• Title/Summary/Keyword: Continuous track

Search Result 246, Processing Time 0.032 seconds

Development of Movable nose crossing turnout on concrete track using Fast Clip (Fast clip을 적용한 콘크리트궤도용 노스가동 분기기 개발)

  • Hwang, Kwang-Ha;Ryou, Ki-Tae;Park, Chun-Bok;Park, Kwang-Ryoun;Yun, Byung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.287-296
    • /
    • 2011
  • Turnout is a mechanical installation enabling railway trains to be guided from one track to another at a railway junction. A movable nose crossing frog is a device used at a railway turnout to eliminate the gap at the common crossing (High manganese, block, assembly crossing)which can cause impact damage, noise and vibration. Our government has a plan speed up of conventional line to 250km/h semi-high speed. We had already developed flexible turnout with fixed crossing(High manganese) and SFC fastening system can cover in the semi-high speed line In this study is about development of the movable nose crossing turnout available Semi-high speed line on concrete track. This paper describes about geometry, attack angle, bending stress at the nose, switching force, safety of continuous welded long rails. This movable nose crossing turnout is expected greatly increases passing speed of turnout in national railway.

  • PDF

Analysis of Short Grinding Effect on Removing of Surface Irregularities of Rail Welding Joint (레일용접부 요철 제거의 국부연마 효과 분석)

  • Woo, Byoung-Koo;Lee, Syeung-Yeol;Kim, Myung-Soo;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.684-691
    • /
    • 2010
  • Rail is one of major track components for train service, it should be provided in the condition of flat and smooth driving aspect. Therefore, it is inevitable that there would be the field welding to integrate on CWR(Continuous Welded Rail) removing rail joint in these days. It is high chance to be some rail surface irregularity due to the limitation on the status of work condition If a high speed train runs on the rail surface irregularity in the welding part, big impact load comes to pass on that, so track irregularity cycle is reduced, therefore track maintenance cost can be increased. this paper has analyzed wheel load variation according to removing the rail surface irregularity using portable grinding machine in the high speed line. The result measured before and after in the field is decreased about 9.26% on the wheel load variation.

  • PDF

Parametric Study on Thermal Buckling of CWR Tracks (장대레일궤도의 온도좌굴에 영향을 미치는 매개변수 연구)

  • 최동호;김호배
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.295-302
    • /
    • 2001
  • The lateral stability of curved continuous welded rail (CWR) is studied fur buckling prevention. This study includes the influences of vehicle induced loads on the thermal buckling behavior of straight and curved CWR tracks. quasi-static loads model is assumed to determine the uplift region, which occurs due to the vertical track deformation induced by wheel loads of vehicle. Parametric numerical analyses are performed to calculate the upper and lower critical buckling temperatures of CWR tracks. The parameters include track lateral resistance, track curvature, longitudinal stiffness, tie-ballast friction coefficient, axle load, truck center spacing, and the ratio of lateral to vertical vehicle load. This study provides a guideline for the improvement or stability for dynamic buckling in on tracks.

  • PDF

The effect of Mobile Flash Butt Welding (이동식 플래시 버트 용접의 효과)

  • Lee Jun-Sik;Lee Jong-Su;Lee Hak-Kyu;Lee Jung-Kwon;Lee Jee-Ha
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.793-799
    • /
    • 2004
  • In track a third weakness point is joint part, turnout part, curve part. One of them joint part of rail have been known to the most weak point by loosen of joint bar and fish bolt due to impulse and vibration by wheel contact at times. In addition happen to deformation and failure at end of rail, failure and miniature of ballast gravel. Finally impact between wheel and rail become origin cause of a welded rail, noise and vibration. riding condition deterioration, besides track failure. In the present domestic, Thermite and Gas pressure weldings have been used to continuous welded rail(CWR), however stiffness and confidence in quality is lower than Flash butt welding method. FRW have the excellent capacity, however have a shortcoming large scale of machine and power equipment. Therefore we will introduce Mobile Flash Butt Welder can weld in track.

  • PDF

Design and modelling of pre-cast steel-concrete composites for resilient railway track slabs

  • Mirza, Olivia;Kaewunruen, Sakdirat;Kwok, Kenny;Griffin, Dane W.P.
    • Steel and Composite Structures
    • /
    • v.22 no.3
    • /
    • pp.537-565
    • /
    • 2016
  • Australian railway networks possess a large amount of aging timber components and need to replace them in excess of 280 thousands $m^3$ per year. The relatively high turnover of timber sleepers (crossties in a plain track), bearers (skeleton ties in a turnout), and transoms (bridge cross beams) is responsible for producing greenhouse gas emissions 6 times greater than an equivalent reinforced concrete counterparts. This paper presents an innovative solution for the replacement of aging timber transoms installed on existing railway bridges along with the incorporation of a continuous walkway platform, which is proven to provide environmental, safety and financial benefits. Recent developments for alternative composite materials to replace timber components in railway infrastructure construction and maintenance demonstrate some compatibility issues with track stiffness as well as structural and geometrical track systems. Structural concrete are generally used for new railway bridges where the comparatively thicker and heavier fixed slab track systems can be accommodated. This study firstly demonstrates a novel and resilient alterative by incorporating steel-concrete composite slab theory and combines the capabilities of being precast and modulated, in order to reduce the depth, weight and required installation time relative to conventional concrete direct-fixation track slab systems. Clear benefits of the new steel-concrete composites are the maintainability and constructability, especially for existing railway bridges (or brown fields). Critical considerations in the design and finite element modelling for performance benchmarking of composite structures and their failure modes are highlighted in this paper, altogether with risks, compatibilities and compliances.

Statistical Characteristics for Longitudinal Friction Behavior of Rail Fastening System for Concrete Track (콘크리트 궤도용 레일체결장치의 종방향 마찰거동에 대한 통계적 특성)

  • Bae, Hyun-Ung;Park, Sang-Jun;Yun, Kyung-Min;Park, Beom-Ho;Lim, Nam-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7870-7877
    • /
    • 2015
  • In the case of CWR (Continuous welded rail) located on the railway bridge, the CWR has additional axial force due to interaction of bridge and track. Therefore, the CWR tracks located on the bridge have to secure the safety of running train and CWR track through mitigating influence for interaction of bridge and track. The railway design guide in Korea (KR C-08080) provides a certain value for property of longitudinal friction behavior of rail fastening system that is major parameter of interaction behavior by applying European codes. However, in order to apply to domestic railway, it is necessary to review property characteristics of the rail fastening system in actual use. In this paper, the experiment for longitudinal friction behavior of rail fastener applied to concrete track on the railway bridge in Korea was carried out, and statistical characteristic for property of the rail fastener was analyzed from the result of the experiment.

A GNSS Interference Detection Method Based on Multiple Ground Stations

  • Kim, Sun Young;Kang, Chang Ho;Yang, Jeong Hwan;Park, Chan Gook;Joo, Jung Min;Heo, Moon Beom
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.1 no.1
    • /
    • pp.15-21
    • /
    • 2012
  • For a GNSS receiver's robustness against RFI and the high accuracy of navigation solution in GNSS, interference source detection and mitigation are needed. In this paper, an adaptive lattice IIR notch filter is employed to track single-tone continuous wave and swept continuous wave interference signals, and an interference detection method is proposed. Furthermore, this paper presents interference source characterization algorithm using multiple ground stations' interference detection results. The measurement of the signal powers from each ground station is used to build weighting factors to estimate the type of the interference. The performance of interference detection algorithm is simulated for scenarios of GPS signal in the presence of single-tone continuous wave interference and swept continuous wave interference.

A Study on the Characteristics of Axial Force in Bridge with Continuous Welded Rail (장대레일화 된 교량의 축력거동특성 연구)

  • Kim, Doo-Hwan;Han, Kwang-Seob
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.1
    • /
    • pp.251-258
    • /
    • 2003
  • This study is to understand the characteristics of axial force behavior that operates to the part of continuous welded rail and to investigate the basic data for secure the structure's stability and retrofit of the track. To develop the FEM model that type of plate girder which is used in the domestic national railway among servicing railway type. It is to analyze the characteristics of axial force behavior according to equip of the expansion joint and support placing by using the axial force simulation in making the continuous welded rail. As the result of research on the parametric valuables through the analysis, it is investigated that 'FMFM type' is more efficient than the other support type. Also, it conclude that structures are having the expansion joint is the most safe condition.

Prediction of Tractive Performance of Tracked Vehicles Using a Computer Simulation Model

  • Park, W.Y.;Chang, Y.C.;Lee, K.S.
    • Agricultural and Biosystems Engineering
    • /
    • v.4 no.1
    • /
    • pp.34-38
    • /
    • 2003
  • A mathematical model was developed for estimating the mechanical interrelation between characteristics of soil and main design factors of a tracked vehicle, and predicting the tractive performance of the tracked vehicle. Based on the mathematical model, a computer simulation program (TPPMTV) was developed in the study. The model considered the continuous change in tension for the whole track of a tracked vehicle, the analysis of shape and tension of the track segment between sprocket and first roadwheel, and the side thrust on both sides of grouser by the active earth pressure theory in predicting the tractive performance of a tracked vehicle. Also, the model contained not only sinkage depth of the track but the pressure distribution under the track in analyzing the side thrust. The effectiveness of the developed model was verified by performing the draw bar pull tests with a tracked vehicle reconstructed for test in loam soil with moisture content of 18.92%. The predicted drawbar pulls by the model were well matched to the measured ones. Such results implied that the model developed in the study could estimate the drawbar pulls well at various soil conditions, and would be very useful as a simulation tool for designing a tracked vehicle and predicting its tractive performance.

  • PDF

Development of Auto Tracking System for Baseball Pitching (투구된 공의 실시간 위치 자동추적 시스템 개발)

  • Lee, Ki-Chung;Bae, Sung-Jae;Shin, In-Sik
    • Korean Journal of Applied Biomechanics
    • /
    • v.17 no.1
    • /
    • pp.81-90
    • /
    • 2007
  • The effort identifying positioning information of the moving object in real time has been a issue not only in sport biomechanics but also other academic areas. In order to solve this issue, this study tried to track the movement of a pitched ball that might provide an easier prediction because of a clear focus and simple movement of the object. Machine learning has been leading the research of extracting information from continuous images such as object tracking. Though the rule-based methods in artificial intelligence prevailed for decades, it has evolved into the methods of statistical approach that finds the maximum a posterior location in the image. The development of machine learning, accompanied by the development of recording technology and computational power of computer, made it possible to extract the trajectory of pitched baseball from recorded images. We present a method of baseball tracking, based on object tracking methods in machine learning. We introduce three state-of-the-art researches regarding the object tracking and show how we can combine these researches to yield a novel engine that finds trajectory from continuous pitching images. The first research is about mean shift method which finds the mode of a supposed continuous distribution from a set of data. The second research is about the research that explains how we can find the mode and object region effectively when we are given the previous image's location of object and the region. The third is about the research of representing data into features that we can deal with. From those features, we can establish a distribution to generate a set of data for mean shift. In this paper, we combine three works to track baseball's location in the continuous image frames. From the information of locations from two sets of images, we can reconstruct the real 3-D trajectory of pitched ball. We show how this works in real pitching images.