건설 시뮬레이션과 베이시안 기법을 이용한 공정관리 데이터베이스 구축 (Database Development For Efficient Construction Process Management Using Construction Simulation Technique and Bayesian Approach)

  • 고용호;박민하;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.94-95
    • /
    • 2014
  • Construction industry has become higher, larger and more complicated. It has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly and some were made based on historical data. However, such plans have been investigated that require numerous revisions during construction which means that the plans made through such methods are not reliable. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to overcome such limitations. It has been analyzed that many studies have focused on suggesting prediction models only that cannot be used for both actual planning prior to construction and process monitoring during construction. Therefore, this study suggests a methodology that effectively manages construction productivity by applying simulation methodology combined with bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

커튼월 관련 자재에서 RFID 적용을 위한 인식 성능 테스트 (Reading Performance Test of RFID Technology for Curtain Wall Material)

  • 김용배;송제홍;윤수원;진상윤;권순욱;김예상
    • 한국건설관리학회논문집
    • /
    • 제9권1호
    • /
    • pp.176-186
    • /
    • 2008
  • 최근 RFID기술은 산업 전반에서 다양한 형태로 적용되고 있으며, 국내 건설 산업 분야에서도 현장 노무관리 및 레미콘, 철골, 커튼월 등의 물류관리를 위한 적용 기술 개발 및 연구가 활발히 수행되고 있다. 그러나 RFID 기술은 주변 환경 및 자재의 특성에 따라 인식성능의 차이를 보임에도 불구하고, RFID 기술 활용은 이론적인 인식 성능에 근거한 적용방안을 제시하고 있다. 본 연구는 이론적 인식거리, 무반사실 테스트, 현장 테스트를 통해 RFID 기술별 인식 성능 테스트를 하였으며, 일반적으로 현장에서의 인식거리는 감소하는 것으로 나타났다. 또한 커튼월의 주요 자재인 알루미늄과 유리를 대상으로 정확한 인식 성능 테스트를 실시 비교하였으며, 유리면이나 금속면에 일반 라벨 태그를 부착하였을 경우 유리 전용 태그나 금속 태그를 부착하였을 때에 비해서 인식이 불가능하거나 인식 거리 감소가 큰 것으로 나타났다. 따라서 본 연구에서는 위와 같은 테스트를 통해 커튼월에 RFID 기술 적용 시 인식 성능을 최적화하기 위한 고려 요소를 제시하고자 한다.

커튼월 공사의 성능·사양 연계 시방서 프로토타입 (Hybrid Prototype of Performance and Prescriptive Specifications in Curtain Wall Construction)

  • 이준호;조동현;구교진
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.433-442
    • /
    • 2014
  • 건축공사 시 적정 품질 확보를 위해 활용되고 있는 대부분의 국내 설계기준 및 시방서는 절차를 중요시 하며 재료 치수 등을 규정하는 사양 기반이다. 공사업체의 창의성 저해 및 이로 인한 경쟁력 약화 등 사양시방서의 다양한 문제점에 기인하여 최근 최종 결과물을 중요시 하는 성능 기반의 시방서가 제시되고 있지만 건축 분야 적용에 한계가 있다. 본 연구에서는 국내외 시방서 사례의 성능 및 사양항목 기반의 커튼월 공사 성능 사양 연계 시방서 프로토타입을 제시하였다. 설문조사를 통해 중요 성능점검 시점을 도출하였으며, 각 시점별 관련 참여주체 역할을 반영한 성능점검 프로세스와 샘플시방서를 제시하였다. 전문가면담기반 검증 결과 현장적용성이 높고 공사 진행단계에서의 성능 확보를 적극적으로 지원할 수 있는 효과적인 도구로 평가되었다.

베이시안 접근법을 이용한 생산성 관리 방안 제시 (Productivity management methodology development using Bayesian Approach)

  • 고용호;이태희;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.21-22
    • /
    • 2013
  • Construction industry has become higher, larger and more complicated. Construction projects demand precise planning and management prior and during actual operation. However, it has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly that usually results in unreliable results. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to suggest quantitative results. It has been analyzed that many studies have focused on limited data only and neglected suggesting an appropriate methodology for changing data applications. Therefore, this study suggests a methodology that effectively manages construction productivity by applying bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

병원 외주부 디자인에 따른 병실모듈 연구 (A Study on the Ward Module according to the External Design of the Hospital)

  • 이현진;박원배
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제27권3호
    • /
    • pp.71-78
    • /
    • 2021
  • Purpose: It is important to plan the ward module at a time when the size of beds, the floor area, and the construction budget are all set prior to the hospital design. In this context this study aims (1) to derive various factors affecting the ward module, and (2) to analyze the appropriate room module according to the type. Methods: Design factors related to hospital modules are derived through precedential studies, and the types of ward elevation are classified by reviewing the drawings of 18 case hospitals. And the detailed dimensions and area of the derived elements are analyzed. Results: The X-axis modules of the ward are switched to long span structural columns of 9.9 m, 12.6 m and 13.2 m, but the ward modules still represent 6.6 m. The Y-axis module of the ward shows a dimension of 9 to 9.9m in the process of changing a multi-person room into a four-person room. Type A of curtain wall with columns located on the wall of the room and type B of curtain wall located in the center of the room are analyzed due to their variations. The square window type, which forms the elevation of the square window by exposing the columns to the elevation, and the outframe type, which protrudes from the structural columns and beams, have elevation designs limited. There are, however, no obstacles to the interior space of the hospital room, so the wall composition and furniture arrangement are expected to be free. The ward area of Curtain Wall Type A, which can secure an effective area of 5.9m*5.0m, are 52.1m2. The Curtain Wall Type A, Square window type, and the outframe type are 49.8m2. Implications: As part of the hospital standard module plan for economical and reasonable hospital building planning, a type was proposed in this study in conjunction with the external design. It is hoped that it be a base for standard module research linked together to the Central Treatment department, Outpatient department and underground parking lot.

커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안 (The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall)

  • 정태식;김창덕
    • 한국건설관리학회논문집
    • /
    • 제6권4호
    • /
    • pp.71-79
    • /
    • 2005
  • 건설 프로젝트가 점차 대형화, 전문화, 복잡화되어감에 따라 건설공사에서의 리스크 요인과 불확실성 요인이 증가하고 있다. 따라서 이와 같은 건설 사업 과정에서 발생하는 불확실한 요인을 미리 파악하고, 이에 대처하는 것은 프로젝트 성공을 위해 매우 중요한 요소이다. 따라서 본 연구에서는 전체 공종 중 공기, 공사비, 민원발생 등으로 인해 공사에 크게 영향을 미치며, 후속공정에 미치는 영향이 큰 커튼월 공사를 시공 프로세스 검토를 통한 리스크 인자의 적출을 통해 구체적인 리스크 인자의 구체적인 대응방안을 제시하여 실무에 직접적으로 접근할수 있도록 하였다. 이러한 리스크 인자의 적출은 정량적인 리스크의 분석을 가능하게 하고, 이에 따라 각각의 공종에서 발생하는 리스크 인자들의 우선순위를 결정할 수 있으며 이를 바탕으로 제시한 공정 리스크 관리 도구를 통하여 현장마다 경험과 지식의 정도가 다른 실무자로 하여금 업무를 수행함에 있어서 사전에 리스크를 인지할 수 있으며 리스크가 발생했을 때 신속하게 대응할 수 있고 그러한 리스크를 최소화할 수 있는 업무 지침을 제공하는 역할을 하게 될 것이다.

SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 - (Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction)

  • 윤정환;김예상;진상윤;김창덕;최윤기;전재열;임형철
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.430-433
    • /
    • 2003
  • 최근의 건축공사는 고층화되어 가는 추세이며 원가절감과 공기단축, 생산성 향상 등이 요구되고 건설자동화의 도입을 통한 총생애자동화시스템의 도입이 시급히 요구되는 추세이다. 이에 따라 본 연구에서는 초고층 빌딩 건축에 주로 사용되는 커튼월 공법과 제조업에서의 SCM기법, 최신의 RFID기법을 이용하여 초고층 건축물 커튼월의 자동화 관리시스템을 구축을 위한 방안을 제시하였다. SCM기법이란 생산에서 판매에 이르는 전단계의 과정을 연결, 관리하는 것을 의미하고 커튼월은 빌딩 건축에서 골조공사의 공기단축과 단순화를 위해 가장 많이 활용되는 건식공법으로 건설공사에서 가장 제조업에 가까운 형태의 공사로 볼 수 있다. 또한 RFID는 SCM의 구현방법으로 자재의 흐름과 생산프로세스, 그리고 정보관리 시스템의 도구로 사용되며 이들을 활용한 총생애자동화시스템은 생산과정 뿐만 아니라 사후관리 과정에도 효율적이며 높은 생산성과 경제성 향상에 기여한 것으로 기대된다.

  • PDF

건설 생산의 Life Cycle을 고려한 효율성 측정방안 (An Approach on Life Cycle Based Efficiency Measurement in Construction Industry)

  • 정순오;윤수원;진상윤;김예상;박지훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.608-611
    • /
    • 2004
  • 건설 프로세스에서 효율성은 프로젝트의 성패를 좌우하는 중요한 요인 중의 하나이다. 하지만 기존의 생산성 향상 방안들은 1인당 매출과 같이 단순히 결과 위주의 지표를 중심으로 프로젝트를 관리함으로써 많은 변화 요인을 가지고 있는 건설 산업을 특성을 반영하는데 한계를 가지고 있으며, 특히 다수의 참여자에 의해 여러 단계로 진행되는 건설 프로젝트의 Life cycle 상에서 각 공종별 생산성 측정 및 관리, 그리고 생산성 저하의 원인을 도출하는데 한계를 가지고 있다. 따라서 본 연구는 결과 위주의 성과측정 방법인 생산성 개념을 보완하기 위해 프로젝트의 Life cycle의 각 단계별 정성적 평가를 포함하는 건설 효율성 개념을 제안하고 이를 측정하는 방법론을 제시하였으며, 초고층 빌딩의 커튼월 프로세스를 대상으로 제안한 모델을 적용하져다.

  • PDF

RFID 기반 물류 관리의 적용 효과 분석 - 커튼월 공사를 중심으로 - (Assessing the Impact of RFID based materials tracking - Focusing on Curtain-Wall Work -)

  • 윤수원;진상윤;김예상
    • 한국건설관리학회논문집
    • /
    • 제13권1호
    • /
    • pp.24-35
    • /
    • 2012
  • RFID 기반의 물류 관리는 건설 프로젝트의 효과적인 물류 관리를 위해 적용이 모색되는 기술로, 점차 다양한 분야로 기술 적용이 확대되고 있다. 하지만 기존의 연구들에서 지적하고 있는 바와 같이, RFID 기술이 가지는 잠재적 가능성에 비해 기술의 확산이 미흡한 상태에 있고, 이를 위한 적용 효과에 대한 검증이 관리자의 생산성 향상에 치우쳐져 있어, 보다 폭넓은 관점에서의 효과 검증이 필요한 상태에 있다. 따라서 본 연구에서는 RFID 기반의 물류관리 시스템의 보다 정확한 효과 검증을 위해, 실제 프로젝트의 커튼월 공사를 대상으로 시스템을 적용/운영하고, 현장 및 시스템 모니터링을 통해 적용효과 및 시사점을 제시하였다. 그리고 본 연구에서 제시한 RFID 기반 물류 관리 시스템의 적용효과는 기존 연구에서 제시하고 있는 관리자의 업무 시간 단축 및 생산성 향상과 관련된 효과뿐만 아니라, 물류 및 작업 생산성에 영향을 미치는 자원 평준화 측면에서의 효과를 포함하고 있으며, 기존 연구와는 달리 가장 유사한 환경을 가지는 쌍둥이 빌딩을 대상으로 RFID 적용 및 미적용 사례를 분석하여, 보다 정확한 비교 데이터를 제시하였다는데 의의를 가진다.

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.