• Title/Summary/Keyword: Cost estimation simulation

Search Result 261, Processing Time 0.025 seconds

A Simulation Study for the Optimum Design of Cogeneration System (소형열병합발전 최적 시스템 설계 시뮬레이션)

  • Im, Yong-Hoon;Park, Hwa-Choon;Choi, Young-Ho;Chung, Mo
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.325-331
    • /
    • 2009
  • In this paper, a simulation approach for the optimum design of cogeneration system is described. For the purpose of the systematic analysis, a simulation tool is developed with which the prediction of the energy load, calculation of operation data according to prime mover or capacity of it, and estimation of economic gains can be carried out. As for the criterion of the optimum design, the economic gains by adopting cogeneration system is taken. Based on the capital, operation, and maintenance costs etc, LCC analysis is to be carried out for the scenarios respectively. In this study, the simulation for the apartment complex is performed and the analysis of the results are described in detail. The effects of the operation parameters such as capital cost, fuel cost, and unit cost for the purchase or sale of heat and electricity on overall economy are also be considered by sensitivity study.

  • PDF

Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader (시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임)

  • Han, Ye-Ryeong;Park, Hee-Sung;Chang, Chul-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.105-111
    • /
    • 2009
  • Construction equipment is a very important factor for successful construction. Also, the cost for construction equipment is a major part of the cost of construction. Therefore, the estimation of the equipment cost is a critical task in construction planning. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability and cost. Although the performance of the equipment has improved over time, the variables in the formula have not been updated in a timely manner. Therefore, this paper has analyzed the preceding research, and performed several site visits to measure the cycle time of a backhoe and a loader. Construction equipment production rates were calculated with collected cycle times and variables given in 'Standard Unit Labor'. In addition,production rates were estimated considering the circumstances of various sites with the simulation program 'crystal ball.'

An Efficient Data Traffic Estimation Technique in Defense Information Network through Network Simulation (네트워크 시뮬레이션을 통한 군 통신 정보유통량의 효율적 예측 기법)

  • An, Eun-Kyung;Lee, Seung-Jong
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.1
    • /
    • pp.133-158
    • /
    • 2006
  • The change of information and communications technology affects into many parts of military battlefield as the future warfare will be information-oriented warfare, relying on information technology. The more IT-based military systems are deployed the more multimedia data traffic increase. To accommodate such user's requirements the bandwidth capacity of military communications network must be upgraded. The cost of upgrading network capacity is increasing as well. But there has no systematic estimation approach to analyze the amount of data traffic in the military network. In this paper we suggest an efficient data traffic estimation technique using network simulation with the respect of Input and output, scenario, toolset and technique, and experimental environments.

Development of Construction Cost Estimation Model with the Actual Cost Data for Rural Development Project (실적자료에 의한 농어촌정비사업 사업비 결정에 있어서의 단가모델 구축)

  • 배연정;이정재;윤성수
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.359-364
    • /
    • 1999
  • Providing the reasonable construction cost at the initial stage of the rural development project, is a kety factor of the each step of project , such as propriety analysis , cost planning , design, and planning the progress of work. The explainable construction cost can be estimated at the early stage using the actual cost data by statistical analysis. In this study, the influence factors are extracted by factor analysis with the actual cost data of rural development project, object cost model is developed by multiple regression analysis, and verify the developed cost model by Monte-Carlo simulation .

  • PDF

Life Cycle Cost Estimation for Jangbogo-II Submarines based on Modeling and Simulation Methodologies (M&S기법을 활용한 장보고 II급 잠수함 수명주기비용 추정)

  • Ahn, Jae-Kyoung;Choi, Bong-Wan;Lee, Yong-Kyu
    • IE interfaces
    • /
    • v.23 no.3
    • /
    • pp.221-228
    • /
    • 2010
  • With the development of science and technology, modern submarines are equipped with high technology devices and multi-functioned precise armaments, consequently, acquisition cost as well as maintenance cost of the submarines are getting higher and higher. However, tight defense budget forces navy to significantly reduce military operating and maintenance costs. In this study, the maintenance and operating costs of submarine Jangbogo-II are estimated through M&S (Modeling and simulation) methodologies in order to reasonably and consistently work out the requirement verification system of Jangbogo-II. The maintenance and operating costs of Jangbogo-II along the next 25 years are estimated as 312.65 billion won via engineering analysis methods while 312.69 billion won from PRICE Model, which shows only 0.04 billion won differences as a whole. This study is expected to be able to provide meaningful decision making data for not only short and/or mid term operating planning but military budgeting.

Sparse Channel Estimation of Single Carrier Frequency Division Multiple Access Based on Compressive Sensing

  • Zhong, Yuan-Hong;Huang, Zhi-Yong;Zhu, Bin;Wu, Hua
    • Journal of Information Processing Systems
    • /
    • v.11 no.3
    • /
    • pp.342-353
    • /
    • 2015
  • It is widely accepted that single carrier frequency division multiple access (SC-FDMA) is an excellent candidate for broadband wireless systems. Channel estimation is one of the key challenges in SC-FDMA, since accurate channel estimation can significantly improve equalization at the receiver and, consequently, enhance the communication performances. In this paper, we study the application of compressive sensing for sparse channel estimation in a SC-FDMA system. By skillfully designing pilots, their patterns, and taking advantages of the sparsity of the channel impulse response, the proposed system realizes channel estimation at a low cost. Simulation results show that it can achieve significantly improved performance in a frequency selective fading sparse channel with fewer pilots.

An Improved Three-Step Search Algorithm for Block Motion Estimation

  • Hong, Won-Gi
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.9B
    • /
    • pp.1604-1608
    • /
    • 2000
  • The three-step search (TSS) algorithm for block motion estimation has been widely used in real-time video coding due to the simplicity of the algorithm significant reduction of computationl cost and good performance. In this paper an improved three-step search (ITS) algorithm is proposed to improve the performance of the TSS algorithm. Simulation results show that in terms of motion compensation errors the proposed ITSS outperforms some popular fast search algorithms while it has the lower computational complexity.

  • PDF

Analysis of Life Cycle Cost for Heat Source Equipments in Buildings for Adolescent Trainees (청소년 수련관의 열원설비 대안별 생애주기 비용에 관한 연구)

  • Ahn, Chang-hwan;Pang, Seung-ki;Baik, Yong-gyu
    • KIEAE Journal
    • /
    • v.5 no.3
    • /
    • pp.25-31
    • /
    • 2005
  • Computer simulations were performed for Heating Ventilating and Air-Conditioning (HVAC) systems to figure out more efficient maintenance methods for the building used for adolescent trainees. This study aims at suggesting design alternatives for optimum operation and performing life cycle cost (LCC) for each alternative. First, the capacity of the heat source equipment was determined using annual maximum heating and cooling loads. Annual loads were calculated and applied to the alternative for the purpose of calculating annual energy cost. Second, several types of data were collected to predict energy cost. Finally, the pay back period for each alternative was calculated using total cost estimation during standard duration period. This study indicates that the absorption chiller that does not occupy most part of a mechanical room, and does not need much operation cost was most economical.

Estimation of Discretionary Fuel for Airline Operations

  • Chang, Hyoseok
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.29 no.2
    • /
    • pp.1-13
    • /
    • 2021
  • Fuel costs represent one of the most substantial expenses for airlines, accounting for 20% - 36% of the airline's total operating cost. The present study discusses the so-called discretionary fuel that is additionally loaded at the discretion of airlines to cover unforeseen variations from the planned flight operations. The proper range of the discretionary fuel to be loaded for economic flight operations was estimated by applying Monte Carlo simulation technique. With this simulation model for loading discretionary fuel, airlines cannot only reduce the total amount of fuel to be consumed but also minimize the risk of unplanned flight disruptions caused by insufficient fuel on board. Airlines should be able to guarantee proper risk management processes for fuel boarding by carrying enough fuel to high-risk airports. This study would provide a practical guideline for loading proper amounts of discretionary fuel. Future researchers should be encouraged to improve this study by elaborating the weather variable.

SLNR-based Precoder Design in Multiuser Interference Channel with Channel Estimation Error

  • Seo, Bangwon
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.14 no.1
    • /
    • pp.40-52
    • /
    • 2020
  • In this paper, we consider a precoder design problem for multiuser interference channel. Most of the conventional schemes for precoder design utilize a signal-to-interference-plus-noise ratio (SINR) as a cost function. However, since the SINR metric of a desired transmitter-receiver pair is a function of precoding vectors of all transmitters in the multiuser interference channel, an analytic closed-form solution is not available for the precoding vector of a desired transmitter that maximizes the SINR metric. To eliminate coupling between the precoding vectors of all transmitters and to find a closed-form solution for the precoding vector of the desired transmitter, we use a signal-to-leakage-plus-noise ratio (SLNR) instead as a cost function because the SLNR at a transmitter is a function of the precoding vector of the desired transmitter only. In addition, channel estimation errors for undesired links are considered when designing the precoding vector because they are inevitable in a multiuser interference channel. In this case, we propose a design scheme for the precoding vector that is robust to the channel estimation error. In the proposed scheme, the precoding vector is designed to maximize the worst-case SLNR. Through computer simulation, we show that the proposed scheme has better performance than the conventional scheme in terms of SLNR, SINR, and sum rate of all users.