• Title/Summary/Keyword: Cost based pool

Search Result 97, Processing Time 0.026 seconds

Cost Analysis Model according to Mortality in Land-based Aquaculture (육상수조 어류양식 생존율에 따른 비용분석모형)

  • Eh, Youn-Yang
    • The Journal of Fisheries Business Administration
    • /
    • v.47 no.4
    • /
    • pp.1-13
    • /
    • 2016
  • Fish mortality is the most important success factor in aquaculture management. To analyze the effect of mortality considering biological and economic condition is a important problem in land-based aquaculture. This study is aimed to analyze the effect of mortality for duration of cultivation in land-based aquaculture. This study builds the mathematical model that finds the value of decision variable to minimize cost that sums up the water pool usage cost, sorting cost, fingerling cost and feeding cost under critical standing corp constraint. The proposed mathematical model involves many aspects, both biological and economical: (1) number of fingerlings (2) timing and number of batch splitting event, based on (3) fish growth rate, (4) mortality, and (5) several farming expense. Numerical simulation model presented here in. The objective of numerical simulation is to provide for decision makers to analyse and comprehend the proposed model. When extensive biological and cost data become available, the proposed model can be widely applied to yield more accurate results.

The Influence of Excluding No-load Cost from SMP on Cost Reduction Incentive of Generators (계통한계가격(SMP)에서 무부하비용 제외가 발전사 비용절감 유인에 미치는 영향)

  • Kim, Myung Yun;Cho, Sung Bong
    • Environmental and Resource Economics Review
    • /
    • v.23 no.4
    • /
    • pp.617-641
    • /
    • 2014
  • Korean electricity market is a Cost-Based Pool (CBP) designed to minimize electricity production cost through cost by providing cost reduction incentives to generators. Generation companies have shown diverse efforts to reduce costs in CBP market such as procuring low-price fuels, installing high efficiency gas turbine and constructing power plants near the heavy-load site. Recently, as a way to improve CBP market, a proposal to exclude no-load cost from System Marginal Price (SMP) and to compensate generators ex post was suggested to Korea Power Exchange. This study analyzes the impact of excluding no-load cost from SMP on the cost reduction incentive of generators. We found that excluding no-load cost from SMP enhances the likelihood of decreasing the cost reduction incentives of LNG combined-cycle generators lying on the price-setting range.

Study on short period effect of Marginal Loss Factor(MLF) in Cost Based Pool (CBP시장에서 한계손실계수(MLF)의 적용에 따른 단기적 영향분석)

  • Lee, Jae-Gul;Yoon, Yong-Beum;Ahn, Nam-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.43-45
    • /
    • 2006
  • Because Cost Based Pool(CBP) has any locational signals for electricity price, there are any locational incentives for construction of new power plant high efficient. in case of Korean electricity power market, this incentives are very important to reduce loss and congestion. This Paper represent the effect of MLF(Marginal Loss Factor) as locational price signal in short period. we investigate mathematically loss reduced effect of MLF and prove to reduce transmission loss using 3bus test system.

  • PDF

Can Non-Fuel Costs be Considered as Variable Costs in Generation Market? (연료비 이외의 항목도 발전시장의 변동비로 간주할 수 있는가?)

  • Cho, Sung Bong
    • Environmental and Resource Economics Review
    • /
    • v.20 no.3
    • /
    • pp.567-593
    • /
    • 2011
  • In 2005, five Korean generation companies suggested to include non-fuel ancillary costs incurring in the process of managing fuels and ashes as variable costs in Korean Cost-Based Pool. OLS analysis seeking statistical relation with the amount of generation did not provide sufficient ground for such argument. However, some cost items in this category showed meaningful statistical relation for certain generation facilities hinting some possibilities for the candidate of variable costs in the future. Time lag related to cost evaluation, problems related to inventory control and accounting method related to this may block the statistical relationship with the amount of generation. Unified criteria and standardization of the data are necessary before we proceed further to consider them as variable costs.

  • PDF

Bidding Strategics in Competitive Electricity Market (경쟁시장에서 입찰전략 수립에 관한 연구)

  • Ko, Young-Jun;Lee, Hyo-Sang;Shin, Dong-Jun;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.550-552
    • /
    • 2001
  • The vertically integrated power industry was divided into six generation companies and one market operator, where electricity trading was launched at power exchange. In this environment, the profits of each generation companies are guaranteed according to utilization of their own generation equipments. Especially, the electricity demand shows seasonal and weekly regular pattern, which the some capacity should be provided into ancillary service based on the past demand forecasting error and operating results of electricity market. Namely, if generation cost function is applied to SMP and BLMP as announced the previous day, the available generation capacity of the following day could be optimally distributed, and therefore contract capacity of ancillary service applied to CBP(Cost Based Pool) and TWBP(Two-Way Bidding Pool) is determined. Consequently, it is Possible to use the retained equipments optimally. This paper represents on efficient bidding strategies for generation equipments through the calculation of the contract and the application of each generator cost function based on the past demand forecasting error and market operating data.

  • PDF

Production planning in fish farm (어류양식장 생산계획에 관한 연구)

  • EH, Youn-Yang
    • The Journal of Fisheries Business Administration
    • /
    • v.46 no.3
    • /
    • pp.129-141
    • /
    • 2015
  • Because land based aquaculture is restricted by high investment per rearing volume and control cost, good management planning is important in Land-based aquaculture system case. In this paper master production planning was made to decide the number of rearing, production schedule and efficient allocation of water resources considering biological and economic condition. The purpose of this article is to build the mathematical decision making model that finds the value of decision variable to maximize profit under the constraints. Stocking and harvesting decisions that are made by master production planning are affected by the price system, feed cost, labour cost, power cost and investment cost. To solve the proposed mathematical model, heuristic search algorithm is proposed. The model Input variables are (1) the fish price (2) the fish growth rate (3) critical standing corp (4) labour cost (5) power cost (6) feed coefficient (7) fixed cost. The model outputs are (1) number of rearing fish (2) sales price (3) efficient allocation of water pool.

A design method of activity cost pool for activity based costing in logistics systems (물류체계에서의 활동기준원가의 활동원가군 설계방법)

  • 김상훈;임석철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.481-484
    • /
    • 1996
  • When logistics system is integrated with production system and marketing system, it takes a very important role of the business management. In general, measurement of logistics cost in logistics system uses the conventional cost assignment method. However the conventional method may result in the incorrect cost because the overhead cost may be incorrectly assigned to the products. Activity-Based Costing(ABC) was proposed as an alternative method which will distribute the overhead cost to each cost obeject more accurately. ABC assigns cost to activities based on the amounts of resources used by resource driver, and assigns cost to cost objects based on the amount of activities driver. This study proposes two heuristic algorithms. The first algorithm selects the best activity driver for each cost object by using correlation analysis. The best activity driver is the one that minimizes the sum of loss cost and measurement cost of activity driver. The second algorithm selects the best number of activities by using correlation analysis. The pair of activities with the highest correlation are combined into one if the saving of measurement cost is no less than the loss due to inaccurate distribution of overhead cost. In order to demonstrate the procedure and validity of the algorithms, Real data of one year from a paper manufacturer are used.

  • PDF

Productivity of Aquaculture Facility Utilization (양식장 이용에 따른 생산성에 관한 연구)

  • Eh, Youn-Yang
    • The Journal of Fisheries Business Administration
    • /
    • v.45 no.2
    • /
    • pp.85-95
    • /
    • 2014
  • Fish stocking is important element of land-based aquaculture management. To maintain constant stocking rate considering biological and economic condition is a convenient strategy in intensive aquaculture. This study is aimed to analyze the effect of over-stocking(more than aquaculture capacity) for certain periods of time. This study make the mathematical decision making model that finds the value of decision variable to minimize cost that sums up the water pool usage cost and sorting cost under critical standing corp constraint. The proposed mathematical decision making model was applied to 12 sample combination of sorting cost and the number of fish on the Oliver flounder culture farms. If a immature fish can be sold for high price than farming cost, restricted over-stocking resulted in a improvement of economic performance. When extensive comparable biological and market data become available, analysis model can be widely applied to yield more accurate results.

Determination on the Optimal Sample Size in the Aquatic Insect Community Analysis - Pangtae Creek Model (수서곤충 군집분석에 있어서 최적표본크기의 결정 - 방태천 모형)

  • 윤일병;노태호;이성진;박재홍;배연재
    • The Korean Journal of Ecology
    • /
    • v.21 no.5_1
    • /
    • pp.409-418
    • /
    • 1998
  • A molel study was conducted to determine the optimal sample size for the analysis of the aquatic insect community in a stream reach of the Pangtae Creek, Kangwon-do in October 1995 and may 1996. The results showed that the required minimum sample size varied and depended on the purposes of the community analysis. Acoording to the Species: Area Curve method, at least 16 Surber samplings ($30{\times}30cm$) were required in a stream reach in each spring and fall survey. The species diversity index did not vary significantly as the sample size increased. Based on the coefficient of variation analysis, the minimum sample sizes of 10 were required in order to compare seasonal differences of the community in the study area. Considering the static community structure of aquatic insects, including both species numbers and individual numbers of aquatic insects, 11 and 7 samplings were optimal sizes for the fall and spring survey, respectively. We concluded that 12 Surber samplings from 3 riffle-pool sequences (4 samplings at each riffle-pool sequence) would be required in a stream reach (length 1 km) to obtain reliable as well as cost efficient data. Our model showed that the optimal sample size should be determined by interactions between minimum sample size, the degree of data reliability, and cost efficiency.

  • PDF

Generator Maintenance Scheduling for Bidding Strategies in Competitive Electricity Market (경쟁 전력시장에서 발전기 유지보수계획을 고려한 입찰전략수립)

  • 고용준;신동준;김진오;이효상
    • Journal of Energy Engineering
    • /
    • v.11 no.1
    • /
    • pp.59-66
    • /
    • 2002
  • The vertically integrated power industry was divided into six generation companies and one market operator, where electricity trading was launched at power exchange. In this environment, the profits of each generation companies are guaranteed according to utilizing strategies of their own generation equipments. This paper presents on generator maintenance scheduling and efficient bidding strategies for generation equipments through the calculation of the contract and the application of each generator cost function based on the past demand forecasting error and market operating data.