• Title/Summary/Keyword: Cost factor

Search Result 2,580, Processing Time 0.025 seconds

A Study on Effective Enhancement of Load Power Factor Using the Load Power Factor Sensitivity of Generation Cost

  • Lee Byung Ha;Kim Jung-Hoon
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.3
    • /
    • pp.252-259
    • /
    • 2005
  • Various problems such as increase of power loss and voltage instability may often occur in the case of low load power factor. The demand of reactive power increases continuously with the growth of active power and restructuring of electric power companies makes the comprehensive management of reactive power a troublesome problem, so that the systematic control of load power factor is required. In this paper, the load power factor sensitivity of generation cost is derived and it is used for effectively determining the locations of reactive power compensation devices and for enhancing the load power factor appropriately. In addition, voltage variation penalty cost is introduced and integrated costs including voltage variation penalty cost are used for determining the value of load power factor from the point of view of economic investment and voltage regulation. It is shown through application to a large-scale power system that the load power factor can be enhanced effectively using the load power factor sensitivity and the integrated cost.

A Study on a Methodology of Determining an Appropriate Load Power Factor Effectively by the Use of Reactive Power Sensitivity and Load Duration Curve (무효전력 민감도와 부하지속곡선을 활용한 적정 부하역률의 효과적인 산정 기법에 관한 연구)

  • Lee, Byung Ha;Hwang, Sung-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.12
    • /
    • pp.1782-1790
    • /
    • 2012
  • In this paper, a methodology to use load duration curve and the reactive power factor sensitivity of generation cost is proposed for analyzing the effects of load power factor effectively. A great deal of cases of power systems are classified into several patterns according to the characteristics using load duration curve, and the overall effects of load power factor are assessed by integrating the analysis results of load power factor in all the patterns. The reactive power sensitivity of generation cost and the integrated costs such as generation cost, investment cost, voltage variation penalty cost and CO2 emission cost are used for determining an appropriate load power factor. A systematic procedure for effective analysis of load power factor is presented. It is shown through the application to the practical power system of KEPCO(Korea Electric Power Corporation)that the effects of load power factor can be analyzed effectively using load duration curve and reactive power factor sensitivity.

Stability of Construction Cost-variability Factor Rankings from Professionals' Perspective: Evidence from Dar es Salaam -Tanzania

  • Shabani, Neema;Mselle, Justine;Sanga, Samwel Alananga;Kanuti, Arbogasti Isidori
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.2
    • /
    • pp.17-33
    • /
    • 2018
  • This study investigates the stability of professionals' cost variability factor-rankings across different levels of cost-variability and response scenarios. Descriptive statistics are used to examine the stability of factor-ranking for 20 cost variability factors and a Multinomial Logistic (MNL) regression model was implemented to examine the stability of cost variability factors across three cost variability levels. The finding on the descriptive statistics indicated that professionals' factors-rankings are stable only for external factors. The MNL regression results on factor-stability suggested that 8 out of the 20 evaluated factors were unstable determinant of lower cost variability levels. These factors are "risk associated with the project", "personal bias and poor professionalism of the estimators", "limited time available to complete the project", "lack of skills and experience by estimator" "geographical location of projects", "incomplete & rush designs for estimate", "unforeseen or unexpected site constraints", "high class bidders for the contractors". Similarly lack of experience and large size projects were observed to be unstable as well. These observations suggest that professionals' view on pre-tender cost variability factor-ranking yields unstable factor rankings hence should not be relied upon as the only mechanisms to mitigate cost related risks in construction projects.

Quantity Surveyors' Perception of Cost Impact Factors in Hong Kong Civil Engineering Projects

  • Chiu, Wai Yee Betty;Lau, Hat Lan Ellen
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.1-9
    • /
    • 2015
  • Project cost is an important concern in any construction project. Although there has been a lot of studies on factors affecting the cost of construction projects, there seems no consensus as what cost factors have direct influence on the cost of civil engineering projects. This study therefore aims to bridge the current knowledge gap by examining quantity surveyors' perception of the factor structure among nineteen costing attributes identified based on literature review. Questionnaire was used to elicit responses from quantity surveyors working in the Hong Kong construction industry. Principal component analysis is conducted to extract the factor structure of the cost attributes and the attributes are grouped into three factor components, namely the contract management factor, the project management factor and the monetary value factor. Understanding these cost impact factors could be crucial in managing civil engineering projects, since it allows the project stakeholders and quantity surveyors to take precautionary steps to identify the cost management problems and areas for improvement and could even help to avoid cost deviations in engineering projects.

A Study on the Effective Enhancement of the Load Power Factor Using the Load Power Factor Sensitivity of Generation Cost (부하역률 감도기법 적용에 의한 효율적인 부하역률 개선에 관한 연구)

  • Lee Byung Ha;Kim Jung-Hoon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.1
    • /
    • pp.18-24
    • /
    • 2005
  • Various problems such as the increase of the power loss and the voltage instability may often occur in the case of low load power factor. The demand of reactive power increases continuously with the growth of active power and the restructuring of electric power companies makes the comprehensive management of reactive power a troublesome problem, so that the systematic control of load power factor is required. In this paper, the load power factor sensitivity of the generation cost is derived and it is used for determining the locations of reactive power compensation devices effectively and for enhancing the load power factor appropriately. In addition, the voltage variation penalty cost is introduced and the integrated costs including the voltage variation penalty cost are used for determining the value of the load power factor from the point of view of the economic investment and voltage regulation. It is shown through the application to a large-scale power system that the load power factor can be enhanced effectively and appropriately using the load power factor sensitivity and integrated costs.

Cost Structure of Medical Services in Korean National Health Insurance (건강보험 의료행위의 비용구조)

  • Oh, Young-Sook;Kang, Gil-Won
    • Health Policy and Management
    • /
    • v.20 no.2
    • /
    • pp.40-52
    • /
    • 2010
  • Health insurance fees are set by relative value scales and conversion factors. Since 2008 the conversion factor has been classified into 7 according to the provider type, and a separate contract has been made respectively. As such classification of the conversion factor reflects only the different characteristics of providers, however, further classification to reflect the different cost structures of providers is proposed. Cost varies according to the type of not only providers but also services each provider supply. In fact different cost structures of providers are the result of their different services. This study analyzed the cost structure of medical services to propose a new approach to the classification of the conversion factor. This study analyzed the cost structure of medical services using cost data constructed in the revision study of relative value scales. The cost data consist of doctor's fee, support staff's fee, cost of medical equipments, cost of medical supplies and indirect cost. The proportion of each cost component to the total cost was analyzed in terms of service department and service type. 72 service groups are defined in terms of the combination of service department and service type. Through cluster analysis, 72 service groups were reduced into 7 clusters each of which has a similar cost structure. Conversion factor is contracted annually to reflect the change in the cost of providing medical services. So the classification of conversion factor has to be based on the cost structures of medical services, not the characteristics of providers. Service clusters derived in this study can be used as a new classification for health insurance fee contract.

A study of the method of reasonably computing TR Loss-factor in competitive market (경쟁적 전력시장에서 적용 가능한 합리적 송전손실지수 산정에 관한 연구)

  • Kim, Kang-Won;Kim, Jong-Man;Han, Seok-Man;Kim, Bal-Ho H.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.85-87
    • /
    • 2004
  • In the past, TR-cost was collected the combination of energy cost. When power market is restructured. TR-cost is collected the separated form of loss-cost, congestion-cost and maintenance-cost. One of thorn, loss-cost is computed by using TR loss-factor. We need correct and fair standards of loss factor to offer economical signal and to protect against confusions of investment and bidding. Therefore, we propose the method of minimizing system loss-cost that is based on fair and correct loss-factor.

  • PDF

A Study on the Effective Enhancement of the Load Power Factor Using the Load Power Factor Sensitivity of Generation Cost (발전비용의 부하역률 감도를 이용한 효율적인 역률 개선 연구)

  • Lee, B.H.;Oh, M.H.;Kim, J.H.;Shim, K.B.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.196-198
    • /
    • 2003
  • The low load power factor causes various problems such as the increase of the power loss and the voltage instability. The demand of reactive power increases continuously with the growth of active power and the restructuring of electric power companies makes the integrated management of ractive power troublesome, from which the systematic control of load power factor is required. In this paper, the load power factor sensitivity of the generation cost is derived and its effects in supplying the reactive power and enhancing the load power factor are analyzed in a small-scale power system. The load power factor sensitivity of the generation cost is applied for determining the locations and capacities of reactive power compensation devices. It is shown that the generation cost can be reduced and the system power factor can be enhanced effectively using the load power factor sensitivity.

  • PDF

The Sensitivity Comparison of Each Risk Factors Analysis on Renewable Energy and Other Generating Technologies (신재생 에너지와 기존 발전기술과의 투자리스크 요인별 민감도 비교)

  • Koh, Kyung-Ho;Park, Se-Ik
    • New & Renewable Energy
    • /
    • v.7 no.4
    • /
    • pp.10-17
    • /
    • 2011
  • Recently, electricity industry is facing high market uncertainty which has ever had and which increase risks in power market. In this study, we analyze risk factors such as discount rates, initial investment (overnight cost), plant factor, fuel cost, carbon price, etc, for the perspective of investor. For the analysis of risk factors, we used LCOE method. The results of this study show that renewable energy is more affected by plant factor and overnight cost than other risk factors. First, Renewable energy has higher proportion of overnight cost in the total investment than that of other technologies. Second, renewable energy is free of fuel cost and carbon price so plant factor is the most important factor, in other words, competitiveness of renewable energy depends on plant factor. Furthermore, we conducted economic feasibility of wind power and PV in domestic case study. The minimum requirement condition to get profitability is that plant factor 15% and overnight cost \6,000,000/kW and 26%, \2,200,000/kW for PV and Wind Power, respectively.

Cost Scaling Factor according to Power Plant Capacity Change (발전소 용량변경에 따른 비용보정계수)

  • Ha, Gak-Hyeon;Kim, Sung-Hwan
    • Journal of Energy Engineering
    • /
    • v.22 no.3
    • /
    • pp.283-286
    • /
    • 2013
  • The existing nuclear power plants have been often redesigned by increasing or decreasing electrical power without changing design concept by the request of utility, economic factors or other factors. When the cost of power plant equipment redesigned by changing reactor power and electrical power is estimated, if its quotation is not available in the market place, cost scaling factor(CSF) applies to the cost of existing plant equipment and then the new-designed equipment cost can be calculated. In this paper, we review CSFs according to plant capacity change cases in United State DOE, EPRI, ABB, SWEC and introduce the results applied to Korean PWR 1000MWe and 1400MWe.