• Title/Summary/Keyword: Construction-phase Risk

Search Result 140, Processing Time 0.035 seconds

A study on the Stability of Rail way Construction on the Reclaimed Land for Domestic Marine Clay Using the Seismic Analysic (연약지반상 지진하중을 고려한 철도노반의 안정성 검토에 관한 연구)

  • Kim Young-Soo;Kim Moo-Ill
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1071-1076
    • /
    • 2004
  • The purpose. in this study. is to analyze liquefaction potential of Inchon International Airport at the Area Phase ' I ' for Railway Construction of all, seismic response was analyzed using the computer program, Shake91. Four methods proposed by Seed & Idriss. Eurocode, Iwasaki & Tatsuoka. and Ishihara were used for assessment of liquefaction potential and safety factors calculated form these methods are compared. Based on the results of seismic response analysis, the maximum acceleration at the ground surface is larger than that evaluated site factor effect by using site factor because these areas are composed of very loose sand clay. Especially, in the case of analysis with long period earthquake data. it is appeared that the acceleration of earthquake is amplified more largely. Therefore, accurate seismic response analysis is suggested for the design on the important structures on reclaimed land. The analytical results of liquefaction potential show that the increments of N-value and effective overburden pressure with remediation make safety factors increase. Through comparing the safety factors evaluated from four method, the safety factor calculated by See & Idriss method in the lowest one and it is found that the SPT N-value effect the safety factor very largely. And, Iwasaki & Tatsuoka method is affected by various factors such as average grain size. fine contents, confining pressure. In conclusion. to minimize earthquake Risk by liquefaction, the efficient remediation is essential and seismic response analysis should be carride out.

  • PDF

Requirement Management System of the Constructing Railway Safety Test Facilities adopting the Model-Based Systems Engineering (모델기반 시스템엔지니어링 접근을 통한 철도안전시험설비구축사업 요건관리 체계)

  • Kim, Yun-Mi;Choi, Kyoung-Jin;Cho, Youn-Ok
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.382-387
    • /
    • 2009
  • Requirement management is an important phase that has a significant influence on the project success. As a risk to a project fail is getting bigger, people adopt Systems Engineering method to the development of the effective requirement management. Accordingly, Railroad Safety Technology R&D Corps. is progressing the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective requirement management methods with Systems Engineering techniques. To support that, we introduce the Systems Engineering Requirement Management Process and propose the more effectual management method of constructing the Railway Safety Test Facilities applying the model-based systems engineering tool to the research.

  • PDF

An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project (초고층 개발사업 추진을 위한 단계별 리스크 요인의 특성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.103-115
    • /
    • 2016
  • The 106 buildings of 200 meters' height or greater were completed around the world in 2015 (CTBUH, The Council on Tall Buildings and Urban Habitat). They beat every previous year on record, including the previous record high of 99 completions in 2014. This brings the total number of 200-meter-plus buildings in the world to 1,040, exceeding 1,000 for the first time in history and marking a 392% increase from the year 2000, when only 265 existed. South Korea recorded three completions during 2015 - improving slightly over 2014, in which it had one. This study focused on the fact that high-rise building development project risks have not reduced in Korea in spite of numerous studies and measures. And it attempted to examine whether existing studies and measures have been presented on the basis of the accurate analysis of existing studies and measures and classify and analyze the characteristics of each phase' s risk factors in the hope that its results would be one reference point as to the measure to prevent high-rise building development project risks in the future. A high-rise building development project is the high risk project as compared with the low-rise project. Because a high-rise development project takes long and is very sensitive to the changing environment. Therefore, in order to succeed the project it becomes necessary to effectively manage the risk involved in the process of the high-rise building development project. The result of this study can be used as the guideline to make the risk management system for the high-rise development project.

The Analysis of Waste Factors for Business Phases on Customized Apartment Project (맞춤형 공동주택 프로젝트의 업무단계별 낭비요인 분석)

  • Choi, Jung-Im;Lee, Ki-Suk;Jung, Sung-Ho;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.146-156
    • /
    • 2013
  • Recently, to reflect the various needs of customers in the apartment field, the customized apartment has emerged. From the point of the customer, customized apartments have the definite advantage of being able to guarantee more customer options. On the other hand, from the point of the project manager, there are significant risk factors, with increase of management factors, construction delays, etc. The reasons for this are, to date, the insufficient systematic analysis of the project, and the lack of experience of similar projects. This study provides the waste factors of each phase in a customized apartment project. A survey and interview are conducted to achieve the waste factors using MUDA methodology; a process of the project was analyzed; and a factor of each process was identified. Also, AHP(Analytic Hierarchy Process) are used, to evaluate the waste factors in project stages. The AHP results show that "Design change" and "Inappropriate intervention in construction process" ranked highly in the waste factors. The results of our research will provide a countermeasure that addresses waste factors in similar projects, and contributes to reducing the extra cost and time in new projects.

Developing a Program Performance Management Framework for Mixed-use Development in Urban Regeneration Projects (입체복합공간 개발사업의 프로그램 성과관리 체계 구축)

  • Lee, Kang-Wook;Hong, Hwa-Uk;Park, Hee-Dae;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.141-152
    • /
    • 2011
  • The market volume of urban regeneration projects has steadily increased, thereby mixed-use development also shows significant market growth. However, previous researches on urban regeneration mainly deduced suggestions and plans for institution improvement based on comparison between projects implemented the inside and outside of the country. Whereas, researches on project management closely related to project success were limited, particularly in performance management. Accordingly, this research aims at developing a program performance management framework for public clients so as to succeed mixed-use development projects. Through extensive literature review and expert interview, this research developed performance indices for diverse facilities, risk management framework and integrating method of program performance score. The proposed framework is able to consider total life cycle from basic planning to maintenance phase and to check real-time performance level. Moreover, risk management framework can periodically assess and control the level of inherent risks within performance indices. The results can contribute to improve existing performance management practices and be basis for a web-based system developed in future.

A Study on the Improvement of Design for Safety(DfS) System (설계안전성검토(DfS) 제도의 개선방안 연구)

  • Lee, Solim;Cho, Sungwoo;Kim, Dongeon;Yu, Jiyoung;Lee, Eunmi
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.2
    • /
    • pp.70-75
    • /
    • 2019
  • The purpose of this study is to conduct survey on the DfS system for employees who perform construction-related tasks, analyze the results, and present improvement directions. The results of the survey showed that the system was gradually being settled, with about 82% and 93% positive results on the recognition and necessity of the system. In addition, the three highest response rates for the improvement of the system were first, improving the expertise of DfS-related performance personnel, second, improving the awareness of DfS-related actors, and third, reflecting the appropriate costs associated with DfS. For the realization of the above improvements, it was proposed to prepare a curriculum for improving the professionalism of the staff, to implement an incentive system for improvement of perception, and to prepare appropriate payment criteria for preparing reports available during the construction phase. In addition, the Korea Infrastructure Safety and Technology Corporation will need to perform its active role in order to become a system for preemptive management of risk factors for construction accidents from the design stage.

Study on Management Plan of the Financial Supervisory Service According to Increase of Risk of Household Debts (중소형증권사 Project-Financing 우발채무 확대에 따른 금융감독원 관리방안에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.21-33
    • /
    • 2018
  • In 2018, the real estate markets have hardly been transacted according to the government's tight regulations of real estates, and have the high possibility to reach a low hit due to the hike of loan interest rates following the U. S rise of base money rate. The key profits for the large construction companies mainly come from the overseas plant projects and the domestic non-governmental construction projects. They suffered a lot such as the lowering of their credit ratings due to the large losses caused by the frquent design changes and work delay. Even in the domestic non-governmental construction projects, the general business risks are on the rise due to the property marketing moving over to the decreasing phase. The small and medium sized security companies has realized a lot of operaring profits as they participated in the PF market to make up for the losses in the securities trading business. But, now as the housing market is not so good around the nation except Seoul and the financial states of large construction companies are not good enough, they can face the liquidity crisis if there happens the problems in the PF backed securities which they have handled. As Korean economy experienced the crisis in the savings banks before, it is recommended that Financial Supervisory Service proposes the preemptive control method and supervision direction to overcome the crisis.

Identification and importance analysis of hazards affecting the stability of TBM tunnelling works (TBM 터널 굴착 안정성에 영향을 미치는 위험요소 도출 및 중요도 결정)

  • Seong, Joo-Hyun;Youn, Jun-Ung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.973-984
    • /
    • 2017
  • There is a growing need to apply TBM tunnelling method for the construction of underground facilities such as subways and utility tunnels in urban areas. Due to the variability and uncertainty of the ground, tunnelling in urban areas has various safety hazards which could cause damage to people and properties and it is very costly to recover from accidents. Therefore, it is very important to identify hazards from the planning and design phase and to establish risk mitigation measures. In this study, a total of 31 hazards affecting the stability of TBM tunnelling works in urban areas were listed from both the technical literature and correspondence with experts in tunnelling area. The importance and priorities of the hazards were analyzed by conducting Delphi technique, which is a decision-making method by consensus among experts. Finally, 12 hazards that satisfy the content validity criteria were settled and could be used as major control factors for accident prevention during TBM tunnelling works.

Asbestos Exposure among Mitering Workers

  • Phanprasit, Wantanee;Sujirarat, Dusit;Musigapong, Pirutchada;Sripaiboonkij, Penpatra;Chaikittiporn, Chalermchai
    • Safety and Health at Work
    • /
    • v.3 no.3
    • /
    • pp.235-240
    • /
    • 2012
  • The objectives are to compare the airborne asbestos concentrations resulted from mitering of abestos cement roof sheets by a high-speed motor and a hand saw, and to monitor whether other workers near the test sites are vulnerable to the fibers exceeding the occupational exposure limit. Four test cases were carried out and altogether 7 personal and 4 area air samples were collected. The NIOSH method 7400 was employed for the air samplings and analysis. Using the phase contrast microscopy, fiber counting was conducted under Rule A. The study showed that the fiber concentration medians for personal air samples gathered from the two tools were 4.11 fibers/cc (ranged: 1.33-12.41 fibers/cc) and 0.13 fibers/cc (ranged: 0.01-5.00 fibers/cc) respectively. The median for the area samples was 0.59 fibers/cc (ranged: 0.14-3.32 fibers/cc). Comparing each study case, the concentration level caused by the high-speed motor saw was more than twice that of the hand saw. According to the area samples, the workers nearby the test site are at risk from high exposure to asbestos.

A Case Study on the Field Monitoring of the Deep Rock Excavation Site in Urban Area (도심지 대심도 암반 굴착현장에서의 Face Mapping 적용사례)

  • Kim, Tae-Seob;Kim, Hyung-Min;Jo, Choong-Sick;Kang, Tae-Seong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1307-1316
    • /
    • 2009
  • In this case, powerfulness quorum of destruction side which we have expected are supposed general limit value for rock floor when retaining of earth on the section of rock floor in the urban area. For digging in the urban area, there are a lot of dislocations to be disadvantage for safety of digging ants. The displacement of the pondside didn't converged with the phase of the excavation. Also, the speed of displacement got higher than the percentages of risk in the construction. So, we put into operation Face mapping for checking special quality of dislocations which appear on the digging ants. This results were used to decide a destruction in the case of the final excavation by analyzing with other results. It was possible to know the unstable distribution of a fault line in Face Mapping and to get powerful lens of a surface of discontinuity by tests indoors and outdoors. The results were also used to make a solution. Therefore, It's a successful example using the Partial TopDown for stable digging. And it is important that Face Mapping have to be practiced for solving the uncertainty of ground organization when digging design in the urban city.

  • PDF