• 제목/요약/키워드: Cost control

검색결과 5,839건 처리시간 0.03초

Reducing Common-Mode Voltage of Three-Phase VSIs using the Predictive Current Control Method based on Reference Voltage

  • Mun, Sung-ki;Kwak, Sangshin
    • Journal of Power Electronics
    • /
    • 제15권3호
    • /
    • pp.712-720
    • /
    • 2015
  • A model predictive current control (MPCC) method that does not employ a cost function is proposed. The MPCC method can decrease common-mode voltages in loads fed by three-phase voltage-source inverters. Only non-zero-voltage vectors are considered as finite control elements to regulate load currents and decrease common-mode voltages. Furthermore, the three-phase future reference voltage vector is calculated on the basis of an inverse dynamics model, and the location of the one-step future voltage vector is determined at every sampling period. Given this location, a non-zero optimal future voltage vector is directly determined without repeatedly calculating the cost values obtained by each voltage vector through a cost function. Without utilizing the zero-voltage vectors, the proposed MPCC method can restrict the common-mode voltage within ± Vdc/6, whereas the common-mode voltages of the conventional MPCC method vary within ± Vdc/2. The performance of the proposed method with the reduced common-mode voltage and no cost function is evaluated in terms of the total harmonic distortions and current errors of the load currents. Simulation and experimental results are presented to verify the effectiveness of the proposed method operated without a cost function, which can reduce the common-mode voltage.

PSO를 이용한 물 재이용 펌프시스템의 에너지 비용 제어 (Energy Cost Saving Control of Water Reuse Pumping System Using Particle Swarm Optimization)

  • 부창진;김호찬;강민제
    • 한국산학기술학회논문지
    • /
    • 제16권1호
    • /
    • pp.860-867
    • /
    • 2015
  • 본 논문은 PSO 알고리즘을 이용하여 물 재이용 펌프 시스템의 에너지비용을 최소화 할 수 있는 방법을 제안한다. 1시간 단위의 시간대에서 펌프제어를 위해 계시별 요금제를 기반으로 하여 최적화 구간을 설정하고 PSO알고리즘을 이용하여 에너지 비용을 절감할 수 있도록 펌프동작을 제어한다. 물 재이용 펌프시스템에서 고정된 유량을 출력하는 펌프와 입력전력을 가변할 수 있는 펌프에 대해 TOU 기반에서 에너지 비용을 최대로 줄일 수 있도록 시스템을 동작시킨다. 시뮬레이션을 통해 제안한 에너지 비용 절감 방법이 기존 수위기반의 제어방법보다 비용을 절감할 수 있음을 확인할 수 있다.

Halal Orientation Strategy(HOS) Reinforces to Positive Results on Quality, Time, Cost Control and Flexibility among Halal Food Manufacturers in Malaysia Context

  • Talib, Zunirah Md;Kassim, Normalini Md;Zainuddin, Yuserrie
    • 아태비즈니스연구
    • /
    • 제9권2호
    • /
    • pp.15-37
    • /
    • 2018
  • The purpose of this paper was to explain on the conceptualisation of the Halal Orientation strategy (HOS) based on operation strategy perspective. The four variables constitute in HOS are staffing, materials, production process and storage together with transportation. By focusing on HOS, the manufacturers reinforce improvement in quality, cost control, time and flexibility of the production Halal food industry in Malaysia which is the performance objective of market competitiveness in Malaysia context. A self-administered questionnaire was designed and used to assess the significant of HOS that lead to improve quality, cost control, reduction in time and the flexibility among Halal food manufacturers in Malaysia. From a total of 443 Halal food manufacturers were involved in this study, only 137 respondents are usable for this research. The study showed significant results for the manufacturers to focus in Halal Orientation strategy (HOS) which have positive impacts on quality, cost control, time and flexibility. This research aimed to measure the HOS among food firms in Malaysia and to determine HOS in relation with the performance objective of operational outcomes.

  • PDF

Path following of a surface ship sailing in restricted waters under wind effect using robust H guaranteed cost control

  • Wang, Jian-qin;Zou, Zao-jian;Wang, Tao
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제11권1호
    • /
    • pp.606-623
    • /
    • 2019
  • The path following problem of a ship sailing in restricted waters under wind effect is investigated based on Robust $H_{\infty}$ Guaranteed Cost Control (RHGCC). To design the controller, the ship maneuvering motion is modeled as a linear uncertain system with norm-bounded time-varying parametric uncertainty. To counteract the bank and wind effects, the integral of path error is augmented to the original system. Based on the extended linear uncertain system, sufficient conditions for existence of the RHGCC are given. To obtain an optimal robust $H_{\infty}$ guaranteed cost control law, a convex optimization problem with Linear Matrix Inequality (LMI) constraints is formulated, which minimizes the guaranteed cost of the close-loop system and mitigates the effect of external disturbance on the performance output. Numerical simulations have confirmed the effectiveness and robustness of the proposed control strategy for the path following goal of a ship sailing in restricted waters under wind effect.

건축공사 환경관리비 운영체계 비교 분석 (Comparative Analysis of the Environmental Management Cost in Building Construction Sites)

  • 구자건
    • KIEAE Journal
    • /
    • 제10권4호
    • /
    • pp.111-116
    • /
    • 2010
  • The environmental management is essential for construction projects. The environmental management cost for construction projects is used for various purposes to control the environmental pollution and treat the wastes generated from the construction sites. Six construction cases were analyzed to compare the environmental management cost. The proportion of environmental management cost for total construction budget should be higher than 0.70% in redevelopment projects and 0.30% in newly constructed buildings, respectively, but every six construction cases did not meet the legal requirement. Redevelopment projects expanded more environmental management cost than the newly constructed projects especially in noise control and wastes treatment. In case of apartment construction projects, the proportion of environmental management cost of redevelopment buildings is 2.4 times higher than the newly constructed buildings, but in all cases, paid more attention to the noise and waste controlling measures than the wastewater treatment. It is needed to ensure the cost-effectiveness of environmental management for achieving the eco-friendly construction sites.

수명주기비용을 고려한 설계 및 관리 방안 (The Methodology of Design to LCC)

  • 나인성;이재원;박명규
    • 대한안전경영과학회지
    • /
    • 제8권5호
    • /
    • pp.131-137
    • /
    • 2006
  • The Cost has been much emphasized in inside of an army because of the promotion of reconciliation atmosphere between South and North Korea and the reduction of defense budget since 1990. So we are now faced with the problem that we should consider a cost above all besides the performance and arrangement for such a restriction of budget in time of developing new generation weapon systems. In this research we are suggested following two methodologies. One is the develop a weapon system with optimum cost considering a Life Cycle Cost from the first stage of design and the other is the cost control and management with the establishment of Target cost.

Evaluation of Fuel Economy for a Parallel Hybrid Electric Vehicle

  • Park, Dookhwan;Kim, Hyunsoo
    • Journal of Mechanical Science and Technology
    • /
    • 제16권10호
    • /
    • pp.1287-1295
    • /
    • 2002
  • In this work, the fuel economy of a parallel hybrid electric vehicle is investigated. A vehicle control algorithm which yields operating points where operational cost of HEV is minimal is suggested. The operational cost of HEV is decided considering both the cost of fossil fuel consumed by an engine and the cost of electricity consumed by an electric motor. A procedure for obtaining the operating points of minimal fuel consumption is introduced. Simulations are carried out for 3 variations of HEV and the results are compared to the fuel economy of a conventional vehicle in order to investigate the effect of hybridization. Simulation results show that HEV with the vehicle control algorithm suggested in this work has a fuel economy 45% better than the conventional vehicle if braking energy is recuperated fully by regeneration and idling of the engine is eliminated. The vehicle modification is also investigated to obtain the target fuel economy set in PNGV program.

WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구 (Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS.)

  • 안재홍;이영도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

시간지연을 가지는 변수 불확실성 특이시스템의 비약성 강인 보장비용 제어 (Robust Non-fragile Guaranteed Cost Control for Uncertain Descriptor Systems with State Delay)

  • 김종해
    • 전기학회논문지
    • /
    • 제56권8호
    • /
    • pp.1491-1497
    • /
    • 2007
  • This paper considers robust and non-fragile guaranteed cost controller design method for descriptor systems with parameter uncertainties and time delay, and static state feedback controller with gain variations. The existence condition of controller, the design method of controller, the upper bound to minimize guaranteed cost function, and the measure of non-fragility in controller are proposed using linear matrix inequality (LMI) technique, which can be solved efficiently by convex optimization. Therefore, the presented robust and non-fragile guaranteed cost controller guarantees the asymptotic stability and non-fragility of the closed loop systems in spite of parameter uncertainties, time delay, and controller fragility.

DEELOPMENTS IN ROBUST STOCHASTIC CONTROL;RISK-SENSITIVE AND MINIMAL COST VARIANCE CONTROL

  • Won, Chang-Hee
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 Proceedings of the Korea Automatic Control Conference, 11th (KACC); Pohang, Korea; 24-26 Oct. 1996
    • /
    • pp.107-110
    • /
    • 1996
  • Continuing advances in the formulation and solution of risk-sensitive control problems have reached a point at which this topic is becoming one of the more intriguing modern paradigms of feedback thought. Despite a prevailing atmosphere of close scrutiny of theoretical studies, the risk-sensitive body of knowledge is growing. Moreover, from the point of view of applications, the detailed properties of risk-sensitive design are only now beginning to be worked out. Accordingly, the time seems to be right for a survey of the historical underpinnings of the subject. This paper addresses the beginnings and the evolution, over the first quarter-century or so, and points out the close relationship of the topic with the notion of optimal cost cumulates, in particular the cost variance. It is to be expected that, in due course, some duality will appear between these notions and those in estimation and filtering. The purpose of this document is to help to lay a framework for that eventuality.

  • PDF