Kyung-Eui Lee;Jinwoo Lee;Sang-Min Lee;Hong Yeul Lee
The Korean journal of internal medicine
/
제39권3호
/
pp.477-487
/
2024
Background/Aims: Risk factors for progression to critical illness in hospital-acquired coronavirus disease 2019 (COVID-19) remain unknown. Here, we assessed the incidence and risk factors for progression to critical illness and determined their effects on clinical outcomes in patients with hospital-acquired COVID-19. Methods: This retrospective cohort study analyzed patients admitted to the tertiary hospital between January 2020 and June 2022 with confirmed hospital-acquired COVID-19. The primary outcome was the progression to critical illness of hospital-acquired COVID-19. Patients were stratified into high-, intermediate-, or low-risk groups by the number of risk factors for progression to critical illness. Results: In total, 204 patients were included and 37 (18.1%) progressed to critical illness. In the multivariable logistic analysis, patients with preexisting respiratory disease (OR, 3.90; 95% CI, 1.04-15.18), preexisting cardiovascular disease (OR, 3.49; 95% CI, 1.11-11.27), immunocompromised status (OR, 3.18; 95% CI, 1.11-9.16), higher sequential organ failure assessment (SOFA) score (OR, 1.56; 95% CI, 1.28-1.96), and higher clinical frailty scale (OR, 2.49; 95% CI, 1.62-4.13) showed significantly increased risk of progression to critical illness. As the risk of the groups increased, patients were significantly more likely to progress to critical illness and had higher 28-day mortality. Conclusions: Among patients with hospital-acquired COVID-19, preexisting respiratory disease, preexisting cardiovascular disease, immunocompromised status, and higher clinical frailty scale and SOFA scores at baseline were risk factors for progression to critical illness. Patients with these risk factors must be prioritized and appropriately isolated or treated in a timely manner, especially in pandemic settings.
Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
Journal of Construction Engineering and Project Management
/
제7권4호
/
pp.1-12
/
2017
India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.
Hakami, Waled Gaber Mohammed;Yousif, Mohamed Ibrahim
Journal of Construction Engineering and Project Management
/
제4권1호
/
pp.1-7
/
2014
The Sudanese construction sector is characterized by many small and large projects and high labor intensity, and accounted for 3.2% of the Sudanese country's GDP. The basic problems facing the Sudanese construction projects are the factors that affect on construction project performance. The objectives include identifying the factors affecting the performance of Sudanese construction projects, and to determine the critical factors. The literature review has been done to gather the information about the causes and their factors that affect on the performance of construction projects from the previous researches. The research methodology was conducted to gather the data by questionnaire which was examined to be reliable and valid according to statistical tests. The (34) factors were identified as factors affect on construction projects and the (10) factors were the critical factors which may lead to poor performance of Sudanese construction projects. This study has some conclusions such as the instrument for measuring the critical factors on the performance is reliable and valid, so the project management stage performance is 64.2%.
The performance of Cellular Manufacturing (CM) systems has been rigorously investigated during the last two decades, but the extent of empirical research on CM is limited. A major objective of this study is to examine the relationship between critical success factors, employees' implementation attitudes and performance of CM systems. Two hypothesis were formulated &d Tested: (1) The impact of critical success factors on performance and to what extent does certain critical success factors correlate with performance\ulcorner (2) How does the relationship between critical success factors and performance differ by employees' implementation attitudes\ulcorner Results from the study provide partial support for relationship between critical success factors (infrastructure, organizational immersion, autonomous management) and performance. The results also show that differences in performance of organizations grouped by degree of employees' attitudes could be found.
Journal of Information Technology Applications and Management
/
제27권6호
/
pp.101-116
/
2020
This study attempts to derive critical success factors and prioritize activities for implementing the automation of software test. Software testing proceeds in five steps of test plan, test case design, test scripting & test environment setup, test execution & evaluation, and test closure. From the literature, twenty influence factors in the five steps were identified. Focus Group Interviews with ten experts in software testing selected fourteen factors on the basis of importance and feasibility. Some factors were further divided to clarify their meanings and the number of influence factors finally became twenty one. A survey on the influence factors was conducted with 75 IT professionals. An importance-feasibility analysis was applied to the survey responses and classified the influence factors into four groups of essential factors, critical factors, low priority factors, and minimal factors. Essential factors include objectives for test automation, strategies for test automation, test automation training, test automation education, setting up test automation environment, setting up test environment, test automation tool selection. Critical factors include management's continued support, management's continued interest, role of automation engineers, and skills of automation engineers. This result suggests that a lot of efforts should be put into SW test plan for the successful SW test automation and SW automation should proceed in consideration with the priorities and resource consumption.
Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.
The purpose of the current study is to identify the critical success factors of information systems in small-and-medium-sized firms in general, and also to investigate any differences of those critical success factors between two different industries: the electronic and textile industries. To accomplish this purpose, we collected and analyzed 115 and 108 questionnaires from the electronic and textile industries respectively. From the results of statistical analysis, critical success factors of small-and-medium-sized companies in general were obtained, and critical success factors from two industries were compared and the differences were able to be identified. The results of the analysis of the questionnaires are as follows: 1) The organizational characteristics of the electronic industry showed some differences from those of the textile industry; 2) Small-and-medium-sized companies in the electronic industry appeared to have some differences from companies in the textile industry in terms of critical success factors of information systems. Such factors as education and training, quality level of software, capability of users, business processes, standardization of data management, level of organization, user involvement, support of top management were significantly different between two industries.
This study was conducted to identify the differences in service quality between Incheon and Kimpo international airports and critical factors influencing satisfaction of their customers. According to the results of the study, all service quality factors of Incheon international airport except the service factor of geographical location were better than those of Kimpo international airport. However, all service quality factors of the two airports were evaluated inferior to those of American, western European and Japanese international airports. In addition the service quality factors such as response, safety, airport facility and geographical location were found as critical factors influencing satisfaction of the airport customers. The service quality factor of geographical location of Incheon international airport was measured much inferior comparing with other service quality factors. Thus, the results of this study suggest that the Korean government deliberate and benchmark the international airports of western Europe and the USA in determining the geographical location when planning new international airports.
Today, many organizations are reengineering themselves to develop new ways to thrive in a foreign and unforgiving business environment. However, it is reported that many companies involved in the project of business process reengineering are dissatisfied with their results. Therefore, we developed an exploratory framework based on three constructs such as critical success factors, organizational maturity level, and performance and applied these to help analyze current practice in business process reengineering. To proceed with our research, this paper was organized around two research questions in business process reengineering. We addressed: (1) To what extent does certain critical success factors correlate with performance? and (2) How does the relationships between critical success factors and performance differ by organizational maturity level? From the research results, we could find relationships between critical success factors(i.e., project management, change management, objective management) and performance, and could verify differences in performance of organizations grouped by organizational maturity level.
Many buying and selling companies have participated in B2B electronic commerce in order to boost sales and cut down purchase prices respectively. There are some studies on buying and selling companies performances of using B2B e-marketplaces which provide electronic B2B transaction services such as finding transaction partners, providing on-line transaction process like auctioneering, etc. This study investigates the critical failure factors against B2B e-marketplace in other words B2B market-maker or B2B intermediary. We proposed 4 hypotheses asserting that 4 critical failure factors make reverse effects on B2B intermediary performances. We adopt the Balanced Score Card (BSC) framework to evaluate B2B intermediary performance. Data were collected from 46 respondents of B2B intermediaries in Korea. Analyses showed that traditional off-line B2B practices like refunding to buyer or transactions without legal documents and low quality of product information and catalog are critical failure factors against B2B intermediary performance.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.