• Title/Summary/Keyword: Cost of contracting-out

Search Result 18, Processing Time 0.019 seconds

A Study on Contracting-Out of Busan Port Pier Management Corporation (부산항부두관리공사의 민간화 방안에 관한 연구)

  • Kim, Sang-Goo;Gang, Yun-Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.15 no.3
    • /
    • pp.229-236
    • /
    • 2009
  • This paper intended to find rational alternatives for contracting-out of duties of the Busan port Pier Management Corporation, which is facing the merger and abolition, and of which main functions include the management of port facilities such as International Passenger Terminal, Cruise Terminal and Coast Passenger Terminal. This paper searched appropriate term, needs (merits), proper scope and cost of the contracting-out of that port facilities. The result of the analysis indicated that the best policy is to privatize the Busan port Pier Management Corporation itself to make it an private incorporated company.

  • PDF

The Investigation and Improvement plan of Contracting-out municipal wastewater treatment plant system in Korea (국내 하수처리장 관리대행 현황 및 제도 개선 방안)

  • Im, Jiyeol;Gil, Kyungik
    • Journal of Wetlands Research
    • /
    • v.19 no.2
    • /
    • pp.211-215
    • /
    • 2017
  • The market of the municipal wasetewater treatment plant (MWTP) operation is expanding across the world including Korea. The contracting-out system was introduced for the effective operation of MWTPs. However, an improvement of the contracting-out system of MWTP has been continuously required. This research investigated current operational status of MWTPs in Korea, to suggest the improvement of the cost effective MWTP operation to promote the contracting-out system of MWTP operation. Results showed that lower operational costs of MWTP were lower in larger MWTPs than in smaller MWTPs. Overall, MWTPs operated by a public enterprise showed lower operational costs than those operated by government agencies and private enterprises. Among the MWTPs similar in their treatment capacity, treatment process and operation period, MWTPs operated by private enterprises showed the lowest operational cost. According to the survey, managers and operators of MWTPs emphasized the importance of improvement on the methods of selecting operating agencies and estimating operationing costs. The results of this study should be useful as important supporting data to promote the contracting-out system for the MWTP operation.

A Study on Reorganization Plan of Busanport Pier Management Corporation (부산항부두관리공사의 개편방안에 대한 연구)

  • Kim, Sang-Goo;Gang, Yun-Ho
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2009.06a
    • /
    • pp.95-103
    • /
    • 2009
  • This paper intended to find rational alternatives for contracting-out of duties of the Busan port Pier Management Corporation. tint is facing the merger and abolition, and whose main functions include the management of port facilities such as International Passenger Terminal, Cruise Terminal, and Coast Passenger Terminal. For this purpose. the paper searched appropriate term, needs (merits), proper scope and cost if the contracting-out of that port facilities. The result of the analysis indicated that the best policy is to privatize the Busan port Pier Management Corporation itself to make it an private incorporated company.

  • PDF

Analysis and Solution of Contracting out of Public Libraries in Korea (공공도서관 위탁경영의 분석과 해법)

  • Yoon, Hee-Yoon
    • Journal of Korean Library and Information Science Society
    • /
    • v.39 no.3
    • /
    • pp.3-26
    • /
    • 2008
  • In most countries the public library run as a public institution and a symbolic icon for a democratic society. Therefore public library's publicity is absolutely essential value and profit should not be made on their maintenance. More recently, as the government's budget spending increase, however, many local governments contract out to manage an entire library or new library system. Three main reasons could be identified. Firstly, alternative solutions for maintenance were supposed to save money. Secondly, contracting out provides an opportunity to improve the quality of service delivery. Thirdly, central government and some local authorities had very strong ideological reasons for contracting out of the public libraries. However, nothing proved that alternative maintenance had caused lower cost and better services in Korea. In this paper, the reasoning of a move from the traditional form of public library governance is discussed, as well as the advantages and disadvantages contracting out of the public libraries, and suggested various practical solutions in Korea.

  • PDF

Introducing Contract-out in the Policing Service : Focusing on Policing segregated System (치안서비스의 민간위탁 도입에 관한 연구 : 치안분업모델을 중심으로)

  • Choe, Jung-Taek
    • Korean Security Journal
    • /
    • no.12
    • /
    • pp.309-333
    • /
    • 2006
  • These days, the majority of public service area presents increment of utilizing a contracting-out with the following reasons such as cost-efficiency, maintenance of population changes in flexible manner, and convenience of management. The social changes have influence on policing structure and regional security system as well as problems associated with accepting the contracting-out in the public policing sector. However, many issues such as limited contracting-out sector, difficulty of encouragement of participation to private sector, and limitation of making a contract with contracting-out would be brought up when initiate contracting-out to the public policing sector. Changing security system to lower budget, planning restructure of organization, developing alterable partial contracting-out, establishing private and public cooperate system and rationalizing contract system are the suggestions to solve and modify the raising problems. This study suggests a differentiate regulation of policing services compare to currently existing contracting-out method to consider a distinctive working environment. The suggestions are as follows: 1. develop a security segregate model, 2. build a cooperative system between private and public policing sector, 3. broaden opportunity of participation of private policing sector, 4. open-competition among qualified private tender to make a contract. The private contracting-out in the public security service sector should be manage in different manner compare to other private contracting-out in government-oriented public service sector. Since work performance of each private contracting-out agency is strongly bond to safety of every civilian in the nation, it is essential to increase its standard of qualification of each agency.

  • PDF

Analysis of Domestic and Overseas Environment to Introduce Performance Warranty Contracting for Pavements into Korea (도로포장 성능보증계약제도 도입을 위한 국내외 적용환경 분석)

  • Kim, Tea-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.216-221
    • /
    • 2008
  • This study has been carried out in order to observe the status of performance warranty contracting system currently being implemented at the advanced countries including Europe, U.S.A., and Japan, review the introduction feasibility and possibility. For this purposes this study has surveyed the concept and necessity of performance warranty contracting system as well as the status of domestic performance warranty contracting system. Especially the application environment for the performance warranty contracting system of Europe, U.S.A., Japan and Korea in terms of maintenance guarantee liability system, performance warranty regulations for design-build contracting system, selection method of successful bidder, performance warranty means, project contracting system including maintenance cost, and specifications and contract conditions for performance warranty system have been comparatively evaluated. And introduction methods of performance warranty contracting system were suggested.

  • PDF

A Study on Selecting Contractor in Local Government's Contracting out of Public Libraries (공공도서관의 수탁자 평가요소에 관한 연구)

  • Kim, Sun-Ae
    • Journal of Korean Library and Information Science Society
    • /
    • v.43 no.2
    • /
    • pp.77-98
    • /
    • 2012
  • Contracting out became popular in the public library sector since the early of 2000s. It is expected to lower cost of service provision, improve the quality of service provision, better timeliness of service through the discipline of the market and open competition. In practice the expectation was questionable. The numerous failures indicate either poor contract specification or unsuitability of the chosen contractor. The study analyzed 3 case studies of local governments where the entire entity of the public libraries service were decided contracting out and developed 5 criteria and 18 specific evaluation items as alternative evaluation structure. This evaluation model is expected to help to choose a suitable contractor in pubic library management.

A Study on the Status of Contract Managed Hospital Food Services (병원급식 위탁관리의 운영 실태조사)

  • Kim, Jin-Su;Yang, Il-Seon;Kim, Hyeon-A;Park, Mun-Gyeong;Park, Su-Yeon
    • Journal of the Korean Dietetic Association
    • /
    • v.9 no.2
    • /
    • pp.128-137
    • /
    • 2003
  • The purposes of this study were to investigate the current status of contracted hospital food services and to find out the difference in accordance with the number of beds in hospitals. Thirty six hospitals having more than 100beds in Seoul, Inchon and Kyungkido were the subjects of this study. Data was collected through surveys. The survey was conducted during March and April in 2002. The Questionnaires were mailed to the 36 directors of dietetic departments of the hospitals and 36 managers of contracting patient food services. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis and t-test. The results of the study are summerized as follows; Ⅰ. Hospital perspective : The range covered by contract food service was 63.3% and 36.7% in hospital food services, and medical nutrition services. The patient and employee food services were in 83.3%, and patient food services were in 6.7%. The methods selecting contractors are general, limited, selected and competitive biddings, and private contracts. The responsibility for supervision of contract food services was the dietetic department (51.7%) in most cases. Hospitals having personnel responsible for contracting affairs were in 75.9% of the cases and 24.1% did not have personnel. The biggest reason for contracting was facilitation of personnel management. The most important criteria on selecting food services contractors was the professionality of the contractor. Ⅱ. Contractor's perspective : The cost per meal in the year 2001 was composed of 1,905 won for food cost, 1,081 won for labor cost, 222 won for expenses, 114 won for VAT, 14 won for rent and 146 won for miscellaneous or controllable expense, representing 109 won loss per meal. The profit-and-loss contract cost is higher than the fee-contract cost. The ratios of food cost, labor cost and expenses are higher and the ratios of miscellaneous or controllable expense, VAT, rent and profit are lower in hospitals with more than 400 beds compared with those less than 400 beds. However, no significant differences are present between these two groups of hospitals. The actual contract period was 2.2 years upon initial contract and 1.2 years upon renewal. The initial investment cost was 53 million won and the cost of renovation and repair was 8.5 million won. Significant differences were present between two groups of hospitals. The conditions of employment and number of personnel hired by contractors for contract patient food services were significantly different according to the number of beds.

  • PDF

INCENTIVE/DISINCENTIVE PROJECT SUCCESS FACTORS DURING MACARTHUR MAZE I-580 BRIDGE SPAN REPLACEMENT

  • Jae-Ho Pyeon;Marc Zomoradi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.328-331
    • /
    • 2013
  • Incentive/Disincentive (I/D) contracting experiences in many states have been evaluated in terms of time and cost performance and substantial project time savings were found in many project cases. However, there is little understanding on individual project success factors for I/D projects during construction. This paper explores the significance of I/D clause in the success of the MacArthur Maze reconstruction project and summarizes a list of group causes that explains and elaborates on the detailed factors. The methods used for carrying out this study started with a search of online media and news reports and contract documents were also obtained from Caltrans. After review of the preliminary information, Interviews were performed with the Caltrans Resident Engineer and the contractor's project manager who were in charge of the MacArthur Maze reconstruction. In conclusion, the evaluation of their responses hinted at six significant cause groups responsible for the project's success. These groups can be listed as: 1) Motivation, 2) Policy, 3) Teamwork, 4) Communication, 5) Expectation, and 6) Resource Management.

  • PDF

A Case Study on Activity-Based Costing for a hospital (전통적 원가계산과 활동기준 원가계산의 비교연구)

  • Jung, Yong-Mo;Yang, Dong-Hyun;Lee, Yong-Chul;Leem, Bock-Hee
    • Korea Journal of Hospital Management
    • /
    • v.10 no.1
    • /
    • pp.25-47
    • /
    • 2005
  • This study was purposed to find out the difference of the accounting of practical cost between the ABC system and the traditional costing system applied in a hospital, to verified general effect of ABC. Methods: This case study deals with the method of calculation, the cost information that is produced at K hospital in Busan. To examine ABC system and traditional costing system, applying them to the clinical pathology, radiology, physics in K hospital. Results: As a result of costing analysis, it is showed maximum difference of 50% between ABC and traditional cost. compared in revenue center, it occurs the difference of 15% of them. considering the result, it is confirmed that ABC could be used as a means to offer more precise information. therefore, ABC makes possible to produce precise costing information and grasp the driver of cost, and it is possible to reduce cost effectively. Conclusion: ABC provide six benefits: (1) more accurate of service delivered (2) inproved pricing and contracting strategies (3) improved management decision making capability (4) greater ease of determining relevant costs (5) reduced nonvalue added costs.

  • PDF