• 제목/요약/키워드: Costs analysis

검색결과 3,543건 처리시간 0.032초

불확실성을 고려한 철도 교량의 LCC분석 시스템 개발 (Development of Uncertainty-Based Life-Cycle Cost System for Railroad Bridges)

  • 조중연;선종완;김이현;조효남
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1158-1164
    • /
    • 2007
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedentedly in civil engineering practice. Accordingly, it is expected that the life-cycle cost in the 21st century will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, so far, most researches in Koreahave only focused on roadway bridges, which are not applicable to railway bridges. Thus, this paper presents the formulation models and methods for uncertainty-based LCCA for railroad bridges consideringboth objective statistical data available in the agency database of railroad bridges management and subjective data obtained form interviews with experts of the railway agency, which are used to anew uncertainty-based expected maintenance/repair costs including lifetime indirect costs. For reliable assessment of the life-cycle maintenance/repair costs, statistical analysis considering maintenance history data and survey data including the subjective judgments of railway experts on maintenance/management of railroad bridges, are performed to categorize critical maintenance items and associated expected costs and uncertainty-based deterioration models are developed. Finally, the formulation for simulation-based LCC analysis of railway bridges with uncertainty-based deterioration models are applied to the design-decision problem, which is to select an optimal bridge type having minimum Life-Cycle cost among various railway bridges types such as steel plate girder bridge, and prestressed concrete girder bridge in the basic design phase.

  • PDF

사업장 내 간호사 활동의 경제성 분석: 간호사와 대기환경관리기사 비교를 통하여 (Economic Evaluation of a Workplace Occupational Health Nursing Service: Based on Comparison with Atmospheric Environment Managing Engineer)

  • 정혜선;이복임
    • 대한간호학회지
    • /
    • 제43권4호
    • /
    • pp.507-516
    • /
    • 2013
  • Purpose: The purpose of this study was to use cost-benefit analysis of activity to clarify the economic effect of prepared nurses versus atmospheric environment managing engineers as healthcare managers. Methods: For the study 111 workplaces were surveyed, workplaces in which nurses or atmospheric environment managing engineers were employed as healthcare managers. The survey content included annual gross salaries, participation in external job training, costs in joining association covered by the company, location and year of construction of the healthcare office, various kinds of healthcare expenditures, costs in operating healthcare office, health education, and activity performance in the work of environment management. Results: In the case of the healthcare manager being a nurse, benefit was larger than input costs at a ratio of 2.31. On the other hand, in the case of healthcare manager being an atmospheric environment managing engineer, input costs were larger than benefits (benefit-cost ratio 0.88). Conclusion: Results indicate that nurses are an effective healthcare human resource and can offer good quality healthcare service. Therefore companies should hire nurses and actively promote the economic efficiency of nurses in workplace.

기술수용모형과 전환비용의 관계 분석 (An Analysis of the Relationships between the Technology Acceptance Model and Switching Costs)

  • 이웅규;권정일
    • 한국경영과학회지
    • /
    • 제37권1호
    • /
    • pp.89-104
    • /
    • 2012
  • As the generalization of using computer and the internet, most people, who would decide the acceptance of new information technology (IT), may consider the current systems which have been used so far. The objective of this study was to analyze the relationships between technology acceptance model (TAM) and the switching costs which may incur during switching from the current system into another on. For this purpose, this study suggested the hypotheses, in which continuity cost and setup cost, two types of switching costs in IT adoption, would influence perceived usefulness and perceived ease of use respectively. Moreover, the moderation effects of system types, hedonic system and utilitarian system, on the relationships between switching costs and TAM, were also suggested as the hypotheses. In order to prove the validity of the hypotheses, two groups were surveyed. Before surveying, to the one group who were believed to be a user of 'Cyworld', a new blog service, Naver Blog, was introduced. Similarly, to another group, Google Docs was introduced. The analysis by Partial Least Square (PLS) approach showed that most hypotheses in this study were statistically supported.

LCC분석 기법을 활용한 신재생에너지 최적 설계 방안 연구 (A Study of renewable energy optimal design using the LCC analysis)

  • 송호열;김정욱
    • 에너지공학
    • /
    • 제24권2호
    • /
    • pp.45-50
    • /
    • 2015
  • 온실가스 배출량이 세계 6위인 우리나라는 건물의 운영과 유지 및 관리에 소비되는 에너지로 인한 온실가스 배출량을 줄이고자 공공건축물을 대상으로 신재생에너지 시스템을 통하여 에너지를 생산하도록 하는 공공의무화 제도(RPS)를 시행하고 있다. 이에 본 연구에서는 선행되었던 기존 연구의 동향을 분석하여 에너지원별로 적정 조합 및 적용 비율을 도출하였고, 동적 에너지 프로그램을 이용하여 에너지소비량을 시뮬레이션 하였으며, 산출된 결과를 토대로 초기투자비, 에너지비, 보수교체비, 유지관리비를 산출하였다. 분석결과 지열 100% 조합이 총 비용 2,105,974,344원으로 총 생애주기 비용이 가장 적은 것으로 나타났다.

발코니 확장비용 가이드라인에 따른 창호 열성능 분석 (Analysis of Window Thermal Performance according to Guidelines on the Balcony Expansion Costs)

  • 최경석;강재식;이승언
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.863-868
    • /
    • 2008
  • In accordance with the guidelines on the balcony structure changes in December 2005, most of tenants were moving into apartment housing, expand the balcony, but some large deviation between the price construction costs set of cases, due to overuse and the cause of the dispute, and the housing law amended in 2007 due to price cap system is implemented, the cost of expansion the balcony overdose pointed out that there is set to boost the sale price has been raised. These issues in order to improve the government in January 2008, the "Note costs by the balcony expansion" suggested guidelines to protect the rights of tenants and wants to promote the settlement of the sale price cap system. This study calculated the "Note costs by the balcony expansion" window system based on double or single, high performance insulation window system of the quantitative performance analysis of each type window that purpose.

  • PDF

The need for upgrading the seismic performance objectives

  • Kutanis, Mustafa;Boru, Elif Orak
    • Earthquakes and Structures
    • /
    • 제7권4호
    • /
    • pp.401-414
    • /
    • 2014
  • The economic consequences of large earthquakes require a revolutionary change in the seismic performance objective of residential and commercial buildings. The majority of total construction costs consist of non-structural and architectural costs. Therefore, the aim of this research is to upgrade current Life Safety performance objectives and to offset adverse effects on country's economy after an occurrence of large earthquakes. However, such a proposal cannot easily prove the feasibility of cost-benefit analysis in structural design. In this paper, six generic reinforced concrete frames and dual system structures designed based on Turkish Seismic Code were used in cost analysis. The study reveals that load bearing structural systems with Immediate Occupancy performance level in seismic zones can be achieved with negligible costs.

LCC Analysis to Determine an Appropriate Apartment Rent Rate for HVAC System Renovation Projects

  • 김대영;임형철
    • 한국산업정보학회논문지
    • /
    • 제20권5호
    • /
    • pp.107-115
    • /
    • 2015
  • Residential building owners are turning toward renovating their existing buildings to improve old and inefficient HVAC systems. Due to the renovation, much of the added costs will inevitably be passed on to tenants by increasing rent rates. This increment often increases the vacancy rate in the buildings. To balance the interests of both owners and tenants, this paper suggested a method to determine an appropriate rental rate increment for the HVAC system renovation. A case study on residential buildings was conducted to determine a balanced point where the rental rate increment that offsets the amount tenants are willing to pay for the renovation. To calculate all costs incurred by the renovation, life-cycle cost analysis was carried out. Therefore, this paper ultimately provides a threshold value of rental rate increment such that building owners can make a reasonable decision on the HVAC system renovation.

환경비용을 고려한 재생에너지의 경제성 분석 (An Economic Measures of the Renewable Energy considering Environmental Costs)

  • 이관호
    • 한국태양에너지학회 논문집
    • /
    • 제24권3호
    • /
    • pp.93-100
    • /
    • 2004
  • This study aims to presents the applicability of economic measures for renewable energy The basic principle and method of economic analyses were investigated and total life cycle cost considering environmental costs according to $CO_2$ generation. In case study, adaptation of new small wind power system to buildings were proved to produce a profit if it is considered the environmental cost and increment of energy prices. And so the economic measures can be used not only for the investment decisions for economic analysis but also for the comparative analysis of environmental cost and economic profits.

영구자석 동기발전기의 설계 및 시제품 특성 분석에 관한 연구 (A Study on Design and Performance Analysis of a Prototype Permanent Magnet Synchronous Generator)

  • 오진훈
    • 조명전기설비학회논문지
    • /
    • 제28권7호
    • /
    • pp.75-80
    • /
    • 2014
  • The small wind turbines has the merits of setting up with low costs by individuals, and get the energy saving effects that, it has the secured, separate markets from the big range systems, and the developing of it is continuously proceeding. The objective of this paper is to provide the design characteristics analysis of a permanent magnet synchronous generator(PMSG) skewed for magnet of rotor, the main advantage to be explored with the use of a split core design is the reduction in manufacturing costs and its simplicity in manufacture, compared to the manufacturing costs of a core skew PM machine. This thesis is aiming mainly analyzing the characteristics of the prototype to verify through Finite Element Method(FEM) and tests.

AUTOMATING SUPERVISORY MANPOWER ALLOCATION FOR CONSTRUCTION SITES

  • Jieh-Haur Chen;Li-Ren Yang;W. H. Chen;C. K. Chang
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.239-248
    • /
    • 2007
  • In the highly competitive construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of on-site supervisory manpower often offset the profit gained from the project and may jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of on-site supervisory manpower and estimate construction site costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects. In the modeling the costs and allocation of on-site supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects can be accurately predicted and the assignment of supervisory manpower feasibly automated.

  • PDF