• Title/Summary/Keyword: Contract Type

Search Result 234, Processing Time 0.025 seconds

A Study of Integrated Project Delivery(IPD) Methods Based on Building Information Modeling(BIM) (BIM 기반의 IPD 발주방식에 관한 연구)

  • Shin, Kyoo-Chul;Ham, In-Ho
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.3
    • /
    • pp.15-25
    • /
    • 2012
  • The purpose of this research is to explore the necessity of utilizing IPD methods along BIM based project operation in domestic construction market. IPD is relatively new project delivery methods focused on the collaboration of stockholders based on BIM technology. IPD is focused on the multiparty contract process rather than multiple bilateral contracts under Traditional Project Delivery Methods. The research method is to investigate the IPD standard contract documents, successful IPD project cases in the U.S. The research results are as follows. The model for an IPD standard contract needs to be developed for the application to a real construction projects. Various types of IPD model contract need to be developed to accommodate the requirements of industry and stockholders in Korea.

A Study on the Obstacle Factors of Construction Works in terms of the Specialty Contractors (전문건설업체 측면에서 전문공종 시공업무 장애 요인에 관한 연구)

  • Yang, Jin-Kook;Lee, Ki-Hun;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.155-156
    • /
    • 2021
  • Most of the construction works in domestic are not direct undertaking work, but by a contract method including subcontracting. Therefore, a general contractor for each project jointly carry out construction work with a specialty contractor for each engineering type. However, in terms of contract, this method is not a joint venture contract, but a subcontract. Accordingly, this system can cause various problems between the prime contractor and the subcontractor. Therefore, this study aims to extract and present the actual obstacle factors in terms of specialty contract company performing specialty construction work for construction project. The presented contents are expected to present the standard for the cooperation system that the prime contractor and the subcontractor can win-win.

  • PDF

Comparative Analysis on the Perspectives of Hospitals and Contractors on Items related with Contracting Hospital Foodservice Management (병원급식 위탁계약에 대한 병원과 위탁회사의 견해 비교 분석)

  • Kim, Hyeon-A;Kim, Jin-Su;Yang, Il-Seon;Park, Mun-Gyeong;Park, Su-Yeon
    • Journal of the Korean Dietetic Association
    • /
    • v.10 no.3
    • /
    • pp.293-299
    • /
    • 2004
  • The purposes of this study were to : a) investigate the current status of contracted hospital food services, b) analyze and clarify various perspectives of contractors and hospitals. Thirty six hospitals and their contractors which were having more than 100 beds located in Seoul, Inchon and Kyungkido, were the subjects of this study. Data were collected through surveys. The survey was conducted during March to April in 2002. Questionnaires were mailed to the 36 directors of dietetic departments of hospitals and 36 managers of contract foodservice management company. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis, t-test and $x^2$-test. The results of the study can be summarized ; 1. The type of contract considered adequate by directors of dietetic departments and managers of contractors was fee-contract, combined type, followed by profit-and-loss contract. 2. According to the results from analysis on the contract cost per meal considered adequate by directors of dietetic departments and managers, the directors of dietetic department indicated that showing no difference with the current contract cost per meal. However, the managers of contractor indicated that showing significant differences compared with the current contract cost per meal(regular diet p<0.01, therapeutic diet p<0.001). 3. In the composition of contract cost per meal considered adequate, the managers of contracting businesses accounted labor cost (p<0.01) as a major cost, whereas the chiefs of nutrition departments accounted miscellaneous or controllable expense (p<0.001) and VAT (p<0.01) as major costs. 4. The directors of dietetic departments and managers thought that the hospital should be responsible for utility costs. On the other hand, directors of dietetic departments regarded that the contractor and managers thought that the hospital should pay for facility investment cost.

  • PDF

A Study on the Service Provider's Duty to Provide Services in Conformity with the Contract under the DCFR (DCFR상 서비스제공자의 계약에 적합한 서비스제공의무에 관한 연구)

  • Lee, Byung-Moon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.50
    • /
    • pp.27-59
    • /
    • 2011
  • This article attempts to describe and analyze the rules on the service provider's duty to provide his service in conformity with the contract under the Draft Common Frame of Reference (here-in-after DCFR), which are applied to construction, storage, design and factual information contracts. It categorizes such rules in accordance with the requirements of conformity with the contract, the time when the service provided must be in conformity with the contract, and the exemptions of the service provider's duty. On the basis of such categorization, it examines the rules on the service provider's duty in each type of service contract under the DCFR. By doing so, it seeks to figure out how the members of EU compromised on the various issues of the service provider's duty under the DCFR which is regarded as the first uniformed legislation in the area of the service contract. This may provide some guidance to the legislators of domestic law for their amendment or interpretation of their laws. In addition to them, this article also seeks to point out problems in terms of their interpretations and gaps in their rules to cover various aspects of non-conformity and put forward some solutions for such problems and gaps.

  • PDF

A Study on Some Issue of Application of Art. 35(1).(2) CISG (CISG 제35조(1).(2)항의 실무적 적용상의 유의점에 관한 소고)

  • Heo, Kwang-Uk
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.43
    • /
    • pp.75-97
    • /
    • 2009
  • Article 35 of the CISG defines standards for determining whether goods delivered by the seller conform to the contract in terms of type, quantity, quality, and packaging. When we apply these article 35(1), (2) of the CISG to the business connection, we will face several issues in the business connection. Fist, we will face the interpretation of contracts. When we interpret the contract, we must remember the article 8 of the CISG. Statements made by and other conduct of a party are to be interpreted according to the intent of parties. Therefore parties of contract must describe their intent correctly. Second, we must make out a contract in written about the promised contents. And it is needed to insert a merger clause in order to prevent part of contract from disagreeing with each other. Third, there are several interpretation of fitness for the purpose for which the goods would ordinarily be used. So it is important to describe the quality standard to be applied. If it does not describe the standard, it is helpful to apply the reasonable quality test. Fourth, there may be some doubt regarding the question of whose standard-that of the seller's or that of the buyer's state-is relevant in order to determine which characteristics the goods must have in order to be fit for their ordinary purpose. Ultimately, the question of the relevant standard is a matter of the interpretation of the contract.

  • PDF

A Study on the Liability of the Builder in the Shipbuilding Contract and Products Liability. (선박건조계약상 건조자책임과 제조물책임)

  • Jeong, Seon-Cheol
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.92-93
    • /
    • 2005
  • A contract for the shipbuilding is usually a complicated and involves statement of rights, obligations and responsibilities which each party agrees vis-a vis the other. The ultimate purpose of the contract is the sale and transfer of the finished ship by the builder to the buyer. Contracts for the construction and sale of ships are categorized as contracts for the sale of goods under English, United States, Germany and some countries law. On the other hand, The shipbuilding contract may be classified, not as a contract of sale but as a contract for work and materials under Korea, Japan and some countries law. Especially, most of countries are now well settled with regard to liability of a manufacturer in tort for physical injury and on the other for pure economic loss to remote owners of chattels. Where there is either a breach of contractual warranty or an implied warranty, there may be admiralty jurisdiction, depending once again on the situs of the event and its relationship to traditional maritime activity. Contract principles will be applied to the first type of warranty and tort principles will be applied to the second. First of all, this thesis is dealt with the contents of contract under English Law. Secondly, this thesis is analysed into the liability of shipbuilder in Products Liability under English, American and Korean Law comparisons. In conclusion, the author tries to give some suggestions as countermeasures of Products Liability to the shipbuilder in Korea.

  • PDF

Finding Significant Factors to Affect Cost Contingency on Construction Projects Using ANOVA Statistical Method -Focused on Transportation Construction Projects in the US-

  • Lhee, Sang Choon
    • Architectural research
    • /
    • v.16 no.2
    • /
    • pp.75-80
    • /
    • 2014
  • Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.

An Exploratory Study on the Taxonomy of Control Types in IS Outsourcing Project Management (IS 아웃소싱 프로젝트 관리를 위한 통제의 실증적유형에 관한 탐색적 연구)

  • Lee, Sang-Kon
    • Asia pacific journal of information systems
    • /
    • v.15 no.1
    • /
    • pp.25-44
    • /
    • 2005
  • This study examines control types of IS outsourcing project management focusing on two sets of questions: What control types are implemented during IS outsourcing projects? How various control types affect the performance of IS outsourcing projects. In order to meet these objectives, four control types are developed using typology-approach: dynamic, contract-oriented, partnership-oriented, and passive. And then four control types are identified based on taxonomy-approach using cluster analysis from 66 projects: dynamic, contract-oriented, passive, and middle. The result shows that the derived taxonomy-types are similar to the typology-types except partnership-oriented type. The result also indicates that dynamic and contract-oriented types are in the highest performance, while passive type is in the least performance.

Coordination of Component Production and Inventory Rationing for a Two-Stage Supply Chain with a VMI Type of Supply Contract (적시 부품 공급 계약을 갖는 두 단계 공급망에서 부품 생산과 재고 분배의 통합적 구현)

  • Kim, Eun-Gab
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.37 no.2
    • /
    • pp.45-56
    • /
    • 2012
  • This paper considers a supply chain consisting of a component manufacturer and a product manufacturer. The component manufacturer provides components for the product manufacturer based on a vendor-managed inventory type of supply contract, and also faces demands from the market with the option of to accept or reject each incoming demand. Using the Markov decision process model, we examine the structure of the optimal production control and inventory rationing policy. Two types of heuristics are presented. One is the fixed-buffer policy and the other uses two linear functions. We implement a computational study and present managerial insights based on the observations.

Typical Daily Load Profile Generation using Load Profile of Automatic Meter Reading Customer (자동검침 고객의 부하패턴을 이용한 일일 대표 부하패턴 생성)

  • Kim, Young-Il;Shin, Jin-Ho;Yi, Bong-Jae;Yang, Il-Kwon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.9
    • /
    • pp.1516-1521
    • /
    • 2008
  • Recently, distribution load analysis using AMR (Automatic Meter Reading) data is researched in electric utilities. Load analysis method based on AMR system generates the typical load profile using load data of AMR customers, estimates the load profile of non-AMR customers, and analyzes the peak load and load profile of the distribution circuits and sectors per every 15 minutes/hour/day/week/month. Typical load profile is generated by the algorithm calculating the average amount of power consumption of each groups having similar load patterns. Traditional customer clustering mechanism uses only contract type code as a key. This mechanism has low accuracy because many customers having same contract code have different load patterns. In this research, We propose a customer clustring mechanism using k-means algorithm with contract type code and AMR data.