A Study on the Determination of Prestressing Force Considering Frictional Loss in Prestressed Concrete Structures (프리스트레스 콘크리트 구조물의 마찰손실을 고려한 긴장력 산정에 관한 연구)

  • 조병완;이재형;태기호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.645-650
    • /
    • 2000
  • In the prestressed concrete structures, the effective prestressing force of tendon is basically most important item for structural safety and serviceability. The frictional loss is one of the major items for determinating the effective prestressing force and depend on the construction accuracy of the structures. In this thesis, it will be analyzed and found through measured hydraulic jack pressure, tendon elongation and prestressing control system that the tendancy of apparent curvature friction coefficient, the ratio of jacking force and required prestressing force, the ratio of initial jacking force and required prestressing force and compatibility of specified friction loss coefficient. The specified control limit for curvature friction coefficient of prestressing control system is about 0.25 and wobble friction coefficient 0.005. Thus, the control limit should be modified according to changed vale of friction coefficient.

  • PDF

The Influence of Unbonded Prestressing Force on the Lateral Torsional Stability of Girders (비부착 긴장력이 거더의 횡비틀림 안정성에 미치는 영향)

  • Lee, Jong-Han;Lee, Kun-Joon;Kighuta, Kabuyaya
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.3
    • /
    • pp.8-15
    • /
    • 2018
  • An experiment was carried out to evaluate the lateral torsional stability of a girder with respect to the location and magnitude of prestressing force. The test of evaluating the lateral displacement and stability of a girder could cause an unexpected result due to various parameters, such as material nonlinearity, initial geometric imperfections, prestressing force, and loading and support conditions. Therefore, a small model testing was programmed to control the various parameters and assess the lateral torsional stability with respect to the prestressing force. This study proposed and fabricated an experimental apparatus that can satisfy the loading and in-plane and out-of-plane support conditions and also contol the prestressing force. The result of the experiment showed that the lateral torsional stability increased when the prestressing force was applied in the bottom flange of the girder. As a result, this study proposed an analytical equation that can account for the effect of the prestressing force in the lateral torsional stability of a girder.

Changes in Corrosion Progress and Ultimate load of Tendon Under 20% and 40% of Ultimate Loading Conditions (파괴하중의 20% 및 40% 인장조건에서 텐던 부식 진행 및 파괴하중 변화)

  • Ryu, Hwa-Sung;An, Gi Hong;Hwang, Chul-Sung;Kwon, Seung-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.4
    • /
    • pp.47-52
    • /
    • 2017
  • PSC (Prestressed Concrete) structures have been used widely for its engineering advantage with using total concrete area as effective compressive section. However tendon inside is exposed to such a high tensile stress that and more attentions should be paid for corrosion control. This work is for changing corrosion current and ultimate strength in tendon with increasing prestressing force in a constant corrosive condition. With increasing prestressing force, corrosion current, corrosion amount, and ultimate load are changed linearly. When prestressing force increases from 20.0 % to 40.0 %, corrosion current increases to 124.4 % and 168.0 % and ultimate load decreases to 87.8 % and 78.4 %, respectively. With inducing constant electrical potential, increasing corrosion current and reduction of strength are evaluated to be linearly related with increasing prestressing load.

Reduction Effect of Moment of Steel Composite Bridge according to Camber Control in Middle Support (중간지점부의 캠버 조정에 따른 강합성교의 모멘트저감 효과)

  • Kim, Kyoung-Nam;Lee, Seong-Haeng;Hahm, Hyung-Gil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.2
    • /
    • pp.634-643
    • /
    • 2010
  • In this study, both an experimental test and a time history analysis with 3D modeling were performed to verify the structural analysis model in a 2-span two girder bridge of high speed railway, which was under constructed according to the ballast load of track structure. In the basis of the structural analysis model, the analysis of construction step was carried out to investigate the reduction effect of moment in middle support of the bridge which has initial prestressing force according to camber control. The initial prestressing force of proper level was calculated, and then the reduction of moment for economical bridge section was studied. Finally, a bridge analysis method was presented for an economical and efficient design in steel composite bridge.

Optimum Design of Prestressed Precast Gerber-U Beams (프리스트레스트 프리캐스트 게르버 U형보의 최적설계)

  • 김인규;박현석;이종민;조상규;유승룡
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.173-178
    • /
    • 2001
  • The cost on transmission and election of precast concrete members largely depends on the weight of them. In this study, the weight of prestressed precast beam could be reduced by control the section and prestressing force to meet the required strength on the basis of the optimum process. The top and bottom concrete stress of the section considered is required to check according to each construction step for this process. The original rectangular beam weight could be reduced up to 50~39% due to the development of a U-beams from the optimum process.

  • PDF

Control of Prestressing Forces in a Splicing Method using the Partial Post-tensioning and Releasing Procedure (부분 긴장과 해제를 이용한 연속화 과정에서의 긴장력 조절)

  • 이환우;김광양
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.15 no.2
    • /
    • pp.251-259
    • /
    • 2002
  • A new splicing technique by the secondary moment which is intentionally induced by the tensioning effect of continuous tendons and the releasing effect of temporary beam tendons was developed. The tensioning and releasing works are essential and the decisions of the magnitude and order about them may be important engineering problems in this technique. In this paper, it was studied lot the practically optimum procedure of the tensioning and releasing works. As the result, it is concluded that the gradual progress through the three stages is reasonable for the procedure and the tensioning work have to precede the releasing work. Additionally, the magnitude of preceding tensioning force should be obtained by the sensitivity analysis and the minimum limit is more critical than the minimum limit.

Estimation of Friction Coefficients Based on Field Data (실측값에 근거한 마찰계수의 추정)

  • Jeon, Se Jin;Park, Jong Chil;Park, In Kyo;Shim, Byul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5A
    • /
    • pp.487-494
    • /
    • 2009
  • Friction coefficients of the prestressing tendon are the basic information required to control the prestressing force introduced to PSC structure during jacking. However, the friction coefficients show considerable differences depending on the specifications, causing much confusion to designers. In this study, the ranges of the friction coefficients presented in domestic and foreign specifications are compared together to clarify the differences. Then, a procedure is proposed that can be used to estimate the wobble and curvature friction coefficients from field data such as elongation and prestressing force and from theory related to the friction. The procedure is applied to various tendon profiles of several PSC bridges constructed by ILM, FCM and MSS. The resulting values are compared with those presented in some specifications and assumed in jacking and a reasonable range of the friction coefficient is discussed. Lift-off tests are also performed in some bridges to further verify the results. The resulting wobble friction coefficients are not as small as those presented in AASHTO specifications but range from the lower limit to mid point of domestic specifications, while the curvature friction coefficients approach or slightly exceed the upper limit.

Evaluation of Friction Coefficients of Prestressing Tendon Using Field Data (실측값을 활용한 긴장재 마찰계수의 산정)

  • Jeon, Se-Jin;Park, In-Kyo;Kim, Kwang-Soo;Lee, Man-Seop;Cho, Jae-Yeol;Park, Chan-Min
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.297-300
    • /
    • 2008
  • Friction coefficients of the prestressing tendon are the basic information required to control the prestressing force introduced to PSC structure during jacking. However, the friction coefficients show considerable differences depending on the specifications, causing much confusion to designers. In this study, a procedure is proposed that can be used to estimate the wobble and curvature friction coefficients from field data and classical theory related to the friction. The procedure is applied to two PSC girder bridges with various tendon profiles. The resulting values are compared with those presented in some specifications and assumed in jacking. The resulting wobble friction coefficients are not as small as those presented in AASHTO specifications but are more or less similar to the lower limit of domestic standards, while the curvature friction coefficients approach or slightly exceed the upper limit of the same standards.

  • PDF

Evaluation of Structural Behavior and Serviceability on Transverse Connection for Modular Slab Bridge System (모듈러 슬래브교량의 횡방향 연결부 구조적 거동 및 사용성 평가)

  • Choi, Jin-Woong;Lee, Sang-Seung;Park, Sun-Kyu;Hong, Sung-Nam
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.6
    • /
    • pp.139-146
    • /
    • 2014
  • Recently, in field of bridge construction, modular technology has been studied to reduce construction period, traffic impact and environmental impact. This study is a part of research related to the modular bridges. The aim of the study is to analyze the structural behavior and evaluate a serviceability for transverse connection of modular slab bridge. A total of four specimens were fabricated. including a control beam for finding the maximum load by static test. And one control beam and two segmental beams were fabricated for cyclic loading test. As the test result, the beams that were introduced 100% of the design prestressing force showed a smaller maximum deflection, residual deflection and crack width than the control beam. The beam for serviceability evaluation was satisfied with structural serviceability limits of the deflection and crack.

Design and Full Size Flexural Test of Spliced I-type Prestressed Concrete Bridge Girders Having Holes in the Web (분절형 복부 중공 프리스트레스트 콘크리트 교량 거더의 설계 및 실물크기 휨 실험 분석)

  • Han, Man Yop;Choi, Sokhwan;Jeon, Yong-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3A
    • /
    • pp.235-249
    • /
    • 2011
  • A new form of I-type PSC bridge girder, which has hole in the web, is proposed in this paper. Three different concepts were combined and implemented in the design. First of all, a girder was precast at a manufacturing plant as divided pieces and assembled at the construction site using post-tensioning method, and the construction period at the site will be reduced dramatically. In this way, the quality of concrete can be assured at the manufacturing factory and concrete curing can be well controlled, and the spliced girder segments can be moved to the construction site without a transportation problem. Secondly, a numerous number of holes was made in the web of the girder. This reduces the self-weight of the girder. But more important thing related to the holes is that about half of the total anchorages can be moved from the girder ends into individual holes. The magnitude of negative moment developed at girder ends will be reduced. Also, since the longitudinal compressive stresses are reduced at ends, thick end diaphragm is not necessary. Thirdly, Prestressing force was introduced into the member through multiple stages. This concept of multi-stage prestressing method overcomes the prestressing force limit restrained by the allowable stresses at each loading stage, and maximizes the magnitude of applicable prestressing force. It makes the girder longer and shallower. Two 50 meter long full scale girders were fabricated and tested. One of them was non-spliced, or monolithic girder, made as one piece from the beginning, and the other one was assembled using post-tensioning method from five pieces of segments. It was found from the result that monolithic and spliced girder show similar load-deflection relationships and crack patterns. Girders satisfied specific girder design specification in flexural strength, deflection, and live load deflection control limit. Both spliced and monolithic holed web post-tensioned girders can be used to achieve span lengths of more than 50m with the girder height of 2 m.