• Title/Summary/Keyword: Control schedule

Search Result 622, Processing Time 0.025 seconds

Dynamic Developmental Factors and their Problem Solving of Patients that Abuse Marihuana (마리화나 남용환자의 역동적인 발달요인과 문제해결)

  • 원정숙
    • Journal of Korean Academy of Nursing
    • /
    • v.4 no.3
    • /
    • pp.105-116
    • /
    • 1974
  • This study was made on patients who were Hospitalized due to sickness caused by the abuse of marihuana at the Psychiatric Section of a hospital during the period from Feb. to Oct., 1974. The following conclusion was obtained by reviewing the literature with respect to the nursing, and problem solving of those patients. 1. It appears that marihuana is a comparatively mild intoxicant in ordinary preparation without causing physical dependence or tolerance. 2. According to the status of men who are marihuana smokers, approximately 20% of them were college students, those preparing to retake college entrance examinations, non-employed and pharmacists. The men belong mostly to the middle foreigner′s mistress of higher, income bracket, and in the case of women, most of the smokers were US. servicemen entertainers. 3. Dynamic developmental factors: Case 1. : The patient had a characteristic, hysterical and emotionally unitable character, and was of low intelligence, In addition, to this already existing problem, the added uses of marihuana caused a mental illness to develope. Case 2 : The character, was reserved and introspective, her creative power and sentiment was fading and his ability of self-control was weakened. She used the smoking of marihuana to get rid of her own feeling of inferiority complex and tensions coming from interpersonal relationships. Case 3 : The patient was unconditionally resistive to the authoritativeness of superiors and irresponsible in his relationship with women, in his attitude concerning sex in general. He smoked marihuana because he felt become peace-loving and get enchanted experience through smoking it. 4. The points of issue appearing from the above case; (1) Movement of anti-social feelings against the "established system" by the youngsters. (2) Family problem. (3) Shamelessness, loss of motivation, disorderly attitude toward the sex, (4) Worries concerning the future. (5) Lack of knowledge concerning smoking of cigarette and marihuana. Chronic use of marihuana made, those youngman who had originally been ambitions to achieve something in life, lazy, inefficient, unable to make long-term plans, are such weak mined persons that they did not try to overcome problems when encountered. This will pose a great and important question in the mental health of the society, 5. Treatment and Problem sieving According to the literature, we will have to place importance upon hospitalized treatment The phases of treatment were divided into five parts. (1) Prehospital phase (2) Withdrawal Phase (3) Rehabilitation phase (4) Transitional phase (5) After-care phase The experiments have proved that there was much progress in the recovery of patients through environment therapy, supportive therapy and group psychotherapy. This was the above mentioned 5 phases of treating process in accordance with the weekly schedule of the hospital. It was thought that the patients would require prolonged after care management even after they were released from the hospital and that they will also require periodic visit, to the hospital and doctor′s interview with their family. In conclusion, the question of the young generation and marihuana smoking is becoming a great social problem in which their resistances to the "established system" and society is growing in the from of antiestablishment movements. In our country, the smoking of marihuana is gradually developing, therefore, I think, that it would be a very fortunate thing for us, if this report could be helpful for the motivation of further study on the questions of the young generation and its problems.

  • PDF

Immunogenicity and Safety of a Two Doses of Hepatitis A Vaccine(VAQTATM) in Healthy Children and Adolescents (건강한 소아와 청소년에 대한 A형 간염(VAQTATM) 2회 접종시 면역원성 및 안전성에 대한 연구)

  • Lee, Jin Soo;Park, Ji Ho;Sohn, Young Mo
    • Pediatric Infection and Vaccine
    • /
    • v.8 no.2
    • /
    • pp.160-167
    • /
    • 2001
  • Purpose : To assess the immunogenicity, safety, and tolerability of hepatitis A vaccine ($VAQTA^{TM}$) in healthy children and adolescents. Methods : Eligible subjects aged 2 to 17 years received 25 U/0.5 mL of $VAQTA^{TM}$ intramuscularly at 0 and 24 week schedule. Bleeds were obtained prior to vaccination and 4 weeks after the second dose to ascertain serostatus. To detect antibody to HAV after vaccination with an inactivated HA vaccine, a modification of the $Abbott^{(R)}$ HAVAB kit was used. Sample with titers ${\geq}10$ mIU/mL were considered seroconverted. Adverse experiences were monitored. Results : 102 subjects(54 male, 48 female) were enrolled. The mean age was $6.8{\pm}3.5$ years. Two subjects were seropositive, two were lost of follow up. 88 subjects were available for a per protocol analysis and 90 for all subjects with serology after the second dose, and ten withdral. All subjects(95% CI, 94.8~100) seroconverted. Geometric mean titers was 7,991.1(95% CI, 6,481.1~9,852.7) with very little difference in per protocol analysis and all subjects analysis. Adverse experiences to $VAQTA^{TM}$ were generally mild and transient. Conclusion : The pediatric two-dose regimen of $VAQTA^{TM}$ was found to be highly immunogenic, generally well tolerated and resulted in 100% seroconversion. Regarding Korea is in transition from a high to low risk region resulting in a paradox increase of clinical disease and disease burden, routine vaccination should be considered in order to control hepatitis A effectively.

  • PDF

Result of Radiotherapy for Esophagus Cancer (식도암의 방사선 치료 결과)

  • Jung Taesig;Moon Changwoo;Yum Hayong;Yang Chilyong
    • Radiation Oncology Journal
    • /
    • v.6 no.2
    • /
    • pp.211-226
    • /
    • 1988
  • Among 165 patients of esophagus cancer treated by either radiation alone or postoperative radiation, median survival period was 6.6 months, $16\%$ 3 years and $8\%$ 5years crude survival. In biphasic plotting of survival curve semilogarithmically all nonresponder died within one year regardless of treatments and in responder each 1, 2, 3 years survival rate was $80\%,\;70\%,\;60\%$ in the group of postoperative radiation among 20 patients ($54\%$ of 37 patients) respectively and $62\%,\;38\%,\; 23\%$ each in the group of radiation alone among 61 patients ($48\%$ of 128 patients) respectively, better survival rate of postoperative radiation vs radiation alone in 3 year (P<0.01). The most common cause of death was dysphagia $55\%$, and majority of patients died by failure to control the disease locally $62\%,\;88\%$ of stricture were associated with persistenece of cancer in esophagus. $50\%$ of patients was found to have locoregional metastatc nodes. Preoperative diagnostic failure rate was for metastatic locoregional nodes was $54\%$, for grossly metastatic nodes $29.7\%$, for blood borne organ metastasis $13.5\%$, and for local extent of the disease $14\%$. The residual cancer at surgical margin o. postitive node was not effectively killed by either 5000 to 5500 cGy conventional radiation or 5290 to 5750 cGy with 115 cGy fraction in 2 times daily; hyperfractionated radiation. However hyperfractionation schedule decreased the both acute and late complications in this study.

  • PDF

Fact-finding survey on herbicide use in paddy rice at farmer's level (논 제초제 사용에 대한 농가실태조사)

  • Lee, In-Yong;Park, Jae-Eup;Park, Tae-Seon;Kim, Tae-Wan;Oh, Byung-Youl
    • The Korean Journal of Pesticide Science
    • /
    • v.2 no.2
    • /
    • pp.119-125
    • /
    • 1998
  • A nation-wide fact-finding survey was done to provide the basic information for establishing the rational weed control scheme in paddy rice. A total of 445 respondents including 273 farmers and 172 pesticide dealers was involved in this survey. Dominant weeds in rice paddy field were Echinochloa crus-galli, Eleocharis kuroguwai, Sagittaria pygmaea, Sagittaria trifolia, etc.. Preferred herbicides widely used by farmners were ranked in the following order; butachlor 5GR, pyrazosulfuron-ethyl + molinate 5.07GR, molinate + cinosulfuron 5.08GR, meanwhile, those recommended by pesticide dealers were; pyrazosulfuron-ethyl + molinate 5.07GR, molinate + cinosulfuron 5.08GR, and butachlor 5GR. The guidelines to choose the preferred herbicides was primarily based on the experience, which was occupied about 45%. Approximately 56% of the farmers followed the recommended herbicide dosage and 43% of them applied the herbicides before weed germination (pre-emergence treatment). In addition, most farmers applied herbicides at least two times with systematic application schedule. Application method of granular formulation was broadcasting by hand, while that of sprayable ones was by high-pressure sprayer. Some farmers answered that they had experienced phytotoxicity in the crop by applied herbicides, of which higher experience was observed from the farmers who applied by high-pressure sprayer. It was analyzed significantly that the feasible herbicides to cause phytotoxicity in rice at farmer's level were butachlor 5GR, esprocarb + pyrazosulfuron-ethyl 5.07GR and bensulfuron-methyl + molinate 5.17 GR.

  • PDF

Shared Resource Management Scheme in Advance and Immediate Reservations for Effective Resource Allocation (효율적인 자원 할당을 위한 사전 예약과 즉석 예약 간 공유 자원 관리)

  • 이동훈;김종원
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.7B
    • /
    • pp.685-696
    • /
    • 2004
  • Real-time multimedia applications that require large amount of bandwidth need resource reservation before starting service for providing the QoS(i.e., Quality of Service). To reserve resources in advance, each reservation request has to notify its expectation on the required amount of resources and service duration. Using this information, a resource manager can schedule advance reservations. However, most existing resource management systems are adopting straightforward call admission control process (i.e., only immediate reservation) by checking currently available resources without considering the service duration. Hence, the resource management system that supports advance reservation has to manage confliction caused by indefinite service duration of immediate reservation. Even though the separation of resource pool according to type of reservation can prevent the confliction, it causes low resource utilization. In this paper, we propose an effective resource management scheme that supports both immediate and advance reservations by sharing resources dynamically. Using network cost function, the proposed scheme determines and adaptively adjusts resource boundary according to the confliction rate by varying weight parameters. And also, we define user utility function to quantify user satisfaction based on how well the reserved resource is guaranteed during service time. Simulation results using NS-2 network simulator show that the proposed scheme can achieve better resource utilization with preferable QoS than other schemes like static resource partitioning.

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

A Scheduling Algorithm using The Priority of Broker for Improving The Performance of Semantic Web-based Visual Media Retrieval Framework (분산시각 미디어 검색 프레임워크의 성능향상을 위한 브로커 서버 우선순위를 이용한 라운드 로빈 스케줄링 기법)

  • Shim, Jun-Yong;Won, Jae-Hoon;Kim, Se-Chang;Kim, Jung-Sun
    • Journal of KIISE:Software and Applications
    • /
    • v.35 no.1
    • /
    • pp.22-32
    • /
    • 2008
  • To overcome the weakness of the image retrieval system using the existing Ontology and the distributed image based on the database having a simple structure, HERMES was suggested to ensure the self-control of various image suppliers and support the image retrieval based on semantic, the mentioned framework could not solve the problems which are not considered the deterioration in the capacity and scalability when many users connect to broker server simultaneously. In this paper the tables are written which in the case numerous users connect at the same time to the supply analogous level of services without the deterioration in the capacity installs Broker servers and then measures the performance time of each inner Broker Component through Monitoring System and saved and decides the ranking in saved data. As many Query performances are dispersed into several Servers User inputted from the users Interface with reference to Broker Ranking Table, Load Balancing system improving reliability in capacity is proposed. Through the experiment, the scheduling technique has proved that this schedule is faster than existing techniques.

Analysis of Guidelines and Ordering Cases for BIM Deliverable Delivery System Development in Road Sector (도로분야 BIM 성과품 납품체계 개발을 위한 국내외 지침 및 발주사례 분석)

  • Seo, Myoung-Bae;Kim, Jin-Uk;Choi, Won-Sik;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5897-5905
    • /
    • 2013
  • In spite of advantage by using BIM as quantity take-off, schedule control and clash check, absence of guidelines is a barrier to applying BIM to road domain. In this research, domestic and overseas cases of BIM guideline are analyzed in order to develop the road BIM deliverable submission system. The analysis is classified 5 topics which are BIM submit product list, submit files format, availability of existing 2D based products, BIM authoring tools and submit process. As a result, It needs a lot of effort to standardize BIM delivery system for road domain because BIM submit product list and BIM authoring tools are changable depending on BIM use cases. However, submit files format and submit process are common part to suggest guidelines of road BIM delivery system. It requires to combine BIM and 2D products for road BIM delivery system because delivery products are not exactly alternative 2D based delivery products for the present. The authors expect this research to use as basic data for development of the BIM deliverable submission system in road domain.

Availability Evaluation of Quasi Static RTK Positioning for Construction of High Rise Buildings and Civil Structures (고가(高架)구조물의 정위치 시공을 위한 준스태틱RTK 측위의 적용성 실험)

  • Kim, In-Seop
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.19 no.4
    • /
    • pp.119-126
    • /
    • 2011
  • During precise survey on the top of High rise buildings and civil structures, optical surveying equipments like a Total Station are not recommended to use because of some reasons that uneasier alignment with reflectors located at the top of building, increasing error depends on increasement of observation distance and unavailable dynamic positioning etc. Recently various GPS positioning methods have been applied to this job however almost of them are post-processing method which is required much longer time during for whole process includes stake-out, cross checking, fixing positions and final inspections. Therefore, in this study, we applied with RTK surveying system which allows stake-out and inspection in realtime to avoid delaying of construction schedule and also applied with Quasi Static RTK measurement and network adjustment to get a high accuracy within a few millimeters in structure positioning to achieve a successful management for process and quality control of the project. As a result, very high accurate surveying for structures within approx. 2mm in realtime has been achieved when surveyor conduct a network adjustment using least square method for 4 base lines created by Quasi Static RTK data and we expect this method will be applied to construction survey for high rise buildings and civil structures in the future.

Development of the Program Management System for Mega Project in Urban Regeneration (도시재생사업의 메가프로젝트 건설관리시스템 개발)

  • Hyun, Chang-Teak;Kim, Ju-Hyung;Park, Il-Soo;Yu, Jung-Ho;Son, Bo-Sik;Hong, Tae-Hoon;Seo, Yong-Chil;Lee, Sang-Bum;Kim, Hyoung-Kwan;Kim, Chang-Wan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.176-183
    • /
    • 2008
  • Recently, several large-scale Mega-Projects are being conducted. For these urban revitalization projects which requires many complex functions, the existing project management system based on single project level is limited in application. Therefore, our main objectives of this research are two 1) Develop a brand-new program management system(Prototype Ver 1.0) for mega-projects where various facilities are combined both horizontally and vertically. 2) Develop management strategies(Prototype Ver 1.0) based on the program level that enable the comprehensive management of a multiple various projects. The subtitles of this Research are i-PMIS(Program Management Information System) Development, Standardization & Optimization of Construction Life-Cycle Process, Comprehensive Project Cost & Process Management Technology, Effective and Optimized Integrated Performance Management Technology, and, we suggest to optimize the whole life cycle process, predict and respond to various risks, predict and control the process, the cost and the schedule, achieve maximum return on investment to the participating parties, and provide a brand-new Program-MIS including the visual-based web-portal platform to respond the changing business environments and decision making.

  • PDF