• Title/Summary/Keyword: Control schedule

Search Result 622, Processing Time 0.026 seconds

An Improvement Study on National Fire Safety Code of Sprinkler System for Hydraulic Calculation Application (수리계산 적용을 위한 스프링클러설비의 화재안전기준 개선방안 연구)

  • Lee, Keun-Oh;Kang, Joo-Hyeong
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.1 s.79
    • /
    • pp.7-12
    • /
    • 2007
  • There are two kinds of design process for sprinkler system. one is pipe schedule system and the other is hydraulically designed system. We have inefficient results when we design by hydraulically designed system because the design process for sprinkler system is restricted by domestic fire code. Therefore, it is essential to do an introduction of hydraulically designed system which is based on engineering for enhancing reliability and efficiency of sprinkler system. This study presents points at issue by comparing and studying design standards of sprinkler system from Korea, Japan and NFPA, and presents improvement plans of national fire safety code of sprinkler system by processing, comparing and analyzing designs according to piping schedule and hydraulically designed system about domestic objects. Installation standards of sprinkler system have to be applied not by object buildings but by hazard classification. It is hard to design an efficient sprinkler system for fire control when water supply requirement of sprinkler systems allocated according to a size of a building because the same purpose but other buildings may request more water requirement or less. We should sublate the pipe schedule system from national fire safety code and need to introduce the hydraulically designed system. The pipe schedule system presents easy access because it is based on the forecasted engineering calculations but it is applied to only small buildings like NFPA due to its low reliability.

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

Design and Implementation of Mathematical Model based Hierarchical Conflict Detection and Resolution (수리모형 기반의 계층적 열차경합관리 설계 및 구현)

  • Kim, Kyung-Min;Hong, Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.687-694
    • /
    • 2008
  • Given the daily tactical schedule, the purpose of the traffic management system is to develop operating plan that will achieve the stated schedule as best as possible. The operating plan has to be modified during the day because of occurring disturbance(e.g. delay, infrastructure breakdown, etc.) Conflict detection and resolution(CDRS) are aimed for adjusting the distorted schedule to tactical schedule. Our research separate CDRS into two hierarchy modules, line conflict control module and station conflict control module. We define the role of each modules and design the cooperative architecture. We suggest the conflict detection and resolution approach based on mathematical model. These results can be implemented as prototype modules.

  • PDF

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

Recent Change in the Fertility Pattern in Korea

  • Rhee, Hong-Joon
    • Journal of the Korean Statistical Society
    • /
    • v.5 no.2
    • /
    • pp.119-127
    • /
    • 1976
  • By examining Table 1, it is confirmed that the two model fertility scheduels for 1960 and 1975 are close agreement with the census data in Korea. The declines of age-specific fertility are more remarkable among older women than among younger, as exhibited in Table 3 and Fig. 2. A merit of this fitted model schedule as compared to fitted conventional frequency distributions such as the Pearson Type III curve, is that the model schedule incorporates combinations of intuitively understandable demographic factors. The value of m, a measure of fertility control, increased remarkably from 0.531 in 1960 to 2.429 in 1975. Considering the fact that the average value of m for forty-three schedules shown in the 1965 Demographic Yearbook was 1.0, and the value of m in England and Wales for 1965 was 1.91, the recent level of fertility control in Korea may be considered higher than generally believed.

  • PDF

Influence Factors and Management based on Phase of Building Construction for the Improvement of Post Occupancy Indoor Air Quality

  • Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.576-586
    • /
    • 2011
  • In recent years, pollution in residential spaces has been a significant area of concern. In particular, the indoor air quality (IAQ) of an apartment building before occupancy, which is related to the interior material, is a serious problem. Unlike previous research, which has mainly focused on pollution control after construction, this study has derived influencing factors and priority of management with a controlling schedule for IAQ. The objectives of this research are 1) control of schedule or improvement of management for IAQ, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall?based apartment buildings and in column?based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

Analysis of Environment Control Capability Wintering Beehouse in Young Area (용인지역 저온양봉사의 환경조절성능 분석(농업시설))

  • 이석건;김란숙;이현우;이종원
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.302-307
    • /
    • 2000
  • The wintering honey bee chambers were constructed and inside environment factors were analyzed to provide high technology for efficient wintering of honeybee colonies. As a result of this study, inside air temperature of yongin chamber under the wide range of outside temperature condition was found to be appropriated for wintering of bee, and inside temperature of beehive was about 2$^{\circ}C$ higher than the air temperature in the chamber. The fan operation schedule did not control the high temperature down properly in the chamber, It was necessary to find a new fan operation schedule to be able to provide the optimum temperature for wintering honey bee colonies. inside humidity variation of Yongin chamber was very much depended on outside humidity.

  • PDF

A Heuristic Approach to the Shift-scheduling Considering the Balance of Work-load in Nuclear Power Plants (호텔 요리사의 인간공학적 작업 위험성 평가)

  • Kim, Dae-Ho;Yun, Young-Su;Lee, Yong-Hee
    • Journal of the Ergonomics Society of Korea
    • /
    • v.25 no.4
    • /
    • pp.1-7
    • /
    • 2006
  • The purpose of this study is to develop an efficient algorithm for the management of the shift schedule in nuclear power plants in consideration with the ergonomic criteria and the regulatory codes. The ergonomic criteria considered are the work hours, overtime-work frequency and working time, start and finishing time of works, allocation of rest times and duty-offs, rotating of shifts, etc. to comply with the regulations such as the Labor Standard Act, the ILO Convention No. 171, 178, "the detailed content of a periodic safety review," enforcement regulations 19-2 of the Atomic Energy Act. The developed algorithm for the shift schedule program adopts a heuristic method to minimize the difference the workload for shift workers in nuclear power plants.

Algorithm or Parallel Computation for a multi-CPU controlled Robot Manipulator (복수의 CPU로 제어되는 매니퓰레이터의 병렬계산 알고리즘)

  • Woo, Kwang-Bang;Kim, Hyun-Ki;Choi, Gyoo-Suck
    • Proceedings of the KIEE Conference
    • /
    • 1987.07a
    • /
    • pp.288-292
    • /
    • 1987
  • The purpose of this paper is to develope the parallel computation algorithm that enables it to minimize the completion tine of computation execution of the entire subtasks, under the constraints of the series-parallel precedence relation in each subtask. The developed algorithm was applied to the control of a robot manipulator functioned by multi-CPU's and to obtain the minimum time schedule so that real time control may be achieved. The completion time of computation execution was minimized by applying "Variable" Branch and Bound algorithm which was developed In this paper in determining the optimum ordered schedule for each CPU.

  • PDF

Nanostructure Ceramics of Silicon Nitride Produced by Spark Plasma Sintering

  • Hojo, Junichi;Hotta, Mikinori
    • Proceedings of the Korean Powder Metallurgy Institute Conference
    • /
    • 2006.09a
    • /
    • pp.323-324
    • /
    • 2006
  • The nanostructure control of $Si_3N_4$ ceramics can be achieved by using fine starting powder and retardation of grain growth. The spark plasma sintering technique is useful to retard the grain growth by rapid heating. In the present work, the change of microstructure was investigated with emphasis on the particle size of starting powder, the amount of sintering additive and the heating schedule. The rapid heating by spark plasma sintering gave the fine microstructure consisting of equiaxed grains with the same size as starting particles. The spark plasma sintering of $Si_3N_4$ fine powder was effective to control the microstrucutre on nano-meter level.

  • PDF