• Title/Summary/Keyword: Cost Save

Search Result 756, Processing Time 0.03 seconds

Construction Cost-Down of Building Substructure by VE Techniques (VE 기법에 의한 건물 지하구조의 공사원가 절감방안)

  • Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.125-132
    • /
    • 2005
  • Domestic construction firms make every effort to save cost and, contrarily, enhance quality for competitive advantage in the market. Structural work of building construction takes chaise of the total cost and schedule, thus elaborate planning and management of the work help to lead the project into a successful way. Therefore, the idea to save time and cost and enhance constructability securing quality and safety of the work should be developed after analyzing the designed documents and site conditions comprehensively in the initial construction planning phase. Value Engineering (VE) technique is introduced in the substructural work in this paper to save cost creatively and systematically in the design and construction phase. A practical VE model that is applied to the underground building work systematically is proposed to save cost and it applies to the actual project to confirm the effectiveness of the model.

Scheduling Optimization for Safety Decommissioning of Research Reactor (연구로 안전 해체를 위한 스케쥴링 최적화)

  • Kim, Tae-Sung;Park, Hee-Seoung;Lee, Jong-Hwan;Chang, Sung-Ho;Kim, Sang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.3
    • /
    • pp.67-75
    • /
    • 2006
  • Scheduling of dismantling old research reactor need to consider time, cost and safety for the worker. The biggest issue when dismantling facility for research reactor is safety for the worker and cost. Large portion of a budget is spending for the labor cost. To save labor cost for the worker, reducing a lead time is inevitable. Several algorithms applied to reduce read time, and safety considered as the most important factor for this project. This research presents three different dismantling scheduling scenarios. Best scenario shows the specific scheduling for worker and machine, so that it could save time and cost.

Comparing the Operation Cost of Washington Safety Rest Areas with Other States Using Performance-Based Method

  • Shrestha, Kishor;Berg, Alix;Tafazzoli, Mohammadsoroush;Kisi, Krishna
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.640-648
    • /
    • 2022
  • In the United States, the Safety Rest Areas (SRAs) were introduced as highway roadside infrastructures in the early 1900s. The State Departments of Transportation (DOTs) operate/maintain their SRAs using different methods. The Washington DOT used the in-house workforce method for over 20 years, whereas some states moved to Performance-Based Contracting (PBC) from the in-house workforce to save cost primarily. Several existing studies claimed that using the PBC approach saved costs on several highway assets. Thus, the principal objective of this study is to compute and compare the unit operating/maintenance cost of SRAs using the in-house workforce method (in Washington state) with the PBC approach (in other states). The findings of this study show that the average annual cost using the PBC approach was much more than the average annual cost using the in-house workforce approach. The findings also show that in Washington state, the 'Labor Cost' category was a key expenditure, which is statistically higher than other categories. The 'Labor Cost' was followed by the 'Other Services', and then 'Materials and Supplies' and 'Equipment.' The study's findings indicated that outsourcing does not always save costs for agencies. The study findings may help transportation construction/maintenance professionals select a cost-effective approach for their future planning.

  • PDF

Design of On-line Process Control with Variable Measurement Interval

  • Park, Changsoon
    • Journal of the Korean Statistical Society
    • /
    • v.29 no.3
    • /
    • pp.319-336
    • /
    • 2000
  • A mixed model with a white noise process and an IMA(0,1,1) process is considered as a process model. It is assumed that the process is a white noise in the absence of a special cause and the process changes to an IMA(0,1,1) due to a special cause. One useful scheme in measuring the process level is to use the variable measurement interval (VMI) between measurement times according to the value of the previous chart statistic. The advantage of the VMI scheme is to measure the process level infrequently when in control to save the measurement cost and to measure frequently when out of control to save the off-target cost. This paper considers the VMI scheme in order to detect changes in the process model from a white noise to an IMA(0,1,1). The VMI scheme is shown to be effective compared to the standard fixed measurement interval (FMI) scheme in both statistical and economic contexts.

  • PDF

A Survey on the Save of Cost for Safety Management by Reduction of Industrial Accidents in Construction Industry (건설업의 산업재해 감소와 관련한 안전관리비용 절감에 관한 조사 연구)

  • 이영섭
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.1
    • /
    • pp.99-107
    • /
    • 1996
  • This survey is to compare the the number of accidents which were occurred in 24 construction companies with the average accident in construction industry. The number of accidents in 24 companiesis is lower than the average accident, then it is classified "save", otherwise it is classified "loss". This survey is conducted to have top management be interested and invest for safety by recognizing that safety management could be profit for the company. The result of this survey is as follows : The total save amount in 1992 is 44,780mi11ion Won and average is 1,870mi11ion Won, with being 11, 200mi11ion Won by reduction amount of deaths and 33,580mi11ion Won by reduction amount of injuries. In 1993 the total is 33,330mi11ion Won and average is 1,390mi11ion Won, and in 1994 the total is 38, 720mi11ion Won and the average is 1,610mi11ion Won. This result is save amount of workmen's compensation insurance with excluding the indirect costs for accidents. The company which ranked the highest save amount is B Construction Company with being 15.1 billion Won and the next is A Construction Company during 3 years. The Company which ranked highest percentage of save amount to sales amount is Q Heavy industry with being 0.359% and the next is B Construction Company during 3 years.pany during 3 years.

  • PDF

Technical Considerations of Recycling Water Treatment/Supply Apparatus using Living Waste Water (생활 오배수를 이용한 중수처리 공급장치의 기술성 고찰)

  • Cho, Chung-Sik;Lee, Hee-Wan;Kim, Hong-Min
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.493-498
    • /
    • 2008
  • The several water resources are showed recently the various pollution types due to the industrialization and the disarranged district development. The living waste water, plant waste water and so are contaminated continuously and the recycling water is concerned highly to save the cost and to improve the environment as the general people. The dust and the heavy metal in the air and the acid rain are contaminating the river water and the underground water. The clean environment is on the rise to the general people and is to be the social problems. There is going to complement and repair the water supplying and fire extinguishing pipeline to save the construction cost and improve the environment in the construction facilities parts. Therefore, in this paper the recycling water treatment/supply apparatus using the living waste water is considerated technically and is raised on the practical uses.

  • PDF

The effect of life insurance settlement on insurance market and consumer welfare

  • Hong, Jimin
    • Communications for Statistical Applications and Methods
    • /
    • v.27 no.6
    • /
    • pp.689-699
    • /
    • 2020
  • This study investigates the effect of life settlement on the monopolistic insurance market. In particular, we consider liquidity cost, which is the cost incurred to the insurer to meet the request of surrender, and trading cost, which is the transaction cost of the policyholders for the settlement. We first show that the introduction of a life settlement can increase insurance demand and enhance consumer welfare even when the trading cost is higher than the liquidity cost. That is, even if the settlement market is less efficient than the insurance market, both insurance demand and consumer welfare can be increased. Second, the insurer's profit can also be increased when settlement is introduced because not only can the insurer save the liquidity cost but also the demand of insurance increases. Lastly, insurance demand does not always decrease when both costs increase. Depending on the population distribution over the liquidity risk, the demand of insurance can be increased or decreased.

An Analysis of the Effects of Energy Saving in Connection with Transformer Loss (변압기 손실에 따른 에너지절감 효과 비교 분석)

  • Choi, In-Ho
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.291-294
    • /
    • 2007
  • Countries in the world are setting up policies to implement anti-global warning measures to actively cope with the Agreement on Climate Change. Rising problems related to energy and environment prompted research and development efforts to highly efficient electric instrument and environmentally friendly products to secure resources and save energy Korea's high dependency on imported energy and its lack in natural resources make it urgently necessary to develop energy efficient instrument and equipment that can save energy. Every household now uses a transformer, which is very important instrument among others. A variety of technologies to manufacture transformers are currently used along with efforts to develop new materials. Development nit of high efficient transformers is called for by the time and has direct economic impact on suppliers and consumers. In addition, it is desirable to install a transformer that is trustworthy, secure, low on loss, anti-incident capable, small, anti-flammable, environmentally friendly, cost-efficient high-frequency resistant and easy for maintenance. To do this, it is necessary to look deeper into a highly efficient transformer that can save energy. This paper will discuss the types and characteristics of various transformers and propose ways to save energy and raise efficiency tv analyzing a environmentally friendly amorphous transformer.

  • PDF

Expert System for Selecting Optimized Farm Machinery in Rice Farming(I) -Program to Minimize Cost in Utilization of Farm Machinery- (수도작을 위한 적정 농기계 선정 전문가 시스템 개발(I) -최소 이용 비용 농기계 선정 프로그램-)

  • 이용범;조성인;유경선;유병기
    • Journal of Biosystems Engineering
    • /
    • v.21 no.4
    • /
    • pp.474-481
    • /
    • 1996
  • Farm mechanization has been rapidly progressed in rice farming since the 1980's, in Korea. The mechanization has been achieved up to 95-97% in the year of 1995, except irrigation and drying process. However, rice production cost remains much more expensive than the cost of other rice farming countries. Since labor cost shares a major portion of the production costs, it is essential to save labor cost with automation and more sophisticated mechanization. However, it requires great capital investment which causes farm management worse. Therefore, the computer program was developed which can select machines to minimize the management and maintenance cost by analyzing available working days in different areas, machinery to purchase, farming size, total farming size in a village, number of machines and custom fee.

  • PDF

A study on the logistics cost reduction in textile industries by introducing Pad Pool System (PPS(PAD POOL SYSTEM) 도입에 의한 섬유업계 물류비 절감에 관한 연구)

  • Kwon An Sik;Park In Sul
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.2
    • /
    • pp.95-106
    • /
    • 2005
  • Many Korean companies are challenged to reduce logistics cost and meet environmental-friendly logistics. The textile companies in harsh competition are requested to make improvement on their logistics environment to cut down the total cost. However, they have reached the limit on improving the manufacturing process. We believe that the logistics department is the most improvable part at present. Improving logistics will be highly effective to cut down the total cost. In this study, we present Pad Pool System(PPS) as the solution to save their logistics cost. PPS, which means the shared use of Styrofoam pads, will enable the textile companies to cut down their cost and strengthen enterprise competitiveness. Also, PPS will be helpful reducing environmental disruption because the system reuses retrieved Styrofoam pads many times.