• 제목/요약/키워드: Cost Estimating

검색결과 929건 처리시간 0.028초

수리부속비 비용추정식 개발과 활용방안 (Development and Application of the Spare-parts Cost Estimating Relationships)

  • 류민규;이용복;강성진
    • 한국군사과학기술학회지
    • /
    • 제13권4호
    • /
    • pp.601-611
    • /
    • 2010
  • Currently, a life cycle cost estimates(LCCE) is the most important factor in weapon system acquisition process. However, operation and maintenance(O&M) cost related studies are insufficient from the previous literature survey. O&M cost consists of various cost factors such a man power, maintenance and direct & indirect support costs. We have known that spare-parts cost is a key factor in the O&M cost. In this paper, we developed the spare-parts cost estimating relationships(CERs) of fixed-wing aircraft and armored vehicle weapon systems which include 4 historical cost drivers ; system acquisition cost, deterioration rate, localization rate, mission characteristic. Furthermore, we proposed the application methodologies that O&M cost estimating, total life cycle cost estimating and determination of the economic life using the spare-parts CERs.

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발 (A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House)

  • Lee, Yang Kyu;Park, Hong Tae
    • 한국재난정보학회 논문집
    • /
    • 제10권1호
    • /
    • pp.15-24
    • /
    • 2014
  • 본 연구는 설계 과정의 분해, 시공 과정의 조립, 공사비 적산 등 공사의 계획과 관리에 걸친 모든 공사 관리의 업무를 체계화할 수 있는 공동주택의 공사정보분류체계를 제시하였다. 또한, 본 연구는 이 공사정보분류체계를 작업순서에 따라 관계형 데이터베이스(Data Base)로 구축 방법을 제시하였고, 구축된 데이터베이스를 근거로 적산 자동화 시스템 개념 모형을 구축하였다. 이러한 적산 자동화 시스템 개념 모형은 기존 적산 시스템들의 근본적인 문제점이었던 부적절함을 해소하여 공동주택 건설현장에서 효과적으로 적용가능한 과학적인 적산 시스템으로 활용할 수 있을 것이다.

PRICE 모델을 이용한 K1전차 수명주기 비용추정 (K-1 Tank Life Cycle Cost Estimate Using PRICE Model)

  • 강창호;강성진
    • 한국국방경영분석학회지
    • /
    • 제25권2호
    • /
    • pp.44-61
    • /
    • 1999
  • Cost estimation has posed a significant challenge to estimators, planners, and managers in both government and military. Considerable historical evidence shows that accurate cost estimation has been difficult to achieve across a wide range of projects, including weapon systems. This paper introduces new cost estimating concept, CAIV(Cost As an Independent Variable) and a cost estimating case study using PRICE model, computer aided parametric estimating models(CAPE) for K1 tank cost estimate. CAIV concept is to set realistic but aggressive cost objectives easily in each acquisition program and to achieve cost, schedule, and performance objectives considering various managing risks with a project manager and industry teams. The Price model is one of computer aided cost estimating models and widely used in U.S. defense system analysis as a tool for CAIV. We analyze theories, inputs, outputs of the PRICE model and present a case study for K1 tank to estimate costs in requirement and concept phase, program and budgeting phase, and life cycle phase. Finally we obtain results that the Price model can be used in various phases of PPBEES depending upon available data and time.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

비용추정방법을 활용한 시스템요구사항 적정성 확인방안 연구 (Study on validating proper System Requirements by using Cost Estimations Methodology)

  • 최성규;최은하
    • 융합보안논문지
    • /
    • 제13권5호
    • /
    • pp.97-105
    • /
    • 2013
  • 국가에서 추진하는 모든 프로젝트는 예산이라는 변수에 영향이 크다. 정확한 소요예산 판단불가로 프로젝트 추진 중에 추가적인 예산소요가 발생하여 사업의 중단 혹은 재검토 사례가 빈번히 발생하고 있다. 이는 프로젝트 소요제기단계 및 이를 획득하기 위한 선행연구단계에 제시된 시스템요구사항의 평가와 소요예산의 부정확성으로 기인한다고 평가된다. 시스템요구사항은 사용자가 작성하는 사용자 요구사항과 구별하여 사용자 요구사항을 바탕으로 획득조직에서 시스템의 기술적 요구사항으로 전환하는 것을 말하며 획득조직과 개발자 혹은 제작자 사이에 의사소통을 위한 것이다. 시스템 요구사항 수준은 프로젝트 규모를 결정하는데 중요한 요소로, 시스템요구사항에 대한 비용측면의 적정성 확인은 필수적이다. 그러나 프로젝트 비용요소가 복잡하고 각 요소별로 기준이 상이하여 비용추정이 쉽지 않고 추정된 비용의 오차율도 커서 활용에 어려움이 있었으며, 특히 시스템요구사항을 도출하는 프로젝트 초기단계에는 프로젝트와 관련된 세부자료의 부족으로 비용추정에 어려움이 있었다. 본 연구에서는 요구공학과 비용추정방법에 대한 이론적인 근거를 바탕으로 시스템요구사항 도출 후 비용추정방법을 활용하여 적정성을 검증하고 대안을 비교 후 최적안을 선정하는 아키텍처를 솔루션으로 제시하였고, 이를 위하여 활용 가능한 모수비용추정방법(Parametric Cost Estimating)를 토대로한 비용추정 전산도구인 SEER Cost-IQ를 소개하였다.

영향변수에 따른 수량변화 분석을 이용한 기본설계단계의 개산견적 모델 개발 (Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase)

  • 손보식;이현수;김성태
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.155-166
    • /
    • 2007
  • 본 연구는 건축공사 프로젝트의 기본 설계 단계에서의 개산견적 개념모델을 제안하고, 제안된 개산견적 개념을 적용하여 실제 주상복합 건물 프로젝트의 실적자료의 분석을 바탕으로 한 프로토타입 개발을 목적으로 한다. 국내의 건설산업은 급격한 시장 변화와 경쟁 심화의 과정을 겪고 있다. 특히 프로젝트의 조달 방식의 변화와 함께 입찰과 관련한 정보가 부족한 사업초기, 기본설계 단계에서 중요한 의사 결정이 이루어지며, 이러한 의사 결정의 기준이 되는 개산 견적의 중요성이 더욱 증가 되고 있다. 따라서 본 연구에서는 기존의 개산견적 방법을 분석하고 그것을 보완할 수 있는 공사 수량 변화 분석에 기반 한 개산견적 방법을 제안하고 프로토타입을 구축하였다. 또한, 이 연구에서는 기존의 공종별 공사비 분류체계에 빌딩구성요소(BE)별 및 층별 수량 분류를 추가하고 있다. 이러한 개념을 바탕으로 제안 모델을 Q-BASE (Quantity Based Active Schematic Estimating) 모델로 정의하였다.

건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 - (Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project -)

  • 김수민;조재호;이종식;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.212-215
    • /
    • 2008
  • 건축공사의 공사비 절감은 시공단계보다 사업초기단계 및 설계단계에서 정확한 공사비 예측을 함으로써 더욱 효율적으로 절감될 수 있다. 하지만 현행 공공 건설공사의 공사비 산정 및 관리는 실시설계 이후로 집중되어 있어, 계산견적을 중심으로 실시되는 기획 및 기본설계단계에서의 사업비관리는 매우 취약하다고 볼 수 있다. 이에 본 연구에서는 현행 공사비 산정 방법의 문제점 및 실적공사비 사례정보 분석하여 기본설계단계에서 구체적 비용 계획을 세우고 이에 부합되는 설계가 진행되는지 검토 가능한 공사비 산정모델 개발을 위한 예비적 연구를 수행하였다.

  • PDF

대·소규모 토목공사의 실적공사비 비교 분석 (Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works)

  • 홍성호;신주열;김창학;이동욱
    • 대한토목학회논문집
    • /
    • 제33권4호
    • /
    • pp.1707-1718
    • /
    • 2013
  • 실적공사비 제도는 2004년부터 도입된 제도로서, 과거의 유사 공사의 계약단가를 토대로 공종별 단가를 파악하여 예정가격을 결정하는 방식이다. 이러한 실적공사비 단가는 매년 2회 한국건설기술연구원에서 발표하고 있다. 소규모 공사의 공사비 단가는 작업단위당 생산비용 증가, 장비 및 노무비 등 상승으로 인해 대규모 공사보다 높을 수밖에 없는 것이 건설공사의 특성이다. 그러나 실적공사비 단가가 공사의 규모와 무관하게 일률적으로 적용되고 있어 문제점으로 대두되고 있다. 본 연구에서는 이러한 실적공사비 제도의 문제점을 파악하기 위해서 대 소규모 토목공사의 실적공사비를 비교 분석하였으며, 소규모 토목공사의 실적공사비가 대규모 토목공사에 비해 21.8% 높은 결과가 도출되었다.