• Title/Summary/Keyword: Cost of repairs

Search Result 73, Processing Time 0.025 seconds

Study on Value Appraisal after the Repair of Cars (자동차의 수리후 가치평가방법에 대한 연구)

  • Yun, Daekwon;Lee, Haeteak;Nam, Ilwoo;Lee, Heongyu;Kim, Yonghyeon;Yun, Jaegon;Kim, Juyeong;Ha, Seongyong
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.3
    • /
    • pp.19-24
    • /
    • 2014
  • This study, the exchange value of the car after the repair, which affects the valuation elements and repair characteristics factors were investigated. Based on this specific accident damaged condition of the car, repair range, repair methods, repair costs, market transactions, taking into account the vehicle's depreciation appraisal method is proposed.

한반도 기후 변화에 따른 수해 및 빗물 저류터널(Flood Drainage Tunnel) 건설의 세계 동향 검토 연구

  • Choe, Jae-Hwa;Ji, Wang-Ryul
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.31-37
    • /
    • 2012
  • In the circumstances being continuous the unusual weather in the world, the city of Seoul has been devastating flood damage in July 2011, because of the heavy rainfalls. Along with expensive repairs to property, thousands of flood victims occurred; it is difficult to estimate the direct and indirect economic damages in city. Recently, as a part of the flood protecting measures, there are being discussed about the deep underground flood drainage tunnel, underground regulating reservoirs, permeable pavement, infiltration facility, river improvements, diversion channel, sewer pipe and ditch improvement and so on. Therefore, it is useful to make the plan of flood protecting measures more and more cost-effective and rational methods by considering the similar flood measures and constructions in the mega cities like Seoul.

  • PDF

Establishment of the maintenance system for rolling stock (철도차량 유지보수 체계 구축)

  • 이명호;이현종;권정원
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.408-413
    • /
    • 2002
  • From the moment that electricity is applied to a relay, a wheel turned, or a valve opened, the process leading to the need for maintenance begins, The uninitiated will tell you that the Maintenance man is someone who repairs something when it has gone wrong. Unfortunately, in any large engineering concern, such as a railway, it is not possible to work on the principle that only when something breaks down should it get any attention. The failure of one contact, diode or bearing could well stop not only the assembly of which it is a part, but the flow line or process, with loss of revenue, and clientele, and often with effects on the safety of both staff and the traveling public. So, we have to establish the reliable and cost-effective maintenance system to resolve these problems.

  • PDF

Maintenance Model for Multi-Component System Considering Failure Types (고장형태(故障形態)를 고려한 다부품장비(多部品裝備)의 보전모형(保全模型))

  • Jeong, Yeong-Bae
    • Journal of Korean Society for Quality Management
    • /
    • v.18 no.2
    • /
    • pp.33-42
    • /
    • 1990
  • This paper proposes the maintenance model of multi-component system when the failure characteristics and types of components are considered. In this model, it is assumed that a system is composed of a critical component, a major component and a minor component. Also, failure types is classified into major failure and minor failure. If major failure occurs to critical component before system age replacement time, the system is renewed. If major failure does not occur until its age replacement time, preventive maintenance is performed at age replacement time T. Minimal repairs are carried out after each minor failure. Major component is minimal-repaired if any failure is discovered during operation. Minor component should be replaced as soon as any failure is found. This paper determines the optimal replacement time of the system which minimizes total maintenance cost. Numerical example illustrates these results.

  • PDF

The Comparative Analysis of the Present and Expected Level on Meal-Price and Facilities Investment Cost Perceived by Foodservice Managers of Contract-Managed Highschools in Seoul (서울시내 고등학교 위탁급식의 급식비와 투자비의 실태 및 위탁업체의 기대수준 비교 분석)

  • Bae, Hwan-Mee;Kim, Hyun-Ah;Shin, Seo-Young;Jo, Mi-Na;Park, Su-Yeon;Cha, Jin-A;Yi, Bo-Sook;Yang, Il-Sun
    • Journal of the Korean Society of Food Culture
    • /
    • v.17 no.5
    • /
    • pp.578-583
    • /
    • 2002
  • The purposes of this study were to a) find out the operational characteristics of the contract-managed highschool foodservice in Seoul, b) investigate the expected level of meal-price and facilities investment cost perceived by contract-managed highschool foodservice managers c) compare the present level and expected level of meal-price and facilities investment cost. From October 12 to November 13 in 2001, the questionnaires were mailed to 249 high schools which was managed by contract foodservice company with respondent rate 40.2%. Data were analyzed using SPSS Win(10.0) for descriptive analysis and one group paired t-test. The results of this study were as follows ; 1. The student enrollment of highschools run by contract-managed foodservice was 1,243 with 72.6% participation rate of school lunch program. The average meal-price was 2,138 won. The average annual period of school foodservice operation was 156.78 days per year. The average contracting period was about 3 years. 2. The average cost concerned in the facilities investment amounts 169,578,180 won at the initial investment and 25,204,092 won at the repairs and maintenance cost in the course of operation. 3. The present level of meal-price and facilities investment cost were respectively 2,136won/meal and 171,157,336.72 won. And expected level of meal-price and amount of facilities investment cost were 2,418.75 won and 121,353,215.19 won. Comparing the present level with the expected level of the meal- price and facilities investment cost, expected level of meal-price was significantly higher than the present level of meal-price(p<.001) and expected level of facilities investment cost was significantly lower than present level of facilities investment cost(p<.001).

A Deep Learning Framework for Prediction of Apartment Repair and Maintenance Costs (아파트 수선유지 비용 예측을 위한 딥러닝 프레임워크 제안)

  • Kim, Ji-Myong;Son, Seunghyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.3
    • /
    • pp.355-362
    • /
    • 2024
  • The sustained upkeep of apartment buildings necessitates ongoing maintenance and timely repairs, particularly given their complex nature due to extensive areas, common facilities, and multiple residential and service structures. Additionally, the need for cost-effective maintenance is paramount for ensuring safety, preserving value, and maintaining economic efficiency. However, the multitude of external variables influencing apartment complex maintenance, coupled with the challenges in data collection, have resulted in limited research in this domain. To address this gap, the current study aims to develop a framework for predicting maintenance costs utilizing deep learning techniques, grounded in real-world apartment complex maintenance cost data. This study intends to provide a practical and valuable contribution to the field of apartment complex management, empowering stakeholders with enhanced predictive capabilities for optimizing maintenance strategies and resource allocation.

A Comparison Between Round Loop and Existing Octagonal Loop Detectors (원형검지기와 기존검지기의 비교 분석에 관한 연구)

  • 장덕명;김영남
    • Journal of Korean Society of Transportation
    • /
    • v.12 no.4
    • /
    • pp.35-52
    • /
    • 1994
  • In order to operate the computerized traffic signal system, it requires the detectors which ensure the exact detections of actual traffic data (e.g., traffic volume, occupancy and velocity of vehicles). The octagonal detectors are used currently in Korea. However, the maintenance of the detectors has many problems with the road repairs and the constructions on the pavement, and failure due to the disconnection of the wires. Serious delay due to the long installation time of loops also causes the traffic disturbances. The low sensitivities and splash-over effect can sometimes create error data after installation of the octagonal loops. The mai purpose of this study is to evaluate the feasibility of domestic use of the round (circular) inductive loops which developed recently in U.S.A. It was found that the round loops are comparable to the existing octagonal loops. In addition, the use of the high quality of materials in the round loop system can reduce the current problems and weakpoints of the octagonal loops. The installation cost of the round loop was found out as economic as the octagonal loop. The installation time of the round loop system can be reduced with the specially equipped loop truck, and wide/deep slots without sharp corners can extend the durability without serious stress of loop head wires. In conclusion, the round loop is superior to the octagonal type in overall points. It is recommended that the localization of the materials and equipments of round loop system is required to carry out the extensive local installations. Also, several contractors to meet the nationwide demand should be arranged to gurantee the proper maintenance and operation of the systems.

  • PDF

Analysis of Revenue-Sharing Contracts for Service Facilities

  • Yeh, Ruey Huei;Lin, Yi-Fang
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.4
    • /
    • pp.221-227
    • /
    • 2009
  • There are customer services jointly provided by two facilities so that each customer will complete the course made up of both facilities' sub-services. The two facilities are assumed invested respectively by an infrastructure owner and one subordinate facility owner, whose partnership is built on their capital investments. This paper presents a mathematical model of Stackelberg competition between the two facility owners to derive their optimal Nash equilibrium. In this study, each facility owner's profit is consisted of fixed revenue fractions of sold services, operating costs (including depreciation cost) and maintenance costs of her facility. The maintenance costs of one facility are incurred both by failures and deterioration due to usage. Moreover, for both facilities, failures are rectified immediately by minimal repairs and preventive maintenance is carried out at a fixed time epoch. Additional assumptions are also employed to develop the model such as customer arrivals are manipulated to follow a Poisson process, and each facility's lifetime is independently Weibull-distributed. The Stackelberg game proceeds as follows. At the first stage of decision making process, the infrastructure owner (acting as a leader) decides the allocation of revenue shares based on her self-interest. After observing the allocation of revenue shares, the subordinate facility owner determines her own optimal price of services. This paper investigates actions and reactions of the two partners in the system. Then analytical conditions are proposed to achieve a unique optimal Nash equilibrium. Finally, some suggestions for further research are discussed.

Development of non-destructive testing method to evaluate the bond quality of reinforced concrete beam

  • Saleem, Muhammad;Almakhayitah, Abdulmalik Mohammed
    • Structural Engineering and Mechanics
    • /
    • v.74 no.3
    • /
    • pp.313-323
    • /
    • 2020
  • Non-destructive tests are commonly used in construction industry to access the quality and strength of concrete. However, till date there is no non-destructive testing method that can be adopted to evaluate the bond condition of reinforced concrete beams. In this regard, the presented research work details the use of ultra-sonic pulse velocity test method to evaluate the bond condition of reinforced concrete beam. A detailed experimental research was conducted by testing four identical reinforced concrete beam samples. The samples were loaded in equal increments till failure and ultra-sonic pulse velocity readings were recorded along the length of the beam element. It was observed from experimentation that as the cracks developed in the sample, the ultra-sonic wave velocity reduced for the same path length. This reduction in wave velocity was used to identify the initiation, development and propagation of internal micro-cracks along the length of reinforcement. Using the developed experimental methodology, researchers were able to identify weak spots in bond along the length of the specimen. The proposed method can be adopted by engineers to access the quality of bond for steel reinforcement in beam members. This allows engineers to carryout localized repairs thereby resulting in reduction of time, cost and labor needed for strengthening. Furthermore, the methodology to apply the proposed technique in real-world along with various challenges associated with its application have also been highlighted.

A Study on the Investigation Technique for Deterioration State of Window·Door and Tile of Apartment Houses (공동주택 창호 및 타일의 열화상태 조사기법에 관한 연구)

  • Lee, Jung-Hun;Bae, Kee-Sun;Lee, Seong-Bok;Oh, Sang-Keun;Choi, Soo-Kyung;Seo, Chi-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.27-30
    • /
    • 2011
  • Analysis data of basics which are used for LCC(Life Cycle Cost) analysis of buildings and maintenance plan, are demanded to secure according as replacement cycle of repairs of apartment houses has come. However, investigation techniques and systems for investigating condition of deterioration of apartment houses, have not been made yet in Korea. For this reason, this study was wanted to make investigation techniques and systems, so the process for maintenance of apartment houses was researched and the required quality and deterioration factors of interior/exterior materials were investigated. As a result Check-List for investigating condition of deterioration, was made. if this is used during a nonscheduled, a routine, a regular and a urgency check, the methodical investigation will be achieved. Furthermore, if this is used for maintenance of apartment houses, it will be helped to select the repair cycle and the long-term repair plan.

  • PDF