• Title/Summary/Keyword: Cost approach

Search Result 3,245, Processing Time 0.028 seconds

Evaluation of ATC in Haenam-Cheju HVDC System Using Cost Calculation (해남-제주간 직류송전시스템의 비용산정을 통한 ATC계산)

  • Son Hyun-Il;Lee Hyo-Sang;Shin Dong-Joon;Kim Jin-O
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.4
    • /
    • pp.193-198
    • /
    • 2005
  • As the electrical power industry is restructured, the electrical power exchange is extended. One of the key information used to determine how much power can be transferred through the network is known as available transfer capability (ATC). To calculate ATC, traditional deterministic approach is based on the severest case, but the approach has the complexity of procedure. Therefore, novel approach for ATC calculation is proposed using cost optimization in this paper Cheju Island interconnected HVDC system with mainland in KEPCO (Korean Electric Power Corporation) systems, and the demand of Cheju Island increases about 10 ($\%$) every year. To supply for increasing demand, the supply of HVDC system must be increased. This paper proposed the optimal transfer capability of HVDC system between Haenam in mainland and Cheju in Chju Island through cost optimization. The cost optimization is considered production cost in Cheju Island, wheeling charge through Haenam-Cheju HVDC system and outage cost with one depth (N-1 contingency)

The Development of an Product Cost Estimation System at the Product Design Stage (제품 설계 단계에서의 제품 원가 추정 시스템 개발)

  • 한관희;박찬우;이규봉;황태일;김강용
    • Korean Journal of Computational Design and Engineering
    • /
    • v.8 no.2
    • /
    • pp.101-108
    • /
    • 2003
  • Presented in this paper is the development of an product cost estimation system at the product design stage. The efficient cost estimation function at the design stage is essential for the cost reduction activities through the entire product life cycle. For this purpose, it is necessary to establish a systematic working procedure, and to develop information system for managing a great deal of production and product-related data required for the cost estimation. The developed system has the capability of estimating a cost of assembly type products as well as unit-item type products. As proposed system is based on the variant approach, it can be used easily at an early design stage without the need for detail design information. Also, this system is integrated with legacy PDM (Product Data Management) and ERP (Enterprise Resource Planning) system for fast. accurate and easy product cost estimation. The estimated cost includes material cost, overhead cost as well as labor cost.

Cost-Benefit Analysis in Software Acquisition Decision Making Two Dimensional Approach (소프트웨어 확보 의사결정을 위한 손익계산의 상쇄효과 : 2차원적 접근법)

  • 이동만;장명희
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1998.03a
    • /
    • pp.169-176
    • /
    • 1998
  • This article investigates the software acquisition problems as two dimensional : custom/pacakage and insource /outsource. The analysis adopts the cost-benefit frame work in explaining software acquisition problems and takes two leveled approach. The first level examines the cost-benefit relationship of the determinants affecting both dimensions, and these determinants are derived from theories of transaction cost, incomplete contracting, and agency. The second level focuses on the impact of general cost-benefit frivers of the software acquisition decisions. The results facilitate a broader and more detailed understanding on the software acquisition problems.

Valuation of Saved Water by Automated Agricultural Water Management System: Alternative Cost Approach (농업용수관리자동화시스템의 용수절감효과에 대한 경제적 가치 평가)

  • Jee, Yong-Keun;Kim, Sun-Joo;Kim, Phil-Shik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.4
    • /
    • pp.1-6
    • /
    • 2009
  • This study analyzed and evaluated the effect of agricultural water reduction by introducing automated agricultural water management using alternative cost approach. The approach is possible to evaluate none market property as an asset. The saved agricultural water was evaluated as none market property. As the alternative goods, Seongju and Donghwa dam, typical irrigation dams in domestic, were employed. The economic benefit from water saving effect of an automated agricultural water management was calculated as depreciation expense and maintaining cost of construction agricultural dam per saved agriculture water. As a result, the saved agriculture water was 8.5 million ton per year, and the economic benefit of it was $1.3{\sim}2.1$ million won.

Optimum Life-Cycle Cost Design of Steel Box Girder Bridges Using Collaborative Optimization (협동 최적화 방법을 이용한 강상자형교의 생애주기비용 최적설계)

  • 조효남;민대홍;권우성
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.10a
    • /
    • pp.201-210
    • /
    • 2001
  • In this study, large-scale distributed design approach for a life cycle cost (LCC) optimization of steel box girder bridges was implemented. A collaborative optimization approach is one of the multidisciplinary design optimization approaches and it has been proven to be best suited for distributed design environment. The problem of optimum LCC design of steel box girder bridges is formulated as that of minimization of the expected total LCC that consists of initial cost maintenance cost expected retrofit costs for strength, deflection and crack. To discuss the possibility of the application for the collaborative optimization of steel box girder bridges, the results of this algorithm are compared with those of single level algorithm. From the numerical investigations, the collaborative optimization approach proposed in this study may be expected to be new concepts and design methodologies associated with the LCC approach.

  • PDF

An Empirical Approach Study on Construction Cost Estimation in Public Work Projects (공공사업 예정공사비에 대한 실증적 접근)

  • Yoo, Chang-Kyu;Song, Jeong-Gyu;Lee, Yun-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

Valuing Traffic Noise Cost Based on the Damage Cost Approach (피해비용 접근법을 바탕으로 한 소음비용 추정 연구)

  • JUNG, Dongjae;CHANG, Justin S.
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.4
    • /
    • pp.292-306
    • /
    • 2017
  • Traffic noise cost can be assessed either by the damage cost approach or by the avoidance cost method. This paper provides an overview of pertinent studies of these two approaches and shows that the damage cost approach is more universal and reliable than the avoidance cost counterpart. This study then investigated three sub-components to address the damage cost framework. First of all, unit value per person exposed to noise per year was calculated. Secondly, the area exposed to noise was determined using noise prediction equation. Thirdly, the number of people affected by noise was computed by multiplying the number of people exposed to noise with the percentage of people affected by noise. This paper also suggested a simplified equation that represents the relationship between damage costs and noise levels. Finally, the benefits of noise reduction derived from the damage cost method and those from the avoidance cost approach were compared and discussed.

A Study on the Cost Analysis for the Container Terminal Services based on ABC Approach

  • Ryu, Dong-Ha;Ahn, Ki-Myung;Yoon, Yeo-Sang
    • Journal of Navigation and Port Research
    • /
    • v.35 no.7
    • /
    • pp.589-596
    • /
    • 2011
  • Terminal market has rapidly crashed and market rates have taken a sharp plunge. The substantial throughput decrease resulted from the world economic downturn has been a finishing blow to the terminal operators in Busan. Every terminal operator is taking cost saving as its first priority and accelerating structural reform and downsizing. Under the desperate situation, the need of effective cost analysis would be highly required to effectively control operation cost and to develop new services to satisfy the different needs of the customers. Furthermore, terminal operators could reduce unnecessary activities and concentrate their resource on the more cost-effective process through the operation cost analysis. In order to suggest a new framework of the cost control of container terminals, this paper seeks to analyze terminal costs based on ABC approach by processing actual data.

FORECASTING THE COST AND DURATION OF SCHOOL RECONSTRUCTION PROJECTS USING REGRESSION ANALYSIS

  • Wei Tong Chen;Ying-Hua Huang;Shen-Li Liao
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.892-896
    • /
    • 2005
  • This paper collected 132 schools reconstruction projects in central Taiwan, which received the most serious damage from the Chi-Chi Earthquake. Regression analysis was implemented to build the prediction model of the cost and the duration for the collected projects. It is found that the cubic regression models are capable for predicting the cost and the duration of the projects contracted by the central agency of which the contracting awarding approach was based on the most advantageous tendering (MAT) approach. On the other hand, power regression models are capable for predicting the cost and the duration of the projects contracted through the low bid tendering (LBT) approach. It is also found that the performance of the regression prediction model differs in accordance with organizations that contracted the reconstruction projects.

  • PDF

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF