• Title/Summary/Keyword: Cost-of-construction Program

Search Result 259, Processing Time 0.025 seconds

Development of Construction Benchmarking for Oversea Industrial Projects (해외플랜트 공사 벤치마킹 프로그램 개발)

  • Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1165-1171
    • /
    • 2013
  • The oversea construction contract amount has sharply increased since 2003. The contractor's capability for EPC and project management is a key factor for a successful industrial construction project. Construction performance measurement and evaluation is needed to improve contractor's project management capability. Therefore, this paper proposes the construction performance benchmarking program for oversea industrial projects. Performance metrics consists of project cost, schedule, quality, and safety. Data from 10 oversea industrial projects were collected and analyzed. Also, this paper describes the process for development of the benchmarking program and lessons learned from industry are summarized. Finally, this paper recommends how sustainable benchmarking program should be established and implemented.

A Comparative Analysis of Life Cycle Cost on the Window Glass and the Insulation Film Coated Glass for Window (창호 유리의 단열필름 시공에 따른 생애주기비용 비교 분석)

  • Jeong, Mingu;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.583-590
    • /
    • 2014
  • The purpose of this study is to analyze and compare the life cycle cost of window glass with insulation film and regular glass, to verify an economical window construction method. As an approach method, the thermal performance data of each type of glass was measured using Window 6.3 and ECO2-OD Simulation Program, applied it to the case building to calculate the air conditioning and heating maintenance costs and LCC, and compared the economic feasibility. As a result, installing an additional insulation film prevents the solar heat penetration in the summer, so it reduces the cooling cost, on the other hand, it increased heating cost in winter. From the life cycle cost perspective, the effect of cooling cost reduction does not counterbalance the increase in heating cost and the additional cost from film installation and repair; therefore, the installation of insulation film may not be a proper method.

Implementation and Analysis of Railway Design Model using ei-Rail with Joong-Ang and Seo-Hae Lines (ei-Rail을 활용한 노선설계 모형의 적용 및 중앙선/서해안선 사례분석)

  • Shin, Youngho;Kim, Jeong Hyun;Oh, Jitaek
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.407-415
    • /
    • 2015
  • The railway route and alignment planning have been executed with a limited number of alternatives based on the site pre-survey and the topographic map. This study developed an intelligent railway alignment planning program (ei-Rail) which can derive all the considerable design alternatives and provide the data for the alternative evaluation such as constructions cost, operation cost, and etc. According to the comparisons with prevailing planned railway projects, the time and cost for planning can be reduced as well as the construction costs. This program may contribute to the development of railway industry by reducing the time and cost for planning as well as the total project cost.

Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum - (계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 -)

  • Lee, Yoo-Seob;Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.155-163
    • /
    • 2007
  • Multiple parties-owners, engineering and construction contractors, and suppliers involve the delivery process of capital facility projects in the construction industry, and each party obtains or provides their workforce, material, equipment, or service tied into specific contracts. Considering that construction projects are based on the contracted relationship between the parties and that contract types are one of the significant factors determining project success. it is critical for project stakeholder to select appropriate contract types for successful deliveries of projects. With these considerations, this paper assesses impacts of different contract types on project cost, schedule, safety, change, or rework. Analyzing data from real construction projects, the differences in project performance between two contract types, Cost Reimbursable and Lump Sum are measured and statistically tested to investigate if the differences are significant. For this analysis, performance metrics developed by Benchmarking and Metrics program, the Construction Industry Institute are used.

Economic Analysis of Pleurotus Eryngii Cultivation Facilities (큰느타리버섯 재배사의 경제성 분석)

  • Suh, Won-Myung;Yoon, Yong-Cheol
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.6
    • /
    • pp.31-41
    • /
    • 2006
  • The analysis used in this work was cost-benefit analysis method. All future costs and returns of a given mushroom house were discounted to the time of initial investment (present) by means of 3.5% discount rate. Then the cost of ownership was compared to the return from the system. This analysis method has been developed and coded into a balance sheet for use on a EXCEL program. Using this programmed analysis,a large number of the case studies were examined using different combinations of economic conditions. These results will be very useful to individuals considering investment in a mushroom house, or any similar production system. By the way of the sensitivity analysis for each important parameter, the change of the marginal cost-benefit period could be finally determined. These parameters were typically construction cost of mushroom house, cost of cooling system, required cooling and heating energy amounts, unit price of mushroom media bottle, growing number of media bottles, production weight per unit bottle, sale price of mushroom, and annual number of growing period, etc.

A Study on The Estimation of Accident Loss Prevention Cost and Risk Analysis in Subway Construction (지하철 건설현장 재해 분석 및 재해손실비용 추정에 관한 연구)

  • 최명기
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.5
    • /
    • pp.77-81
    • /
    • 2001
  • The industrial accident in subway of late is increasingly coming to the front as a serious problem of society because a scale of industrial accident is a large size, and powerfulness, while the percent of accident is decreasing as a result of industrial facilities with the largeness of equipment, automation, and high horse-powering. In this paper, a study on the estimation of accident loss prevention cost and risk analysis in subway construction is proposed as an alternative to the techniques currently used in the general construction projects safety. Then the concept of risk evaluation using a risk assessment model is presented to drive value of risk and numerical example for risk analysis. A means for this does grasp the importance of educational factor by way of analyzing the causes of accident through statistical data of labor department, emphasizing the necessity and the importance of safety education, being helpful to act safety by decreasing insecure activity which ranks the majority of accident causes with putting the education program, form, method into practice that are suitable for a place of business.

  • PDF

A Study on the Optimum Selection of Railload Line using VE-LCC Analysis - Based on the Optimum Selection of Railway Bridge - (VE-LCC 분석을 통한 철도 노선의 최적안 선정방안 연구 - 교량 선정방안을 중심으로 -)

  • Shin Tae-Kyun;Lee Seung-Hoon;Kwon Jae-Seong;Koo Jeong-San;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.488-493
    • /
    • 2005
  • Railload line design of the railroad construction project should be planed considering the variety of quantitative and qualitative factors, and needs to be selected the optimum altinative weighing from VE/LCC analysis of the planned design. The purpose of this research is for showing selecting plan of the optimum railload line and railway bridge applying VE/LCC analysis in selecting the optimum altinative of railroad construction based on quantitative and qualitative factors, such as initial construction cost, maintenance cost, owner and user's requirements. In this research showed the application plan by each stage using data analysis, function analysis, and alternative evaluation of VE/LCC analysis with AHP and LCC analysis program for the selection. This research is proved the rationality and application of the course of selecting the optimum alternative through case application

  • PDF

A Sutdy on the Apllicability of the Energy Pile System on Substation (변전소 구조물의 에너지파일 시스템 적용성 연구)

  • Lee, Daesoo;Oh, Gidae;Lee, Kangyul
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.198-198
    • /
    • 2011
  • Cooling and Heating system using Geothermal energy in the country has shown rapid development in the research and business field during about 10 years. However, like other renewable energy sources, high initial construction cost is acting as an obstacle to apply widely. Therefore Energy pile system(Heat Exchanger inserted inside the structure pile) that can save about 25 % initial construction cost has been studied in European countries and recently being studied in our country. Therefore, KPECO(Korea Electric Power Corporation) is also studying energy pile system to improve cooling & heating system in substation that install about 200 pile. KPECO is aimed to make energy pile design, construction and maintenance standards because substation has good applicability. In this study, we studied to make new grout material and design program to make optimized design & counstruction method of energy pile system. And planing to peform field test for energy pile system in a 154 kV substation to obtain long-term behavior and efficiency of the system.

  • PDF

A Railway Network Design Problem Considering Passengers Route Choice (철도승객의 노선선택을 고려한 철도망 설계모형 연구)

  • Lim, Yong-Tae k;Jang, Jun-Seok;Park, Jin-Kyung;Lee, Jun
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.6
    • /
    • pp.581-587
    • /
    • 2008
  • This paper presents a railway network design problem (RNDP), which can be formulated as a bi-level program. In bi-level program upper level program is to minimize total travel cost including the construction cost of the railway facilities, whilst lower one describes the railway route choice behavior of passengers. We also propose a heuristic method for solving the program because it is a kind of NP-hard problem. From two numerical railway examples, we confirm that the RNDP and its algorithm produce a reasonable solution and that it is applicable to real world.

Development and Application of Integrated Settlement Management System for Construction and Maintenance of Concrete Railway (콘크리트 궤도의 시공 및 유지관리를 위한 침하관리 통합 시스템의 구축 및 활용)

  • Woo, Sang-Inn;Chun, Sung-Ho;Chung, Choong-Ki;Lee, Il-Hwa;Kwon, Oh-Jung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1196-1202
    • /
    • 2007
  • In construction of high speed railway, the fan shape is limited to achieve reduction of required travel time and concrete railway which has structural stability and induces small maintenance cost with allowable ground settlement is recently applied. So construction of concrete railway on soft ground in which considerable ground settlement occurs increases and settlement management in soft ground section is required. Field monitoring on ground movement and integrated geotechnical information system which manages construction, design, and field monitoring data are essential for settlement management of concrete railway subgrade. Site investigation data are also required due to future repair work. Therefore in this study, integrated geotechnical information system for construction and maintenance of concrete railway is developed. The developed system consists of a database and an application program. The database contains site investigation, construction, design, and field monitoring data throughout a railway. Application program performs various functions on managing and utilizing information in the database with graphic visualization of output. And by providing integrating information with comprehensible visual displays, the applicability and effectiveness of the developed system for construction and maintenance management were confirmed.

  • PDF