BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 - (BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city -)

  • 이해찬;김진만;최철호;송상훈
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

BIM기반 건축물 수선교체비 산정 프로세스 (BIM-based Repair&Replacement (R&R) Cost Estimating Process)

  • 박지은;유정호
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.31-38
    • /
    • 2016
  • 건설사업비 중 건축물의 유지관리비용이 차지하는 비중이 초기투자비만큼이나 상당하며 국내의 경우 건설공사의 생애주기비용(LCC)관점에서 설계VE검토 업무를 시행하고 있다. 건설산업의 정보화와 고도화 급속히 진행됨에 따라 BIM에 대한 관심이 고조되고 있다. 2012년부터 조달청은 500억원 이상인 공공공사에 BIM적용을 의무화를 시작으로 2016년부터 조달청이 발주하는 모든 공공공사에 BIM적용이 의무화된다. 건축설계의 패러다임이 2D방식에서 3D, 데이터관리 관점의 BIM으로의 전환이 정책적으로 이루어지고 있는 환경에서, LCC측면에서의 BIM활용에 대한 연구는 미흡한 실정이다. 특히, LCC분석 요소 중 하나인 수선교체비 산정을 위한 BIM 소프트웨어는 부재하며 상용화된 BIM저작도구에서 수선교체비 산정을 위한 정보의 전달이 부족하다. 따라서 본 연구에서는 데이터 표준 포맷인 IFC기반 수선교체비 산정을 위한 프로세스를 제안한다. 먼저, 현재 존재하는 수선교체 기준을 분석하고 BIM기반 수선교체비 산정 요구정보를 정의한다. 정의된 요구정보는 각 정보에 해당하는 IFC를 통해 추출되고, BIM기반 수선교체비 산정 요구정보 DB에 저장된다. 이는 외부 DB인 수선교체기준DB와 단가DB와 연계하여 수선교체비를 산정한다. 본 연구가 제시하는 프로세스를 통해 BIM환경에 대응하여 BIM모델을 활용한 수선교체비 산정의 효율화를 기대하며 수선교체비 뿐만 아니라 초기공사비, 에너지비용, 유지관리비용에 이르기까지 향후 LCC분석 요소에 확장하여 적용이 가능할 것이며 BIM기반 LCC분석의 표준화에 기여할 수 있다.

공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 (Apartment house project cost schedule for integrated management BIM-based BoQ application plan)

  • 정련의;김웅기;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제11권2호
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립 (BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures)

  • 주선우;김치경;김시욱;노준오
    • 한국전산구조공학회논문집
    • /
    • 제30권6호
    • /
    • pp.567-576
    • /
    • 2017
  • 본 연구는 BIM 도입 효과를 극대화할 수 있는 현장 적용성 확보에 중점을 둔 철근콘크리트 골조공사의 BIM 견적모델 작성과 BIM기반 견적 업무 프로세스를 표준화한 가이드라인을 제시하는 것을 목적으로 한다. 이를 위하여 기존 지침 및 가이드라인의 BIM 견적모델 작성 범위 및 방식을 고찰하고, 철근콘크리트공사 수량산출 견적 지침 및 기준을 분석하며, 기존 견적 방식과 BIM기반 견적 방식에 대해 비교분석한다. 이를 통하여 BIM기반 견적 업무의 표준 프로세스를 수립하고, 콘크리트/거푸집/철근 견적모델의 작성 및 수량산출 기준을 도출하며, 철근콘크리트공사 BIM기반 수량산출 및 견적 업무의 성과물 목록 및 양식을 제시한다. 본 연구를 통해 작성된 BIM 견적 가이드라인은 BIM기반의 새로운 기술환경에 대한 진입장벽을 낮추고, 견적의 정확성 극대화를 통한 원가절감을 실현하며, BIM 업무와 건설산업의 생산성과 부가가치를 증대시켜, 궁극적으로 건설사업 전 생애주기에서 생산되는 정보를 통합 관리할 수 있는 기반을 구축하고 BIM 생태계를 조성하는데 기여할 것으로 기대한다.

BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안 (Improvement of BoQ Documents for the BIM based Quantity Takeoff)

  • 안지원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

클라우드 컴퓨팅 기반 항만 BIM 서비스를 위한 브라우저 설계 (Design of Browser for The Harbor BIM Service Based on Cloud Computing)

  • 장재열;문현석
    • 한국BIM학회 논문집
    • /
    • 제8권4호
    • /
    • pp.60-71
    • /
    • 2018
  • The port BIM technology has many problems such as lack of relevant system, high cost of BIM infrastructure construction, and process difference of existing domestic inter-industry. Since the port facilities as national key industries are managed and operated by public organizations, it is necessary to integrate IT resources and have a system that needs collective construction and joint utilization management. In this paper, we proposed the convergence of cloud computing technology and BIM as a way to reduce the infrastructure cost required for port BIM operation and to provide various BIM services for domestic process. To do this, we collected system requirements based on demand surveys of port staff and designed a BIM browser that provides IFC-based BIM server and customized services to reduce infrastructure cost in cloud computing environment. In terms of infrastructure, we designed cloud-based IaaS to support cost reduction, which is an essential component, and designed SaaS to support customized services in terms of services. We will perform performance verification with focus on whether port BIM servers and browsers have reached a level where they can manage four BIM models with different types and capacities.

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권2호
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.