• Title/Summary/Keyword: Cost Based Scheduling

Search Result 247, Processing Time 0.026 seconds

SCTTS: Scalable Cost-Time Trade-off Scheduling for Workflow Application in Grids

  • Khajehvand, Vahid;Pedram, Hossein;Zandieh, Mostafa
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.7 no.12
    • /
    • pp.3096-3117
    • /
    • 2013
  • To execute the performance driven Grid applications, an effective and scalable workflow scheduling is seen as an essential. To optimize cost & makespan, in this paper, we propose a Scalable Cost-Time Trade-off (SCTT) model for scheduling workflow tasks. We have developed a heuristic algorithm known as Scalable Cost-Time Trade-off Scheduling (SCTTS) with a lower runtime complexity based on the proposed SCTT model. We have compared the performance of our proposed approach with other heuristic and meta-heuristic based scheduling strategies using simulations. The results show that the proposed approach improves performance and scalability with different workflow sizes, task parallelism and heterogeneous resources. This method, therefore, outperforms other methods.

Cost-Based Directed Scheduling : Part I, An Intra-Job Cost Propagation Algorithm (비용기반 스케쥴링 : Part I, 작업내 비용 전파알고리즘)

  • Kim, Jae-Kyeong;Suh, Min-Soo
    • Journal of Intelligence and Information Systems
    • /
    • v.13 no.4
    • /
    • pp.121-135
    • /
    • 2007
  • Constraint directed scheduling techniques, representing problem constraints explicitly and constructing schedules by constrained heuristic search, have been successfully applied to real world scheduling problems that require satisfying a wide variety of constraints. However, there has been little basic research on the representation and optimization of the objective value of a schedule in the constraint directed scheduling literature. In particular, the cost objective is very crucial for enterprise decision making to analyze the effects of alternative business plans not only from operational shop floor scheduling but also through strategic resource planning. This paper aims to explicitly represent and optimize the total cost of a schedule including the tardiness and inventory costs while satisfying non-relaxable constraints such as resource capacity and temporal constraints. Within the cost based scheduling framework, a cost propagation algorithm is presented to update cost information throughout temporal constraints within the same job.

  • PDF

Cost-Based Directed Scheduling : Part II, An Inter-Job Cost Propagation Algorithm (비용기반 스케줄링 : Part II, 작업간 비용 전파 알고리즘)

  • Suh, Min-Soo;Kim, Jae-Kyeong
    • Journal of Intelligence and Information Systems
    • /
    • v.14 no.1
    • /
    • pp.117-129
    • /
    • 2008
  • The cost-based scheduling work has been done in both the Operations Research (OR) and Artificial Intelligence (AI) literature. To deal with more realistic problems, AI-based heuristic scheduling approach with non-regular performance measures has been studied. However, there has been little research effort to develop a full inter-job cost propagation algorithm (CPA) for different jobs having multiple downstream and upstream activities. Without such a CPA, decision-making in scheduling heuristics relies upon local, incomplete cost information, resulting in poor schedule performance from the overall cost minimizing objective. For such a purpose, we need two types of CPAs : intra-job CPA and inter-job CPA. Whenever there is a change in cost information of an activity in a job in the process of scheduling, the intra-job CPA updates cost curves of other activities connected through temporal constraints within the same job. The inter-job CPA extends cost propagation into other jobs connected through precedence relationships. By utilizing the cost information provided by CPAs, we propose cost-based scheduling heuristics that attempt to minimize the total schedule cost. This paper develops inter-job CPAs that create and update cost curves of each activity in each search state, and propagate cost information throughout a whole network of temporal constraints. Also we propose various cost-based scheduling heuristics that attempt to minimize the total schedule cost by utilizing the cost propagation algorithm.

  • PDF

Optimum Scheduling Algorithm for Job Sequence, Common Due Date Assignment and Makespan to Minimize Total Costs for Multijob in Multimachine Systems (다수(多数) 기계(機械)의 총비용(總費用)을 최소화(最小化)하는 최적작업순서, 공통납기일 및 작업완료일 결정을 위한 일정계획(日程計劃))

  • No, In-Gyu;Kim, Sang-Cheol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.12 no.1
    • /
    • pp.1-11
    • /
    • 1986
  • This research is concerned with n jobs, m parallel identical machines scheduling problem in which all jobs have a common due date. The objective of the research is to develop an optimum scheduling algorithm for determining an optimal job sequence, the optimal value of the common due date and the minimum makespan to minimize total cost. The total cost is based on the common due date cost, the earliness cost, the tardiness cost and the flow time cost of each job in the selected sequence. The optimum scheduling algorithm is developed. A numerical example is given to illustrate the scheduling algorithm.

  • PDF

Group Building Based Power Consumption Scheduling for the Electricity Cost Minimization with Peak Load Reduction

  • Oh, Eunsung;Park, Jong-Bae;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1843-1850
    • /
    • 2014
  • In this paper, we investigate a group building based power consumption scheduling to minimize the electricity cost. We consider the demand shift to reduce the peak load and suggest the compensation function reflecting the relationship between the change of the building demand and the occupants' comfort. Using that, the electricity cost minimization problem satisfied the convexity is formulated, and the optimal power consumption scheduling algorithm is proposed based on the iterative method. Extensive simulations show that the proposed algorithm achieves the group management gain compared to the individual building operation by increasing the degree of freedom for the operation.

Efficient Duplication Based Task Scheduling with Communication Cost in Heterogeneous Systems (이질 시스템에서 통신 시간을 고려한 효율적인 복제 기반 태스크 스케줄링)

  • Yoon, Wan-Oh;Baek, Jueng-Kuy;Shin, Kwang-Sik;Cheong, Jin-Ha;Choi, Sang-Bang
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.3C
    • /
    • pp.219-233
    • /
    • 2008
  • Optimal scheduling of parallel tasks with some precedence relationship, onto a parallel machine is known to be NP-complete. The complexity of the problem increases when task scheduling is to be done in a heterogeneous environment, where the processors in the network may not be identical and take different amounts of time to execute the same task. This paper introduces a Duplication based Task Scheduling with Communication Cost in Heterogeneous Systems (DTSC), which provides optimal results for applications represented by Directed Acyclic Graphs (DAGs), provided a simple set of conditions on task computation and network communication time could be satisfied. Results from an extensive simulation show significant performance improvement from the proposed techniques over the Task duplication-based scheduling Algorithm for Network of Heterogeneous systems(TANH) and General Dynamic Level(GDL) scheduling algorithm.

Survey of Evolutionary Algorithms in Advanced Planning and Scheduling

  • Gen, Mitsuo;Zhang, Wenqiang;Lin, Lin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.1
    • /
    • pp.15-39
    • /
    • 2009
  • Advanced planning and scheduling (APS) refers to a manufacturing management process by which raw materials and production capacity are optimally allocated to meet demand. APS is especially well-suited to environments where simpler planning methods cannot adequately address complex trade-offs between competing priorities. However, most scheduling problems of APS in the real world face both inevitable constraints such as due date, capability, transportation cost, set up cost and available resources. In this survey paper, we address three crucial issues in APS, including basic scheduling model, job-shop scheduling (JSP), assembly line balancing (ALB) model, and integrated scheduling models for manufacturing and logistics. Several evolutionary algorithms which adapt to the problems are surveyed and proposed; some test instances based on the practical problems demonstrate the effectiveness and efficiency of evolutionary approaches.

Improvement of Optimal Bus Scheduling Model Reflecting Bus Passenger's Degree of Satisfaction (이용자 만족도를 반영한 최적 버스 배차 간격 설정 모형의 개발)

  • Bae, Sang-Hoon;Kim, Tag-Young;Ryu, Byung-Yong
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.6 no.3
    • /
    • pp.12-23
    • /
    • 2007
  • The purpose of this studγ if to understand problem of present bus scheduling system and to develop optimal bus scheduling model which improve bus passenger's degree of satisfaction(DOS) and bus company's operation efficiency at the same time. This study developed optimal bus scheduling model, which reflected bus passenger's degree of satisfaction(DOS), applied to existing model that summery of bus operation cost($C_o$), passenger queuing time cost($C_{pw}$) and passenger travel time cost($C_{pl}$). And optimal bus scheduling model which developed in this study is optimized that using LINGO program based on linear program. Also by using the general case in Busan, compare total cost of present bus scheduling system and existing scheduling model with total cost of optimal bus scheduling model which reflected bus passenger's degree of satisfaction(DOS).

  • PDF

On the Multi-Stage Group Scheduling with Dependent Setup Time (종속적 준비시간을 갖는 다단계 그룹가공 생산시스템에서의 그룹스케듈링에 관한 연구)

  • 황문영
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.31
    • /
    • pp.115-123
    • /
    • 1994
  • Group scheduling, which is a kind of operations scheduling based on the GT concept is analyzed in a multi-stage manufacturing system. The purpose of this research is to develop and evaluate a heuristic algorithm for determining gro up sequence and job sequence within each group to minimize a complex cost function, i.e. the sum of the total pe-nalty cost for tardiness and the total holding cost for flow time, in a multi-stage manufacturing system with group setup time dependent upon group sequence. A heuristic algorithm for group sc heduling is developed, and a numerical example is illustrated. For the evaluation of the pro-posed heuristic algorithm, the heuristic solution of each of 63 problems is compared with that of random scheduling. The result shows that the proposed heuristic algorithm provides better solution in light of the proposed cost function.

  • PDF

Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF