 제18권2호
    • /
    • pp.1-10
    • /
    • 2001
  • Due to environmental change in market, delivery satisfaction to customer end redaction of LeadTime are critical In the Make-to-Order manufacturing system. This paper focuses on Order Feasibility Decision System Based on SNS System. We suggest BOP (Bill of Process) in which aggregated information is used When the load p1anning problem is solved while more detailed information is used when the scheduling problem is solved.

  • PDF