• Title/Summary/Keyword: Cost Estimation Process

Search Result 372, Processing Time 0.03 seconds

Improvement of Software Cost Estimation Guideline Using OLAP Multidimensional Model (OLAP 다차원 모델을 이용한 소프트웨어 사업대가기준의 개선)

  • Park, Hye-Ja;Hwang, In-Soo;Kwon, Ki-Tae
    • Journal of Information Technology Services
    • /
    • v.11 no.1
    • /
    • pp.197-210
    • /
    • 2012
  • This paper presents the ways that can improve the Software Cost Estimation Guidelines in order to replace those that are expected to be abolished at February, 2012, and solve the problems that are being occurred in the current Software Cost Estimation Guidelines. By using multidimensional modeling of OLAP(On-Line Analytical Processing), this paper does three dimensional modeling that considers the product/service view, process view and skill view. Also, it presents the identification method of cost estimation data through the view of each dimension. Furthermore, it defines the software cost estimation process and adapts them into the bottom up estimation and the top down estimation. Finally, it proposes the access of cost estimation data by the multidimensional analysis of OLAP.

Software Cost Estimation Considering Acquisition Process (획득 프로세스를 고려한 소프트웨어 비용 산정방안)

  • Song Young-Il;Lee Gil-Sup
    • The Journal of Information Systems
    • /
    • v.14 no.2
    • /
    • pp.173-189
    • /
    • 2005
  • Recently, Korean software industry has enjoyed fast growth, thus phenomenon drew attention to the need for more precise and standardized cost estimation system for software development. However, many obstacles exist in achieving a more precise and universally applicable cost measurement. These obstacles include : (1) the intangible nature of intellectual efforts, (2) lack of cost standards, (3) lack of quantitative yardstick to determine the potential complication, (4) lack of both cost monitoring during development and coordinating between acquisition process and cost estimation. The purpose of this study is to facilitate software development cost estimation considering acquisition process that will meet korean user's needs, and to create better models that will be cost for software development particularly for Korean environment.

  • PDF

A Study on 3D Data Model Development by Normalizing and Method of its Effective Use - Focused on Building Interior Construction - (정규화를 통한 3차원 데이터 모델 구축 및 활용성 향상 방안 연구 -건축 마감 공사 중심으로 -)

  • Lee, Myoung-Hoon;Ham, Nam-Hyuk;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.11-18
    • /
    • 2010
  • Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.

A Bit of Factory Automation : Manufacturing Cost Estimation Using Group Technology (공장 자동화에 관한 소고 : 그룹 테크놀로지를 이용한 생산원가 추정)

  • Lee, Sung-Youl
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.15 no.2
    • /
    • pp.77-86
    • /
    • 1989
  • A fully automated cost estimation system(FACES) has been developed. Since speed, accuracy, and consistency are essential factors in automating a cost estimation, the use of computers in cost estimation system(CES) has grown rapidly in the last few years. FACES is a micro computer based cost estimation system that employs a manufacturing knowledge base. A Group Technology(GT) based part classification and coding(C&C) scheme is used to automate the process planning aspects of cost estimation. Variant process planning methods are employed to generate workstation routings from form features of the part. The system has been tested for an assembly of six machined parts. Results indicate that the system could provide a substantial improvement in accuracy, productivity, and performance over the more traditional full dialog approach to cost estimation. It also provides a good foundation for a factory automation by using a common GT based database through design to production.

  • PDF

A Study on Safety Cos Estimation Using Process Risk Assessment for Polyol Process (polyol공정에 대한 위험성 평가에 의한 안저비용 산정에 관한 연구)

  • Lee, Jun-Suk;Lee, Young-Soon;Park, Young-Ku
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.1
    • /
    • pp.68-71
    • /
    • 2002
  • A research on accident loss calculation for polyol process without safety management activities, and safety cost estimation using process risk assessment has been implemented. In order to estimate a magnitude of loss, accident scenarios were made by combining result made from HAZOP Study method with accident possibility analysis results implemented with FTA. Also effect assessment was implement for accident consequence of each scenario. And minimum possible loss cost has been calculated when safety investment do or not. Result from cost-benefit analysis was shown as approximately \335 billion(=USS44,000 billion), as cost after subtracting safety management cost from minimum possible loss cost.

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

Development of SWRO-PRO hybrid process simulation and cost estimation program (역삼투-압력지연삼투 조합공정 공정모사 및 비용예측 프로그램 개발)

  • Choi, Yongjun;Shin, Yonghyun;Lee, Sangho;Kim, Seung-Hyun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.3
    • /
    • pp.299-312
    • /
    • 2016
  • The main objective of this paper is to develop computer simulation program for performance evaluation and cost estimation of a reverse osmosis (RO) and pressure-retarded osmosis (PRO) hybrid process to propose guidelines for its economic competitiveness use in the field. A solution-diffusion model modified with film theory and a simple cost model was applied to the simulation program. Using the simulation program, the effects of various factors, including the Operating conditions, membrane properties, and cost parameters on the RO and RO-PRO hybrid process performance and cost were examined. The simulation results showed that the RO-PRO hybrid process can be economically competitive with the RO process when electricity cost is more than 0.2 $/kWh, the PRO membrane cost is same as RO membrane cost, the power density is more than $8W/m^2$ and PRO recovery is same as 1/(1-RO recovery).

The Development of an Product Cost Estimation System at the Product Design Stage (제품 설계 단계에서의 제품 원가 추정 시스템 개발)

  • 한관희;박찬우;이규봉;황태일;김강용
    • Korean Journal of Computational Design and Engineering
    • /
    • v.8 no.2
    • /
    • pp.101-108
    • /
    • 2003
  • Presented in this paper is the development of an product cost estimation system at the product design stage. The efficient cost estimation function at the design stage is essential for the cost reduction activities through the entire product life cycle. For this purpose, it is necessary to establish a systematic working procedure, and to develop information system for managing a great deal of production and product-related data required for the cost estimation. The developed system has the capability of estimating a cost of assembly type products as well as unit-item type products. As proposed system is based on the variant approach, it can be used easily at an early design stage without the need for detail design information. Also, this system is integrated with legacy PDM (Product Data Management) and ERP (Enterprise Resource Planning) system for fast. accurate and easy product cost estimation. The estimated cost includes material cost, overhead cost as well as labor cost.

Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System (건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.170-181
    • /
    • 2008
  • Cost of construction project have to be estimated based on drawing before execution. Cost estimate and check would be performed numerously for preparing general outline of requirements and determining the budget at conceptual planning stage, for obtaining decision on every matter related to design, specification, construction and cost at design stage, and for predicting bidding cost. Thus, importance of cost estimation cannot emphasize too much in construction. However, there are lack of standard estimation method, process, and cost analysis method, that square foot estimation method is as used as eyer, in Korea. Thus, This research present the direction for improving cost estimation and management in construction; It is demanded that establishing standard data base methodology, multi-level database model CUBE, and standard cost planning process, choosing cost estimation methodology according to objectives and cost planning process, and making more experts.

Cost Estimation System for Design Evalution (설계평가를 위한 제조비용산정 시스템)

  • 박홍석;이규봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.281-284
    • /
    • 2000
  • For estimation manufacturing cost during the early design stage, desingers have to know compositon of manufacturmg cost. Manufacturing cost is summalion of material cost and processmg cost. To be able to control the manufacturmg cost, it is necessary to estimate the costs adequately and to store the cost data in a generic way. a generic system, which is the basis for the control of the production costs, takes into account geometric information, material information, process information and production planning information Manufacturing cost is summation of material cost and processing cost.

  • PDF