• Title/Summary/Keyword: Cost of Poor Quality

Search Result 153, Processing Time 0.026 seconds

A Sustainability Assessment of the Rainwater Harvesting System for Drinking Water Supply: A Case Study of Cukhe Village, Hanoi, Vietnam

  • Nguyen, Duc Canh;Dao, Anh Dung;Kim, Tschung-Il;Han, Mooyoung
    • Environmental Engineering Research
    • /
    • v.18 no.2
    • /
    • pp.109-114
    • /
    • 2013
  • In Cukhe, a village located in the outskirts of Hanoi, Vietnam, people suffer from a shortage of high-quality water due to an arsenic contaminated supply water resource. We installed catchments, filters and settled tanks in the existing rainwater harvesting facility to improve water quality, and ten portable rainwater tanks to provide good-quality drinking water to the poor households and kindergartens in the dry season. The triple bottom line considerations, as well as the environmental, economic, and social impacts of the rainwater harvesting (RWH) systems are examined. RWH is a sustainable method to obtain good-quality drinking water at low cost and with little energy expenditure. Education of the system also encourages that continuation of the system and expansion can lead into economic prosperity, as the safe drinking water can be sold to the community. Hence, RWH is a unique proposal as sustainable drinking supply water for improving the lives and health of residents in Cukhe and other sites where water supply sources are contaminated.

A study on the color controlled of painter's work (페인트 도장공사의 색관리에 관한 연구)

  • Shim, Myung-Sup;Lee, Hyun-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.107-114
    • /
    • 2003
  • This study aims to find methods that prevents aging of buildings paint coating and that limits defects in construction. Defects in painting can occur in four stages: pure paint, during painting, after the paint coating has dried, and after some period of time has passed after coating. Paint may become bad due to precipitation of pigments, formation of membranes, and seeding during manufacturing. Therefore, it is important that the paint is well mixed and kept airtight at a cool, dark place. Indents, paint brush strokes, orange peel, separation of colors, and paint running and spreading during the paint work process can be prevented by using high quality materials and applying a high-level of construction method. After the paint coating has dried, boiling, yellowing, poor drying, poor bonding, and/or glen deficiency may occur. These are influenced by the levels of cleanness of the dried product, drying temperature and hydration. Then, when the coating has been left dried for some period of time, cracking, peeling, scaling, swelling, discoloring, and/or rusting may develop due to the ultraviolet and contaminants in the air. Since these defects occur due to inappropriate construction schedule and/or hot and humid condition, one must use weatherproof materials. Furthermore, poor paint color may be caused by contamination in the sample plate, discoloration, and/or discrepancies in colors which are due to material differences, level of glossiness, degree of dispersion, dual color property of metallic colors, precipitation of pigments, etc. One should achieve reduction in construction cost and effectiveness in paint work by limiting contaminations in the construction site and strictly observing to construction regulations.

Using the Dorsal Metacarpal Artery Perforator Flap for Reconstruction of Rheumatoid Ulcers

  • Choi, Min;Son, Kyung Min;Choi, Woo Young;Cheon, Ji Seon;Yang, Jeong Yeol
    • Archives of Reconstructive Microsurgery
    • /
    • v.24 no.2
    • /
    • pp.79-81
    • /
    • 2015
  • Rheumatoid arthritis is a long lasting autoimmune disorder that primarily affects joints, and patients with rheumatoid arthritis are predisposed to development of chronic skin ulcers. In addition, skin ulcers with rheumatoid arthritis tend to persist despite treatment because of sustained inflammation and poor healing capacity. Treatment of skin ulcers involves medications, wound coating agents, and surgical procedures including skin grafting, however, wound dressing or skin grafts are generally excluded because of excessive cost and time and poor intake rate. The dorsal metacarpal artery perforator (DMAP) flap, a vascular island flap for coverage of soft tissue defects on the fingers, provides promising results including matched quality and color. We experienced a case of DMAP flap for reconstruction of a rheumatoid ulcer, and a DMAP flap may be considered as a good faithful option for treatment of patients with rheumatoid ulcer.

Identifying Wastes in Construction Process and Implementing the Last Planner System in India

  • Bhatla, Ankit;Pradhan, Bulu;Choi, Jin Ouk
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.1
    • /
    • pp.11-19
    • /
    • 2016
  • Most of the Indian contractors are not well equipped to handle the growing demand of infrastructure development; hence construction projects frequently run in to time and cost overruns, disputes and quality issues. This study aims to improve the construction industry in India by implementing lean principles to eliminate non-value adding activities (wastes). The purpose of this study is to 1) identify the wastes and their sources affecting the construction process, and 2) to identify problems and document lessons by applying a Last Planner System (LPS) to a sample project. First, the researchers identified that Delays, Rework, and Interruptions were the most critical wastes affecting the construction process and Poor management control, Poor Planning and Shortage of Resources were the major sources of the above mentioned wastes. Second, the researchers report the Percent of Planned Complete (PPC) analysis results and experienced problems after implementation of LPS at the sample project. It was observed that much more improvement could have been achieved if there was consensus between the owners and the contractor on the implementation of the LPS in its entirety. Some of the problems experienced in the implementation of the LPS like lack of scheduling, resource and material shortage were found to be similar to those in developed countries.

A Study on Technology Transfer of Bokto Seeding Method for Crop Production - Based on Theory of Asian and Pacific Center for Transfer of Technology(APCTT) - (복토직파재배기술의 수용과 기술 확산에 관한 연구 - 아시아태평양기술이전센터(APCTT) 이론을 중심으로 -)

  • Ahn, D.H.;Park, K.H.;Kang, Y.K.
    • Journal of Practical Agriculture & Fisheries Research
    • /
    • v.10 no.1
    • /
    • pp.29-41
    • /
    • 2008
  • This research was conducted to develop a technology transfer and farmer's extension of newly released technology of Bokto seeding method for crop and vegetable production based on the theory of Asian and Pacific Center for Transfer of Technology(APCTT). This technology has recently transferred to not only Korea but also other countries like North Korea, China, Japan, Taiwan, Russia and Africa(Cameroon, Sudan and South Africa) since 2005. It has known as a highly reduction of production cost in terms of labors, chemical fertilizer and pesticides as well as environmental friendly due to a deep and side banded placement of chemical fertilizer at basal application. In addition this technology was proven to a precision farming on sowing depth and mechanism of chemical application method and also highly resistant against disasters like typhoon, flooding, low temperature, drought and lodging due to silicate application. It has improved a constraints such as a poor seedling establishment, weed occurrence, lodging, low yield and poor grain and eating quality in the previous direct seeding methods but still have a problem in occurrence of weedy rice and ununiformed operation of wet or flooded soil condition. Also this technology has a limit in marketing and A/S system. Based on a theory of APCTT evaluation and analysis this technology may be more concentrated on establishment of a special cooperation team among researcher and scientists, extension workers, industry sections and governmental sectors in order to rapidly transfer this technology to farmer's field. Also there will be needed to operate a web site for this newly released technology to inform and exchange an idea, experiences and newly improved information. A feed back system might be operated in this technology as well to improve a technology under way on users' operation. Also user's manual will be internationally released and provided for farmer's instruction and training at field site.

A Study on Developing Free Size Patient Clothing (Free size 환자복 개발을 위한 실험적 연구)

  • Hwang, Hyo Young;Song, Jung A;Song, Jung Hup
    • Quality Improvement in Health Care
    • /
    • v.5 no.1
    • /
    • pp.92-104
    • /
    • 1998
  • Background : Hospitals in Korea are in trouble at ecomomic matters because of low cost of medical insurance, and consumers' demand for high quality. The management of inpatient clothing is very difficult. Especially the management of patient's clothing size is very difficult because the case mix of patients in wards is very different from the stocked clothing size. Because of the economic matters, the ward does not prepare enough size of clothing. The nurses in ward are in trouble with managing the clothing. So the nurses want free size patient clothing for ease management of clothing size. Method : The experimental inpatinets clothing is designed for in 170cm height refer to Korean standard. The fit of 8 subjects from 150 cm to 185 cm wearing experimental were evaluated by clothing specialists, nurses and patients. Result : 75.8% of evaluators like free size clothing. This results show that the fit of subjects from 160cm to 180cm was good in general but subjects with 150cm, 155cm, 185cm height showed poor fit.

  • PDF

An Economic-Statistical Design of Moving Average Control Charts

  • Yu, Fong-Jung;Chin, Hsiang;Huang, Hsiao Wei
    • International Journal of Quality Innovation
    • /
    • v.7 no.3
    • /
    • pp.107-115
    • /
    • 2006
  • Control charts are important tools of statistical quality control. In 1956, Duncan first proposed the economic design of $\bar{x}-control$ charts to control normal process means and insure that the economic design control chart actually has a lower cost, compared with a Shewhart control chart. An moving average (MA) control chart is more effective than a Shewhart control chart in detecting small process shifts and is considered by some to be simpler to implement than the CUSUM. An economic design of MA control chart has also been proposed in 2005. The weaknesses to only the economic design are poor statistics because it dose not consider type I or type II errors and average time to signal when selecting design parameters for control chart. This paper provides a construction of an economic-statistical model to determine the optimal parameters of an MA control chart to improve economic design. A numerical example is employed to demonstrate the model's working and its sensitivity analysis is also provided.

A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

  • Oshungade, Oluwaseun O.;Kruger, Deon
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.13-25
    • /
    • 2017
  • Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants - clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor's experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.

A Study on the Issues and Improvement of the Existing Environmental Impact Assessment System - Evaluation in an operator Viewpoint - (현행 환경영향평가 제도의 문제점과 개선방안 - 실무자적 관점에서 검토 -)

  • Lee, Seung-Won;Kim, Jung-gun;Seo, Jung-Kuk
    • Journal of Environmental Science International
    • /
    • v.27 no.5
    • /
    • pp.281-289
    • /
    • 2018
  • The Korean environmental impact assessment(EIA) system, and explored ways to improve it as a more efficient and viable institution relevant to the demand of our time and conditions in study. The first problem this study identified is found in the fact that the party to write up the assessment report is itself the business operator or the one who is planning to work out the business plan. This structure translates into placing an order with an agent for EIA report. The reporting job may br subcontracted to the agent at a cost far below the rate specified in the 'Standard for Estimate of Agency Fee for Environmental Impact Assessment.' This practice also causes the vicious circle of producing a report that is written to justify the project or business in question or it leads to rough-and ready and poor documentation to minimize the time required. Second, in order to achieve the goal of the plan or business, which is the target of EIA, the local residents tend to ve regarded as an obstacle. This means elimination of the local people from participating in the EIA or their opinion being frequently ignored. This is the seed of distrust and hostility that sometimes provoke disagreements or fierce conflicts. The first proposal to improve these problem is to improve the factors that cause poor documentation of the assessment report as well as improve the understanding of the EIA system. This study proposes the following measures for improvement. The agency cost for EIA should be paid by the business operator or a third party that can ensure faithful implementation of the payment. A system should be established to verify transparent estimation of the agency cost. In order to enhance the professional quality of EIA agents, there should be implementation of qualification test for industrial engineer of related engineers in addition to the current EIA Qualification Test. The second proposal for improvement is to improve the citizen participation process by instituting a legal framework to make clear the purpose of the briefing session for local residents, which is held as a procedure of EIA, and to ensure more positive publicity during the stage of listening to the opinion of the local community. For a smooth and rational communication process, a moderator and a communicator of opinion, as is the case in a public hearing, could be instituted to clearly get the purpose of the briefing session across to the residents and to help to carry out the explanation and Q & A sessions according to the categories of the opinion of the residents. At present, the notification of the public inspection of the draft of the assessment report and briefing session for the residents is made on the newspaper and internet network. But some people have difficulty with access to this method of announcement. A higher participation rate could be secured if a legal provision is added to specify putting up placards in specific places such as the entrance to the place for the briefing session for residents or the building of administrative agencies of the area concerned.

Development of Direct Seeded Rice Cultivation in the Future (벼 직파재배(直播栽培)의 기술적(技術的) 발전(發展) 방향(方向))

  • Park, Seok-Hong;Lee, Chul-Won
    • Korean Journal of Weed Science
    • /
    • v.12 no.3
    • /
    • pp.292-308
    • /
    • 1992
  • Recently agricultural situations are being placed in unfavourable socio-economic environment as followed by rapid decrease of rural population, poor labor quality and high wages of rural society due to high speedy industrialization of social structure in Korea. In addition to those circumstances, under the UR system to be expected in the early future, free trade of agricultural products will be faced inevitably in Korea. Practically prices of rice as a principle food in this country are expensive about three times compared to those of foreign rice markets, and so how to increase the international competitiveness and food supplies are important problems to be solved rapidly. Accordingly an urgent goal is reduction of agricultural production cost by the improvement of labour productivity as a labour saving and cost down cultivation methods as the direct seeding cultivation in rice. But there are many problems in the direct seeded rice cultivation. The important things to be improved in that cultivation are development of rice varieties with lodging tolerance, effective seedling stand, weed control, irrigation management and fertilizing and so on. Moreover agricultural basis as irrigation facilities, land consolidation and farm machineries must be improved for the stability of rice cultivation in the future.

  • PDF