• 제목/요약/키워드: Curtain Wall Process

검색결과 38건 처리시간 0.037초

ALC 패널을 활용한 건축물 외장 커튼월에 대한 Mock-up Test 성능 평가 연구 (Performance Evaluations of Mock-up Tests for ALC Panel Curtain Wall in Building Exterior)

  • 김영호;이용수
    • 한국디지털건축인테리어학회논문집
    • /
    • 제13권4호
    • /
    • pp.25-32
    • /
    • 2013
  • The green building is one of biggest factors to go the goal of energy saving and environmental conservation, reduction of energy consumption, friendly energy technology, recycling of resource, and environmental pollution reduction technology. The purpose of these green buildings realized by the energy-saving technology such as the exterior materials or curtain wall system. The curtain wall system is a element that come to insulated portions of building envelope that results in heat loss. The purpose of this paper is to carried out mock-up tests for exterior wall used in autoclaved lightweight concrete panels in green building practices. Mock-up test execute a mixed process between standard test procedure and complex test procedure based on AAMA 501(American Society for Testing and Materials) and ASTM 283, ASTM 330(American Society for Testing and Materials). In results, tests meet the requirements that grant values in steps of procedures provided on ASTM and AAMA. ALC panel is suitable for a exterior wall product to be gratified thermal cycling performance and structural capacity, deflection(H/200) and lateral displacement(H/50), for curtain walls.

커튼월 공사에서의 공급사슬관리 적용에 관한 연구 (A Study on the Application of Supply Chain Management in Curtain Wall Engineering)

  • 박상우;박상준;권원;김창덕;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.301-304
    • /
    • 2004
  • 국내 초고층 건축물의 커튼월 공사는 건축설계, 커튼월 설계, 제작, 조달, 시공, 유지관리 단계를 거치는 전체 Life cycle의 각 단계별로 설계업체, 커튼월 설계 및 제조업체, 시공업체, 유지보수 업체 등 많은 참여주체들이 관여하는 공종으로 각 주체 간의 업무 프로세스를 효과적으로 관리하기 위한 방안이 요구되고 있다. 이에 따라 커튼월 공급망 전체를 최적화하여 진행 각 단계별로 존재하는 불확실성과 낭비요소를 제거하고, 공급망의 효율을 향상시키고 경쟁력을 강화하는 SCM개념의 적용이 필수적이라 할 수 있다. 또한, SCM 기법을 적용할 때 기업간 통합에 있어서 정보시스템과 정보의 관리는 여러 주체들이 하나의 네트워크를 이루어 정보시스템을 통하여 각 주체들의 많은 정보들이 원활하게 전달되고 공유되어야 하기 때문에 매우 중요하며 참여주체의 정보공유 및 교류가 가능한 통합된 정보시스템의 구축이 필수적이다.

  • PDF

SUPPLY CHAIN MANAGEMENT SYSTEM FOR CURTAIN WALLS USING RFID TECHNOLOGY

  • Sangyoon Chin;Suwon Yoon;Yea-Sang Kim;Cheolho Choi;Do-Bum Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1022-1027
    • /
    • 2005
  • This research presents a collaborative supply chain management system for curtain walls using Radio Frequency IDentification (RFID) to track the product and information flow among participants in high-rise building construction projects. This resarch developed a process model and a strategy for effective utilization of RFID technology through the curtain wall life-cycle. Then an information management system was developed to support the supply chain management of curtain walls with incorporating RFID into curtain wall products flow throughout the life-cycle. The system has been tested for validation and verification in a real world project.

  • PDF

커튼월 공사에서의 단계별 컨설턴트 참여방안 연구 (A Study on Participation of Consultant in Curtain Wall Construction)

  • 윤형수;이동섭;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.618-621
    • /
    • 2003
  • 이 연구의 목적은 현장 상황에 적절한 컨설턴트의 참여방안을 제안하는 것이다. 주의 깊게 고려된 컨설턴트의 참여는 공사비용과 기간을 단축시키고 공사 품질을 향상 시킬 수 있다. 연구의 첫 번째 단계는 커튼월 공사과정에 대한 문헌조사이다. 연구의 두 번째 단계는 공사에 관련된 전문가(설계자, 시공자. 전문시공업체, 컨설턴트)들에 대한 면담을 통한 커튼월 공사의 문제점을 분석하는 것이다. 이 때 우리는 컨설턴트가 이떻게 커튼일 공사의 문제를 해결할 수 있는지, 컨설턴트의 참여방안은 무엇인지 연구한다. 참여방안은 세 가지 방안으로 구성된다. 첫 번째 방안은 설계${\cdot}$시공단계 참여이고 두 번째 방안은 설계단계 참여, 참여, 세 번째 방안은 시공 단계 참여이다. 이러한 참여방안에 대한 검증은 전문가들의 면담을 통해 이루어졌다.

  • PDF

초고층 커튼월 공정관리 최적화를 위한 건설성능 데이터 표준화 (Data Standardization of Construction Performance for Optimized Process Management in High-rise Curtain-wall Operations)

  • 이태희;고용호;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.283-284
    • /
    • 2012
  • High-rise building construction has been increasing for the recent years and the construction process has become more complicated. This suggests a need for precise planning based on reliable data to prevent cost overruns and delays. However, the process planning is implemented based mainly on the experience of engineers that can result in critical damage in cost and time. Accurate productivity estimation and unit cost analysis must be considered important matter to prevent such disaster. This study estimates productivity and unit cost of curtain wall operations in high-rise building construction by simulation techniques and statistical methodologies. This study suggests a decision making methodology for the site personnel that enables to compare various combinations of productivity and unit cost based on reliable data that has been collected in actual construction sites. It is expected that this study contributes to the following research of developing an optimized construction performance assembling model for the site personnel.

  • PDF

초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교 (Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction)

  • 이태희;고용호;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF

커튼월 유리의 열파손에 관한 실험적 연구 (An Experimental Study on Thermal Breakage in Curtain Wall Glazing)

  • 이재현;남중우;방중석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.236-237
    • /
    • 2013
  • In recent years, the use of glass applied to curtain wall as a building facade material has increased in our nation. However, the non-tempered curved double glass is very easy to broke because it is difficult to guarantee the quality in process of making it into double glazing. So, it is more vulnerable to thermal breakage than tempered double glass. In this paper, surface temperature difference on curved double glazing was compared to that of heat strengthened glass and flat glass by conducting thermal breakage experiments. As a result, flat single glass was broken at temperature difference of 100~140 degrees but curved double glazing was broken at that of 40~60 degrees. Therefore, it was concluded that curved double glazing is more vulnerable than flat double glazing to thermal breakage, and it should be considered the possibility of thermal breakage when curtain wall glazing is applied as a building facade material.

  • PDF

초고층 주거건물 외피시스템의 현황조사 및 분석 (Present State Investigation and Analysis of Cladding System in High rise Residential Buildings)

  • 석호태;곽현철;송승영
    • 한국주거학회논문집
    • /
    • 제15권5호
    • /
    • pp.43-50
    • /
    • 2004
  • As residential buildings becomes high rise buildings, the new cladding system was needed for structure system, and unpredictable problems were found in it. The aim of this study is to analysis the present state and find improvement of indoor environment in high rise residential building, which used curtain wall system. Then, suggest to create comfortable indoor environment for high rise residential buildings in the process of design.

건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안 (A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation)

  • 박동근;이경석;유병인;김영석;한승우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.256-261
    • /
    • 2008
  • 최근 사회 경제적 요구의 증가, 건설기술 및 공법의 발전, 고객의 다양화 등 건설 환경의 급격한 변화로 인해 고층건물이 과거에 비해 크게 증가하고 있으며, 고층화 및 고급화 경향에 따라 고층 오피스공사의 외부마감으로만 사용되던 커튼월공사가 고층 아파트 및 주상복합의 외부마감으로 확대 사용되고 있다. 전체 공사비의 $10{\sim}15%$를 차지하는 주요공정인 커튼월 공사는 최근 공기단축을 목적으로 골조공사가 시작한 일정시점 이후부터 커튼월 공사를 동시에 시작하는 방식인 적층공법이 많이 사용되고 있다. 하지만 커튼월 적층공법은 두 작업이 동시에 진행됨으로써 발생되는 작업간 간섭에 의해 커튼월 공사의 공기가 지연이 되는 문제점이 있는데, 노무자 투입에 관한 방법론과 전산화 시스템의 부재로 인해 효율적인 해결책이 제시되지 못하고 있는 실정이다. 이를 위한 방안으로 가상공간에서 실제공사를 수행하기 전 미리 문제점을 예측하고 분석할 수 있는 건설 시뮬레이션 기법이 있지만 아직 건축공사에는 그 적용이 전무한 실정으로 이 논문에서는 대표적인 건설 시뮬레이션 기법인 사이클론을 이용하여 커튼월 적층공법의 작업 프로세스 일반화 모델을 개발하여 노무 및 장비 자원의 투입량에 따른 작업 생산성을 예측하였다. 이 연구의 결과는 현장관리자의 노무 및 장비 투입을 위한 효과적인 의사결정 도구로 활용될 수 있으며, 공기지연 시 원인분석 도구로 활용될 수 있을 것으로 기대된다.

  • PDF

Multitasking Façade: How to Combine BIPV with Passive Solar Mitigation Strategies in a High-Rise Curtain Wall System

  • Betancur, Juan
    • 국제초고층학회논문집
    • /
    • 제6권4호
    • /
    • pp.307-313
    • /
    • 2017
  • This paper outlines the processes and strategies studied and selected by the team during the design stages of the project for the incorporation of BIPV into the tower's façade. The goal was to create a system that helps reduce internal heating and cooling loads while collecting energy through photovoltaic panels located throughout the building. The process used to develop this façade system can be broken down into three stages. 1. Concept: BIPV as design catalyst for a high-rise building. 2. Optimization: Balancing BIPV and Human comfort. 3. Integration: Incorporating BIPV into a custom curtain wall design. The FKI Project clearly illustrates the evolution building enclosures from simple wall systems to high performance integrated architectural and engineering design solutions. This design process and execution of this project represent the design philosophy of our firm.