• Title/Summary/Keyword: Cost-saving

Search Result 1,308, Processing Time 0.025 seconds

A Study on the Performance Evaluation of Form Using the Aluminum Alloy Frame Reinforced Panel (Aluminum 합금재 Frame을 이용한 벽체거푸집공법의 성능평가에 관한 연구)

  • 안재철;오상균;강병희
    • Journal of the Korea Institute of Building Construction
    • /
    • v.1 no.1
    • /
    • pp.135-142
    • /
    • 2001
  • This study is for the investigation of form using the aluminum-compound metal frame(Aluminum frame reinforced panel : AFR panel) which is improved in the capacity in the wall-concrete structure in steal of using the existing form which has problems such as, excessive exposure of cement, the loss of labor when it is constructed or disjointed, and it's economical efficiency compared with that of EURO Form. AFR panel passes the KS F 8006 test, and as a result of field test, it's displacement is satisfied with Specification. And using AFR panel is more economical than that of EURO Form because saving labor cost which plays a major part in cost saving in formwork is more effective in retrenching total cost than increment of material cost.

  • PDF

A study on the optimal design for heat insulation of hot water piping systems using a dynamic programming (동적계획법을 이용한 고온수배관의 최적보온설계에 관한 연구)

  • 유희한;하주식
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.39-52
    • /
    • 1987
  • Recently, the design problem of heat insulation have been reappraised in the aspect of energy saving due to the rising trend of energy cost. For example, that design problem is increasingly requsted in the fields of accommodation air conditioning systems, hot water supply systems, cargo handling systems, district heating or cooling systems. The rational design of heat insulation of piping systems can not only improve the overall efficiency of energy transfer but also give energy saving. In this paper, the heat insulation problem of district heating systems is therefore modeled as the multi-stage decision processes, suitable for dynamic programming technique. And take the object function as the sum of heat insulation material cost involved construction cost and heat loss cost, and propose the design method to minimize the object function for overall piping systems by dynamic programing. Effectiveness of design method presented here is proved by a computer simulation.

  • PDF

Valuation of Saved Water by Automated Agricultural Water Management System: Alternative Cost Approach (농업용수관리자동화시스템의 용수절감효과에 대한 경제적 가치 평가)

  • Jee, Yong-Keun;Kim, Sun-Joo;Kim, Phil-Shik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.4
    • /
    • pp.1-6
    • /
    • 2009
  • This study analyzed and evaluated the effect of agricultural water reduction by introducing automated agricultural water management using alternative cost approach. The approach is possible to evaluate none market property as an asset. The saved agricultural water was evaluated as none market property. As the alternative goods, Seongju and Donghwa dam, typical irrigation dams in domestic, were employed. The economic benefit from water saving effect of an automated agricultural water management was calculated as depreciation expense and maintaining cost of construction agricultural dam per saved agriculture water. As a result, the saved agriculture water was 8.5 million ton per year, and the economic benefit of it was $1.3{\sim}2.1$ million won.

A DECISION MAKING FRAMEWORK FOR REDUCING PROJECT DURATION BY APPLYING CONCURRENT ENGINEERING IN CONSTRUCTION

  • Han, Jin-Taek;Choi, Do-Seung;Lee, Jae-Seob
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1540-1547
    • /
    • 2009
  • Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.

  • PDF

Clinical and Economic Benefit Evaluation of Therapeutic Drug Monitoring Service on Vancomycin (반코마이신의 임상약동학 모니터링 서비스에 대한 임상적 및 경제적 손익의 평가)

  • Bae, S. M.;Ann, H. L.;Hong, K. J.;La, H. O.;Cho, H. K.
    • Korean Journal of Clinical Pharmacy
    • /
    • v.11 no.1
    • /
    • pp.1-6
    • /
    • 2001
  • This research is conducted to evaluate the clinical and economic benefits from therapeutic drug monitoring(TDM) service on vancomycin in a tertiary general hospital. Total 99 pairs of steady state peak and trough concentrations of vancomycin were obtained from 73 patients. To see the clinical benefits, the appropriateness of vancomycin dosing before TDM was evaluated. In 72 pairs of vancomycin blood concentrations obtained prior to TDM consultation, $47.2\%$ of the cases had reached within therapeutic range. Serum vancomycin levels in patients with $40{\leq}CLcr<60$ (ml/min) were higher and than the levels in patients with 40>CLcr and $60{\leq}CLcr$ (ml/min). Dose reduction rate in patients with creatinine clearance $40{\leq}CLcr<60$ (ml/min) were also significantly higher than those of compared groups ($61.5\%$, p=0.0138). Serum vancomycin concentrations were re-obtained from 21 patients who received modified dose through TDM service. Ninety percent (19/21cases) of them were within the target therapeutic range. For the evaluation of economic benefits from TDM consultation, estimated cost savings were calculated in those patients. The total drug saving were 586 vials in 21 patients. The calculated mean cost saving from the drugs was 314,570 won (range: $11,273\sim473,466)$ per patient. The study revealed that TDM service for vancomycin is necessary because empirical dosing is not effective for obtaining therapeutic drug level, especially patients with mild renal insufficiencies. The cost saving from TDM is also beneficial for the patients.

  • PDF

Assessment on Economies-Environmental Affect of Smart Operation System(SOS) in Sewage Treatment Plant (실증규모 하수처리장에 적용된 스마트 운영시스템의 경제-환경적 기여도 평가)

  • Kim, Younkwon;Seo, InSeok;Kim, Hongsuck;Kim, Jiyeon
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.6
    • /
    • pp.581-589
    • /
    • 2013
  • Generally, Sewage Treatment Plants(STPs) are complexes systems in which a range of physical, chemical and biological processes occur. However, their performance strongly depends on the know-how acquired by the field-engineer. Recently, in order to solve this situations, various operation and management technologies based on the Instrumentation, Control and Automation(ICA) have been developed. As a economies-environmental affect point of view, this study was for the performance evaluation and assessment of results from the Smart Operation System(SOS) in full-scale STP. The SOS in STP consisted of the process monitoring module, including real-time influent prediction and effluent simulation, and the Smart Air Control(SAC) module. According to the results from field test for 2 years, the results of economical evaluation, amount of benefits and cost saving by the SOS have shown to be much higher than that of traditional operation. Nevertheless, the removal load(kg/yr) of BOD 13.3 %, COD 28.2 %, TN 44.4 % and TP 20.8 % were increased, respectively. Remarkable improvement of removal load could be achieved after the SOS was adapted. It was concerned that the SOS offer a user friendly functionalities and cost saving needed by the field-engineers. In addition, it was expected that the results of this study would supply helpful information for design and cost saving for the SOS in full-scale STP.

Development of energy saving type life testing device for large machinery parts (에너지절감형 대형기계류부품용 수명시험장치의 개발)

  • Lee, Yong Bum;Shin, Suk Shin;Park, Jong Ho
    • Journal of Applied Reliability
    • /
    • v.13 no.1
    • /
    • pp.55-63
    • /
    • 2013
  • For a reliability assessment of large machinery parts, reliable data should be obtained from testing many samples for a long time. However, in case of testing these samples, testing cost is excessive; in case of life test for long time, power consumption is high; and in case of accelerated test by over load, very high cost is required to build the life testing device. Especially it is very frequent that the expensive device's life has ended during a accelerated test by over load. In this study, the design mechanism of the life testing device which excels in energy saving during the reliability test of large machinery parts has been introduced.

A Study on Economic benefits for Water Control Device Installed with a Flush Valve on a Toilet (세척밸브 급수제어장치 설치에 따른 경제적 효과 분석)

  • Park, Kang-Hyun;Kim, Su-Min
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.10
    • /
    • pp.656-661
    • /
    • 2011
  • The amount of water resources that can be used tend to be decreased gradually. In contrast, the rapidly increasing water consumption is a problem that need to be addressed. Renovation and equipment replacement to improve energy efficiency and to reduce expenditure for building usage is required. But the excessive initial investment cost and the prolonged of pay back period may be uneconomical choice. Water usage for cleaning the toilet bowl accounts for 27%of the total water usage. Water-saving valve that can select the amount of water for cleaning toilet bowl can be reduced expenditure. After installing water-saving valve, analysed the economic effects. Water-saving valves compared with flush valves, and researched the amount of water usage. Then analyzed for the economic effects. Water-saving valve was used 5.6 ${\ell}$/time for cleaning toilet bowl. In contrast, flush valve was consumed 8.4 ${\ell}$/time. Water-saving valve's water-saving rate was 33.3%. The initial payback period for Water-saving valve was 459.5 days. By a small investment in water saving valve, the economic benefits can be obtained.

An New Load Control Algorithms based on Power Consumption (전력사용량 기반의 새로운 부하제어 알고리즘)

  • Kim, Jeong-Uk
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1658-1662
    • /
    • 2010
  • This paper presents an advanced energy saving algorithm in building. It is important to aggregate a various demand side resource which is surely controllable at the peak power time to reduce the energy cost. Previous demand side algorithm appropriate for building is based on peak power. In this paper, we develop the new energy saving algorithm to reduce the quantity of power consumption. The simulation results show that the proposed tem is very effective.