• Title/Summary/Keyword: Crest settlement

Search Result 36, Processing Time 0.019 seconds

Studies on Structural Degradation of Agricultural Reservoirs in Kyungki Province (경기도내 농업용 저수지의 제체 및 구조물의 노후도 조사 연구)

  • 장병욱;송창섭;박영곤;우철웅;원정윤
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.4
    • /
    • pp.90-97
    • /
    • 1997
  • Field inspections and laboratory tests for 31 agricultural reservoirs in Kyungki province were performed to provide basic data for maintenance and rehabilitation of agricultural reservoirs and to evaluate structural degradation of agricultural reservoirs Results of the study are as follows : 1) From survey's results of embankments, signs of settlement and lateral movement are appeared in 17 reservoirs. Crest settlement of 20~80cm, downstream settlement of 10~90cm, and 20~160cm lateral movement of embankments are detected from settlement and movement analysis of 17 reservoirs. Crest and downstream settlements and lateral movement are greatly occurred in 20 ~ 40 years after embankment construction. 2) About 39% of total reservoirs shows seepage problems occurred in the lower part of berm and retaining wall located between embankment and spillway. Probability of seepage problems is higher at retaining wall than others. 3) Concrete strength estimated by Schmidt hammer in structures of reservoirs is a range of 100~l50kgf/$cm^2$ and average deviation of concrete strength is about l0kgf/$cm^2$. Strength difference$({\delta}S)$ between compressive strength estimated by Schmidt hammer and uniaxial compressive strength of concrete core is about $\pm$100kgf/$cm^2$. This difference is due to absence or presence of reinforced bar in concrete core, variable length of concrete core and limitation of Schmidt hammer. 4) About 68% of total reservoirs shows leaching, 58% alkali-aggregate reaction and 71 % abrasion/frost. Leaching, alkali-aggregate reaction and abrasion/frost occurred in most reservoirs when passed 10 years after construction of structure parts.

  • PDF

Evaluation of Correlation between Earthquake Induced Settlement of Fill Dams and Ground Motion Parameters (지진 시 필댐의 침하량과 지반진동 변수 간의 상관관계 분석)

  • Baeg, Jongmin;Park, Duhee;Yoon, Jinam;Choi, Byoung-Han
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.4
    • /
    • pp.65-72
    • /
    • 2018
  • Seismically induced settlement exceeding dam freeboard may lead to a dam failure. The prediction of settlement is important also because it is also reported to be strongly related to longitudinal crack width and depth, which are critical indices used for safe evaluation of dams. The empirical correlation derived from numerical simulations is most often used. In this study, two-dimensional dynamic nonlinear analyses are performed using representative CFRD and ECRD fill dams. A total of 20 recorded motions are used to account for the influence on ground motion intensity and magnitude. The calculated crest settlements are correlated to four ground motion parameters, which are peak ground acceleration (PGA), peak ground velocity (PGV), Aria Intensity ($I_A$), and magnitude. It is demonstrated that using ground motion parameters in addition to PGA can significantly increase the prediction accuracy.

Settlement Behavior Prediction of CFRD After Impounding (CFRD의 담수 후 침하 거동 예측)

  • Kim, Yong Seong;Kim, Bum Joo;Shin, Dong Hoon;Park, Han Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3C
    • /
    • pp.209-218
    • /
    • 2006
  • In this study, stress and deformation of CFRD during its construction and impounding were analyzed and compared with its monitoring results. Moreover, deformation characteristics of CFRD after impounding were evaluated based on the settlement monitoring records of total 23 domestic and foreign CFRDs during construction and impounding. The investigation on the behavior of CFRD indicated that the influence of impounding on its stability was minimal although slight increases in vertical and horizontal stresses and strains were observed. Also, one method was proposed to predict a crest settlement from multi-layer settlements by applying the best fit method. It is expected that the results of this study would provide practical information for the design, construction, and management of CFRD.

Sensitivity Analysis of Rockfill Input Parameters Influencing Crest Displacement of CFRD Subjected to Earthquake Loading (지진하중을 받는 CFRD 정상부 변위에 영향을 미치는 사력재료 입력물성에 대한 민감도분석)

  • Ha, Ik-Soo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.11 no.1 s.53
    • /
    • pp.1-9
    • /
    • 2007
  • The purpose of this study is to carry out the quantitative sensitivity analysis on rockfill material influencing the dam crest displacement of CFRD(Concrete-Faced Rockfill Dam) subjected to earthquake loading. The total 105 dynamic numerical analyses (2 input earthquake, 2 magnitudes for each earthquake. 27 rockfill material property combinations obtained from large triaxial tests) on CFR type "D" dam in operation were conducted. The global sensitivity analysis was carried out using the results of numerical analysis. From the results of sensitivity analysis, It was found that the crest settlement of the CFR type dam subjected to earthquake was absolutely affected by the shear modulus of rockfill material irrespective of the input earthquakes and the maximum acceleration of each earthquake. Also, it was found that the horizontal displacement of the dam crest was highly affected by the shear modulus of rockfill material though the extent of effect on that was smaller than the settlement and the extent of effect depended on the input earthquakes and the maximum acceleration of each earthquake. On the contrary, it was found that the effect of friction angle was negligible.

Effects of a Degree of Discretization in the Direction of Longitudinal Dam Axis on the Results of 3-D Fill Dam Response Analysis (댐 축방향 분할도가 3차원 필댐 지진응답해석 결과에 미치는 영향)

  • Ha, Ik-Soo;Oh, Byung-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.72-83
    • /
    • 2009
  • The purpose of this study is to examine the effects of a degree of discretization in the direction of longitudinal dam axis on the results of three dimensional fill dam dynamic analysis. In this study, the three dimensional dynamic analyses of the existing 'H' dam which is modeled with a different degree of discretization were carried out. From these results, the fundamental frequency of the dam and the responses at the dam crest such as acceleration and settlement were compared and analyzed. It was concluded that the size of finite element discretized in the direction of the longitudinal axis mush be smaller than 1/8 of dam length in order to obtain the reasonable fundamental frequency and response of acceleration and mush be smaller than 1/10 in order to obtain the reasonable settlement behaviors from the three dimensional dynamic analysis of the fill dam.

  • PDF

Overtopping Model Experiments and 3-D Seepage Characteristics of the Embankment of Deteriorated Homogeneous Reservoirs (노후화된 균일형 저수지 제체의 월류모형실험과 3차원 침투특성)

  • Lee, Young Hak;Lee, Tae Ho;Lee, Dal Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.2
    • /
    • pp.13-23
    • /
    • 2019
  • In this study, an overtopping model experiments and three dimensional seepage characteristics at the deteriorated homogeneous reservoirs were performed to investigate the behavior of failure for embankment and spillway transitional zone due to overtopping. The failure pattern, pore water pressure, earth pressure and settlement by overtopping were compared and analyzed. The pattern of the failure by overtopping was gradually enlarged towards reservoirs crest from the spillway transition zone at initial stage. In the rapid stage and peak stage, the width and depth of failure gradually increased, and the pattern of the failure appeared irregular and several direction of the erosion. In the early stage, the pore water pressure at spillway transitional zone was more affected as its variation and failure width increased. In the peak stage, the pore water pressure was significantly increased in all locations due to the influence of seepage. The earth pressure increased gradually according to overtopping stage. The pore pressure by the numerical analysis was larger than the experimental value, and the analysis was more likely to increase steadily without any apparent variation. The horizontal and vertical displacements were the largest at the toe of slope and at the top of the dam crest, respectively. The results of this displacement distribution can be applied as a basis for determining the position of reinforcement at the downstream slope and the crest. The collapse in the overtopping stage began with erosion of the most vulnerable parts of the dam crest, and the embankment was completely collapsed as the overtopping stage increased.

The behaviour of a strip footing resting on geosynthetics-reinforced slopes

  • Hamed Yazdani;Mehdi Ashtiani
    • Geomechanics and Engineering
    • /
    • v.34 no.6
    • /
    • pp.623-636
    • /
    • 2023
  • This study utilized small-scale physical model tests to investigate the impact of different types of geosynthetics, including geocell, planar geotextile, and wraparound geotextile, on the behaviour of strip footings placed on 0.8 m thick soil fills and backfills with a slope angle of 70°. Bearing capacity and settlement of the footing and failure mechanisms are discussed and evaluated. The results revealed that the bearing capacity of footings situated on both unreinforced and reinforced slopes increased with a greater embedment depth of the footing. For settlement ratios below 4%, the geocell reinforcement exhibited significantly higher stiffness, carrying greater loads and experiencing less settlement compared to the planar and wraparound geotextile reinforcements. However, the performance of geocell reinforcement was influenced by the number and length of the geocell layers. Increasing the geocell back length ratio from 0.44 to 0.84 significantly improved the bearing capacity of the footing located at the crest of the reinforced slope. Adequate reinforcement length, particularly for geocell, enhanced the bearing pressure of the footing and increased the stiffness of the slope, resulting in reduced deflections. Increasing the length of reinforcement also led to improved performance of the footing located on wraparound geotextile reinforced slopes. In all reinforcement cases, reducing the vertical spacing between reinforcement layers from 100 mm to 75 mm allowed the slope to withstand much greater loads.

A Basic Study on Relative Liquefaction Failure Risk Assessment of Domestic Small to Medium-Sized Earthfill Dams (국내 중소규모 흙댐의 상대적 액상화 파괴위험도 평가 기초 연구)

  • Park, Tae Hoon;Ha, Ik-soo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.27 no.3
    • /
    • pp.147-155
    • /
    • 2023
  • This study aims to present a method to evaluate the relative risk of failure due to liquefaction of domestic small to medium-sized earthfill dams with a height of less than 15 m, which has little information on geotechnical properties. Based on the results of previous researches, a series of methods and procedures for estimating the probability of dam failure due to liquefaction, which calculates the probability of liquefaction occurrence of the dam body, the amount of settlement at the dam crest according to the estimation of the residual strength of the dam after liquefaction, the overtopping depth determined from the amount of settlement at the dam crest, and the probability of failure of the dam due to overtopping was explicitly presented. To this end, representative properties essential for estimating the probability of failure due to the liquefaction of small to medium-sized earthfill dams were presented. Since it is almost impossible to directly determine these representative properties for each of the target dams because it is almost impossible to obtain geotechnical property information, they were estimated and determined from the results of field and laboratory tests conducted on existing small to medium-sized earthfill dams in previous researches. The method and procedure presented in this study were applied to 12 earthfill dams on a trial basis, and the liquefaction failure probability was calculated. The analysis of the calculation results confirmed that the representative properties were reasonable and that the overall evaluation procedure and method were effective.

Seismic performance evaluation of agricultural reservoir embankment based on overtopping prevention structures installation

  • Bo Ra Yun;Jung Hyun Ryu;Ji Sang Han;Dal Won Lee
    • Korean Journal of Agricultural Science
    • /
    • v.50 no.3
    • /
    • pp.469-484
    • /
    • 2023
  • In this study, three types of structures-stepped gabion retaining walls, vertical gabion retaining walls, and parapets-were installed on the dam floor crest to prevent the overflow of deteriorative homogeneous reservoirs. The acceleration response, displacement behavior, and pore water pressure ratio behavior were compared and evaluated using shaking-table model tests. The experimental conditions were set to 0.154 g in consideration of the domestic standard and the seismic acceleration range according to the magnitude of the earthquake, and the input waveform was applied with Pohang, Gongen, and artificial earthquake waves. The acceleration response according to the design ground acceleration increased as the height of the embankment increased, and the observed value were larger in the range of 1.1 to 2.1 times the input acceleration for all structures. The horizontal and vertical displacements exhibited maximum values on the upstream slope, and the embankment was evaluated as stable and included within the allowable range for all waveforms. The settlement ratio considering the similarity law exhibited the least change in the case of the parapet structure. The amplification ratio was 1.1 to 1.5 times in all structures, with the largest observed in the dam crest. The maximum excess pore water pressure ratio was in the range of 0.010 - 0.021, and the liquefaction evaluation standard was within 1.0, which was considered very stable.

Evaluation of Seismic Fragility of Concrete Faced Rockfill Dam (콘크리트 표면차수벽형 석괴댐의 지진 취약도 평가)

  • Baeg, Jongmin;Park, Duhee;Yoon, Jinam;Choi, Byoung-Han
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.4
    • /
    • pp.103-108
    • /
    • 2018
  • The fragility curves for CFRD dams are derived in this study for probabilistic damage estimation as a function of a ground motion intensity. The dam crest settlement, which is a widely used damage index, is used for minor, moderate, and extensive damage states. The settlement is calculated from nonlinear dynamic numerical simulations. The accuracy of the numerical model is validated through comparison with a centrifuge test. The fragility curve is represented as a log normal distribution function and presented as a function of the peak ground acceleration. The fragility curves developed in this study can be utilized for real time assessment of the damage of dams.