The total length of Korean urban railways reaches 1,200km. Urban railway used to be installed with ballasted tracks by reason of low cost at the time of construction, slab tracks are now being installed due to the reasons of the improvement in safety, lengthening service life and more economical method in terms of maintenance. The length rate of slab tracks has exceeded 70% of the domestic urban railways with the methods ranging from STEDEF, LVT, ALT, Eidan-type, B2S to RHEDA. This study surveyed the share of domestic slab tracks, and compared and evaluated the input cost at the initial stage by the types of slab tracks. Construction processes have been standardized by the existing design documents and calculated the initial input cost for the length of 1km of a hypothetical straight line. Cost breakdown structure was evaluated as materials cost, construction cost, equipment cost, indirect cost, etc. It is expected that this study will be used in selection & evaluation which is considering the economic feasibility of slab tracks.
A cost-saving feeding rate contro method for a batch reaction process is proposed by reconfigurating the flow rate control loop where the feeding rate is estimated by differentiating weight measurement. While the existing control methods require either a flow rate measurement device or a flow rate estimator, the proposed method is devised not to require neither of these facilities by directly controlling the tank weight with a time-varying set point. Experimental evaluation in a pilot-scale unit shows that the proposed method can significantly reduce the actuator hunting of the existing method where the flow rate is estimated by differentiating the weight measurement.
물리적 기반의 다이내믹 시뮬레이션에 있어서 안정적이고 효율적인 제한 시스템은 매우 중요한 요소 중 하나이다. 본 논문은 기존에 널리 사용되고 있는 제한 시스템들(Lagrange Multiplier method, Baumgarte stabilization method, Post-stabilization Method, Implicit constraint enforcement method, Fast projection method)에 대한 분석과 평가를 통해 제한 시스템을 사용하고자 하는 사용자들에게 적절한 선택을 할 수 있는 지침을 제공하고자 한다. 본 논문은 기존의 제한 방법들에 대한 수학적 수식들이 설명되어 있고, 제한 오차 비교, 계산 비용, 동적 움직임 분석 등을 통해 기존 제한 시스템들 각각에 대한 평가를 제공한다.
This study was conducted to examine the economic evaluation of the newly developed fish meal analog (BAIFA-M) in Korean rockfish feed. A raw fish feed (MP) and two commercially formulated diets (EP) were employed to compare weight gain (WG), feed conversion ratio (FCR) and survival rate (SR) from the sea cage culture system. By using the economic model in the practical sea cage culture system, feed cost, production cost and gross profit per kg production, rate of profit to gross revenue (RPGR), and internal rate of return (IRR) were calculated based upon the results of the experiment and the information of the private aquaculture farm (Young Chang) in Tong young, Korean. IRR criteria is one of the popular economic feasibility analysis methods applicable far aquaculture industry. This is an economic evaluation method to compare the given interest rate or the discount rate with IRR which can be calculated by the difference between the present value of the benefit stream and of the cost stream. The benefits of using EP on WG, FCR, SR, and production cost will be emphasized in this study. Fish averaging 20$\pm$3.6g (Mean$\pm$SD) were randomly distributed in each small cage (6m$\times$6m) as groups of 2,000 fish. By using 3 large size cages (12m$\times$12m), 12 small cages were constructed, and only 9 small cages were employed for three replicates of each diet treatment. To compare with MP diet, two sinking EP diets were designed by our laboratory and produced by the local feed company who wanted to promote these EP diets for the mass cage culture of Korean rockfish in the future. Two EP diets contain white fish meal and/or BAIFA-M as the main animal protein sources : WFM diet, maximum 43% of white fish meal : BAIEA- M diet, 30% of white fish meal nab replaced by BAIFA- M from WFM diet. Results are summarized in Table 1. Fish fed MP diet showed significantly lower SR than does fish fed two EP diets(P<0.05). However, there Were no significant difference on FCR among fish fed three practical diets. Table 1. Average feed conversion ratio (FCR), accumulative average survival rate (SR) and economic evaluation data far three practical diets. As we expected, BAIFA-M diet is more economical than WFM diet as well as MP diet. Feed cost and production cost per kg production from BAIEA - M diet were lower than those from WFM and MP diets. Moreover, gross profit per Kg production, RPGR and IRR from BAIFA- M diet were higher than those from WFM and MP diets. This economic evaluation study clearly indicated that MP diet should be replaced by the commerical formulated EP diets as soon as possible in the near future because MP diet is not economical in the practical sea cage culture system.
It has become important for unutilized energy to be used for air conditioning of building. Economic evaluation on energy system by using treated sewage water as heat source, which is one of unutilized energy, was performed. The floor area of the subject building and the distance between heat source equipment and sewage treatment plant was assumed $30,000m^2$ and 200m. Absorption chiller-heater system was used for comparing to the energy efficient system, and payback period method was applied to carry out economic evaluation. Although the operating cost of this system is reduced compared to general heat source system, the ratio is not meaningful compared to the initial investment cost increase, and payback period was calculated to be about 36.1 years. However, when calculated based on the 2014 rate of electricity and city gas, it will be greatly reduced to 3.1 years. International commodity prices are constantly changing, and therefore national policy on the spread of unutilized energy should be maintained.
Less mature nuclear reactor technologies are characterized by a greater uncertainty due to insufficient detailed design information, operational data, cost information, etc., but the expected performance characteristics of less mature options are usually more attractive in comparison with more mature ones. The greater uncertainty is, the higher economic risks associated with the project realization will be. Within a comparative evaluation of less and more mature nuclear reactor technologies, it is necessary to apply economic risk measures to balance judgments regarding the economic performance of less and more mature options. Assessments of any risk metrics involve calculating different characteristics of probability distributions of associated economic performance indicators and applying the Monte-Carlo method. This paper considers the applicability of statistical risk measures for different economic performance indicators within a trial case study on a comparative evaluation of less and more mature unspecified LWRs. The presented case study demonstrates the main trends associated with the incorporation of economic risk metrics into a comparative evaluation of less and more mature nuclear reactor technologies.
Seo, Hyung-Woo;Yu, Ji-Hwan;Kim, Gi-Lim;Son, Jin-Won
Nuclear Engineering and Technology
/
제54권3호
/
pp.1136-1144
/
2022
The effects of nearby residents and the public by the residual contamination from the decommissioning of nuclear facilities should comply with the dose criteria, and whether additional remediation action is necessary from the ALARA perspective must be determined. Therefore, we analyzed the requirements of ALARA action levels and performed preliminary ALARA evaluation. The ratio of residual contamination concentration to DCGL was calculated for the basement fill and the building occupancy mode. The results showed that the additional remediation actions below DCGL are not justified. In addition, we analyzed the effect of remediation area. It was noted that the increase of the remediation area showed a positive correlation with the Conc/DCGL value in the basement fill mode. On the other hand, in the building occupancy mode, since the floor area of the building is the target of remediation and has the effect of increasing the same as the evaluation area of the building occupants, but due to the difference in the amount of increase, the Conc/DCGL showed a negative correlation. We expect the approach and method of ALARA evaluation can be utilized for concrete cost-benefit calculation during the decommissioning or at the time of remediation.
BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.
R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.
Purpose: This study aimed to develop a web-based cost management program for visiting nursing centers (CMP-VNC), using time-driven activity-based costing (TD-ABC), and to analyze effects of the program. Methods: The CMP-VNC was developed using the combined prototyping approach and system developing life cycle method following four stages: need analysis with comprehensive literature reviews and focus group interviews, design and development of program algorithm, evaluation of the developed program validity using experts and users group, and application and effects analysis. The non-equivalent control group pretest-posttest design was used to analyze the effects of the program. The program demonstration was conducted for four weeks with 60 visiting nurses in 35 visiting centers. Results: The web-based program was developed. It has five interfaces with basic and special functions using TD-ABC, namely, input, visiting nursing activity, visiting nursing activity cost, cost efficiency, and cost calculation report. The experimental group showed significantly higher cost perception and cost confidence than control group. Conclusion: We found that the CMP-VNC can be an effective tool to increase visiting nurses' competency of costing and enhance efficiencies of visiting nursing centers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.