References
- A. Laskar, C.V.R. Murty, "Challenges before Construction Industry in India", Proceedings of the 7th National Conference on Construction, New Delhi, India, 2004.
- K. Ramaswamy, S.N. Kalidindi, "Waste in Indian Building Construction Projects" 17th Annual Conference of the International Group for Lean Construction. Taipei, Taiwan, 15-17 Jul 2009.
- World Bank, "India: Indian Road Construction Industry Capacity Issues, Constraints & Recommendations", 2008.
- H.D. Khanh, S.Y. Kim, "Barriers of Last Planner System: A Survey in Vietnam Construction Industry", KICEM Journal of Construction Engineering and Project Management, vol. 3, no. 4, pp. 5-11, 2013. https://doi.org/10.6106/JCEPM.2013.3.4.005
- H.D. Khanh, S.Y. Kim, "Practitioners" Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects", KICEM Journal of Construction Engineering and Project Management, vol. 4, no. 3, pp. 1-12, 2014.
- A.A. Banawi, M. Bilec, "Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia", KICEM Journal of Construction Engineering and Project Management, vol. 4, no. 2, pp. 12-22, 2014. https://doi.org/10.6106/JCEPM.2014.4.2.012
- A. AlSehaimi, L. Koskela, and P. Tzortzopoulos, "The need for alternative research approaches in construction management: the case of delay studies", Journal of Management in Engineering, Vol. 29 No. 4, pp. 407-413, 2013 https://doi.org/10.1061/(ASCE)ME.1943-5479.0000148
- L. Koskela, "Lean production in construction", in Lean Construction, L. Alarcon, Editor, A.A.Balkema: Rotterdam, pp. 1-10, 1997.
- G. Ballard, and G. Howell, "Implementing Lean Construction: Stabilizing work flow", in Lean Construction, L. Alarcon, Editor A.A.Balkema: Rotterdam. pp. 105-114, 1997.
- A. Serpell, A. Venturi, and J. Contreras, "Characterization of waste in building construction projects", in Lean Construction, L. Alarcon, Editor, A.A.Balkema: Rotterdam, pp. 68-81, 1997.
- G. Ballard, "The Last Planner System of production control", University of Birmingham, England, 2000.
- C. Fiallo, and V. Revelo, "Applying LPS to a construction project: a case study in Quito, Ecuador", Proceedings of the 10th IGLC Conference, Gramado, 2002.
- E. Johansen, and G. Porter, "An experience of introducing LPS into a UK construction project", Proceedings of the 11th IGLC Conference, Blacksburg, VA, 2003
- S. Gao, and S. Low, The Last Planner System in China's construction industry - A SWOT analysis on implementation, International Journal of Project Management, Volume 32, Issue 7, October 2014.
- G. Ballard, "Phase Scheduling", Lean Construction Institute, 2000
- L.F. Alarcon, "Tools for the identification and reduction of wastes in construction projects", in Lean Construction, L. Alarcon, Editor A.A.Balkema: Rotterdam, pp. 374-388, 1997.
- A. Bhatla, "Implementation of Lean Construction in IIT Guwahati." bachelor BTP REPORT, Indian Institute of Technology Guwahati, Guwahati, India, 2010.
- K. Charmaz, "Constructing Grounded Theory: A Practical Guide through Qualitative Analysis". Sage, Thousand Oaks, CA., 2006
- J. Green, and N. Thorogood, "Qualitative Methods for Health Research." Sage, Thousand Oaks, CA., 2004
- A. O. AlSehaimi, P. T. Fazenda, and L. Koskela, "Improving construction management practice with the Last Planner System: a case study." Engineering, Construction and Architectural Management, 21(1), 51 - 64, 201 https://doi.org/10.1108/ECAM-03-2012-0032