• 제목/요약/키워드: Cost item

검색결과 418건 처리시간 0.029초

오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델 (Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs)

  • 박성호;구교진;박성철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

불합격 제품을 재가공하거나 할인판매하는 생산공정에 대한 공정평균의 경제적 결정 (Determining the most profitable process mean for a production process where rejected item is sold at a reduced price or reworked)

  • 이민구;최인수;하태용
    • 품질경영학회지
    • /
    • 제26권3호
    • /
    • pp.46-59
    • /
    • 1998
  • The problem of selecting optimal target values for the mean of the quality characteristic of interest for a production process in which an item is sold in one of two market with different profit / cost structures or reworked. Two profit models are constructed which involve four profit / cost components: profit, production, inspection, and rework costs. Assumed that the quality characteristic of interest is normally distributed, methods of finding the most profitable process mean are presented and a numerical example is given.

  • PDF

부패성 재고의 경제적 주문량에 관한 연구 (A Study on EOQ models for Perishable Inventory)

  • 어윤양
    • 수산경영론집
    • /
    • 제25권2호
    • /
    • pp.103-114
    • /
    • 1994
  • We consider the continous, deterministic, infinite horiton, perishable item inventory, within the setting of a retail sector, in which the price for an item is dependent on the lifetime of inventory. Replenishment cost is kept constant but the carrying cost per units is allowed to vary according to product lifetime. Tro possibilities of variation are considered : (1) Product lifetime is longer than cycletime and (2) Product lifetime is shorter than cycletime. We find the optimal policies and decision rules for perishable product.

  • PDF

수리가능한 품목의 보증비용분석과 응용 (Warranty Cost Analysis and Its Application to Replacement Policy for a Repairable Warranted Item)

  • 손은일;서용성;박영택
    • 품질경영학회지
    • /
    • 제22권3호
    • /
    • pp.54-65
    • /
    • 1994
  • A hybrid warranty policy for a repairable item is considered. Assuming that minimal repairs ar e performed for failures during warranty period, present worth of warranty cost is derived from a supplier's viewpoint. An optimal preventive periodic replacement policy for the case is also derived from a user's viewpoint Numerical examples are presented in order to explain the results.

  • PDF

SiC Mosfet's Application

  • Kim, Simon
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2018년도 전력전자학술대회
    • /
    • pp.519-521
    • /
    • 2018
  • For most of application, total system cost is first priority to Engineer. Approach for making system cost down can be to reduce cooling cost by selecting low loss item or reducing filter cost by increasing frequency. SiC Mosfet ($CoolSiC^{TM}$) can approach both of case. This paper shows market-needs and reviews each application with SiC.

  • PDF

V-METRIC 관련연구들에 관한 고찰 (Review of Studies on V-METRIC Related Models)

  • 김윤화;이성용
    • 시스템엔지니어링학술지
    • /
    • 제12권2호
    • /
    • pp.47-57
    • /
    • 2016
  • As the inventory costs of repairable items in military logistics continue to increase, many studies for optimal inventory level of these items are being carried out in advanced countries, including the US, to reduce these costs. Research on inventory level optimization for repairable items aimed to achieve the availability goal of a system with a MIME(Multi Indenture Multi Echelon) repair policy structure first began with Sherbrooke's METRIC and developed into various types. This research is to analyze and compare recent V-METRIC related studies to search for another variation in this field. This paper mainly looks at how to determine optimum inventory level for each repairable item to achieve a specific availability target within a limited budget, and also how to minimize inventory cost while achieving its availability target by determining optimal inventory level of each repairable item.

Determination of an economical shipping route considering the effects of sea state for lower fuel consumption

  • Roh, Myung-Il
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제5권2호
    • /
    • pp.246-262
    • /
    • 2013
  • With increases in international oil prices, the proportion of fuel cost to the operational costs of a ship is currently increasing. To reduce fuel cost, a method for determining an economical route for a ship based on the acquisition of the sea state and the estimation of fuel consumption is proposed. The proposed method consists of three items. The first item is to acquire the sea state information in real time. The second item is to estimate the fuel consumption of a ship according to the sea state. The last item is to find an economical route for minimal fuel consumption based on the previous two items. To evaluate the applicability of the proposed method, it was applied to routing problems in various ocean areas. The result shows that the proposed method can yield economical ship routes that minimize fuel consumption. The results of this study can contribute to energy savings for environmentally friendly ships.

마모 수준에 의거한 예방 정비 모형 (A Preventive Maintenance Model Based on the level of item degradation)

  • 구자항;김원중
    • 산업경영시스템학회지
    • /
    • 제15권26호
    • /
    • pp.173-179
    • /
    • 1992
  • This paper is concerned with preventive maintenance model for the items whose failures are dependent on their wear level. The previous maintenance models have used time as their decision variable, but it is not appropriate for the case which have wear dependent processes for their failures. In this paper, we consider an operating item which is under periodic review and which is subject to degradation. The scheduled maintenance (overhaul ) is based on the level of item degradation rather time. A functional equation for the total expected cost over an infinite horizon period is formulated and solved.

  • PDF

한국형 고속전철 시스템의 추정/투입비용 분석 (Prediction/Investment Cost Analysis for korea High-Speed Railway System)

  • 이태형;박춘수
    • 시스템엔지니어링워크숍
    • /
    • 통권1호
    • /
    • pp.60-64
    • /
    • 2003
  • In this study, we have analyzed the cost of korea high-speed railway system. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research & development activity in planning phase is relatively correct.

  • PDF

한국형 고속전철 시스템의 비용분석 (Life Cycle Cost Analysis for Korea High-Speed Rail Project)

  • 이태형;목진용;박춘수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.376-381
    • /
    • 2002
  • In this study, we have analyzed the cost of korea high-speed rail project. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research St development activity in planning phase is relatively correct.

  • PDF