• Title/Summary/Keyword: Construction-BIM

Search Result 981, Processing Time 0.023 seconds

An Energy Performance Comparison of University Lecture Facilities for Energy Saving Building Design (에너지 절약형 건축물 설계를 위한 대학 강의동 형태별 에너지 성능 비교에 관한 연구)

  • Kim, Tae-Hoon;Seo, Ji-Hyo;Choo, Seung-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.11
    • /
    • pp.105-112
    • /
    • 2018
  • Global environmental problems are growing, and the importance of buildings with high energy consumption has been emphasized. In Korea, the Ministry of Land, Transport and Maritime Affairs has been promoting the mandatory zero energy building since 2020, and guidelines related to the zero energy building have been developed. In addition, based on the "Energy-saving Design Criteria for Buildings" of the "Green Building Promotion Act" in Korea, the standards for energy-saving design are specified and the energy saving plan is written. Besides, the 'Energy-saving construction standards for eco-friendly houses' also specify insulation, machinery, equipment, and sunshade. Also, there is little consideration about the cost such as construction cost and material cost which should be considered important in the construction stage. Therefore, this study aims at analysis of building type and energy performance versus materials for energy saving building design considering energy performance in planning aspect of initial design stage. In this study, because the variables can not be neglected in this study, it is selected as the lecture facility of the 'K' university campus building which can consider the remaining factors except the passive design element as the control variable, Energy performance analysis.

Development of an Algorithm for the Automatic Quantity Estimation of Wall Rebar

  • Kim, Do-Yeong;Suh, Sangwook;Kim, Sunkuk;Lwun Poe Khant
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.83-94
    • /
    • 2023
  • In order to devise a rebar usage optimization algorithm, it is necessary to calculate the exact rebar length and revise the arrangement of rebars into special lengths. However, the process of rearranging numerous rebars and manually calculating their quantities is time-consuming and requires significant human resources. To address this challenge, it is necessary to develop an algorithm that can automatically estimate the length of rebars and calculate their quantities. This study aims to create an automatic estimation algorithm that improves work efficiency while ensuring accurate and reliable calculations of rebar quantities. The algorithm considers various factors such as concrete cover, hook length, development length, and lapping length, mandated by the building codes, to calculate the quantity of rebars for wall structures. The effectiveness of the proposed method is validated by comparing the rebar quantities generated by the algorithm with manually calculated quantities, resulting in a difference rate of 1.14% for the hook case and 1.37% for the U-bar case. The implementation of this method enables fast and precise estimation of rebar quantities, adhering to relevant regulatory codes.

Adding AGC Case Studies to the Educator's Tool Chest

  • Schaufelberger, John;Rybkowski, Zofia K.;Clevenger, Caroline
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1226-1236
    • /
    • 2022
  • Because students majoring in construction-related fields must develop a broad repository of knowledge and skills, effective transferal of these is the primary focus of most academic programs. While inculcation of this body of knowledge is certainly critical, actual construction projects are complicated ventures that involve levels of risk and uncertainty, such as resistant neighboring communities, unforeseen weather conditions, escalating material costs, labor shortages and strikes, accidents on jobsites, challenges with emerging forms of technology, etc. Learning how to develop a level of discernment about potential ways to handle such uncertainty often takes years of costly trial-and-error in the proverbial "school of hard knocks." There is therefore a need to proactively expedite the development of a sharpened intuition when making decisions. The AGC Education and Research Foundation case study committee was formed to address this need. Since its inception in 2011, 14 freely downloadable case studies have thus far been jointly developed by an academics and industry practitioners to help educators elicit varied responses from students about potential ways to respond when facing an actual project dilemma. AGC case studies are typically designed to focus on a particular concern and topics have thus far included: ethics, site logistics planning, financial management, prefabrication and modularization, safety, lean practices, preconstruction planning, subcontractor management, collaborative teamwork, sustainable construction, mobile technology, and building information modeling (BIM). This session will include an overview of the history and intent of the AGC case study program, as well as lively interactive demonstrations and discussions on how case studies can be used both by educators within a typical academic setting, as well as by industry practitioners seeking a novel tool for their in-house training programs.

  • PDF

A Study on the Possibility of Initial Cost Saving in the New Housing Model Considering Long-life and Constructability - Focused on the Case Analysis with Converting Skeleton and Cladding to New Systems - (장수명화와 시공성을 고려한 새로운 공동주택 모델의 초기 비용절감 가능성 연구 - 구조체와 외장전환 사례분석을 중심으로 -)

  • Kim, Soo-Am;Shin, Sung-Eun;Chung, Joon-Soo;Shon, Young-Jin
    • Journal of the Korean housing association
    • /
    • v.23 no.6
    • /
    • pp.49-59
    • /
    • 2012
  • This study suggested a new model in consideration of long life and constructability of apartment house suggested in the former part. New model suggested the possibility of cost saving based on the idea that people trend to reject because of the recognition that the new model would cost a lot of expense which work as the barrier for the expansion and distribution at the local market so as to prepare the ground for its activation. The Study was aimed at verifying the possibility of cost saving through comparing it with the existing standard apartment house system centered on the skeleton and cladding system among the new structural design models suggested in the former part. Assuming that these existing standard both models should be changed structural design into new model system, the quantity volume, cost and construction period along with the alteration of finished materials between two models were compared altogether. Simultaneously BIM library was built for easy taking-off bill of quantity and consideration of working methodology for construction working cycle, which was translated into construction cost so as to derive the cost of the two subject systems to be counted. Through the analysis, it was concluded that new model would secure variability in the future and constructability along with shortening the construction period (29%) and achieve cost saving (13%) of construction against the those of existing model.

Workspace Generation and Interference Optimization Algorithm by Work-type using 3D Model Object in a Construction Project (건설프로젝트의 작업유형별 3차원 작업공간 생성 및 간섭 최적화 방안)

  • Kim, HyeonSeung;Moon, HyounSeok;Kim, ChangHak;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1911-1918
    • /
    • 2014
  • The increase of input resources, such as labor and equipment, in a construction project causes workspace interference between activities and it influences on the productivity and quality of construction activities. To solve this problem, many studies related to the workspace interference have been performed, however they verified the workspace concerning with only the geometric location of activities or generated the shape of workspace by a whole object concept not separated units of detailed operations. It is difficult for project manager to reasonably analyze the workspace conflict, because the size of workspace cannot reflect the characteristics of an activity and input time of a resource. This paper presents a methodology that can generate three-dimensional models in order to optimize the workspace shape and size by considering with the characteristics of each activity and input time of each resource. The suggested method can be used for the active BIM system that optimizes the workspace conflict without additional construction duration and for the searching algorithm of optimized moving path for construction equipment.

Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost (사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발)

  • Kim, Hyeonseung;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.54-61
    • /
    • 2016
  • The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to increase the practical usability of 5D CAD system.

Contract-based Access Control Method for NFT Use Rights

  • Jeong, Yoonsung;Ko, Deokyoon;Seo, Jungwon;Park, Sooyong;Kim, Seong-Jin;Kim, Bum-Soo;Kim, Do-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.11
    • /
    • pp.1-11
    • /
    • 2022
  • In this paper, we propose an NFT(Non-Fungible Token)-based access control method for safely sharing data between users in blockchain environment. Since all data stored in the blockchain can be accessed by anyone due to the nature of the technology, it is necessary to control access except for authorized users when sharing sensitive data. For that, we generate each data as NFT and controls access to the data through the smart contract. In addition, in order to overcome the limitations of single ownership of the existing NFT, we separated the NFT into ownership and use rights, so that data can be safely shared between users. Ownership is represented as an original NFT, use rights is represented as a copied NFT, and all data generated as NFT is encrypted and uploaded, so data can be shared only through the smart contract with access control. To verify this approach, we set up a hypothetical scenario called Building Information Modeling (BIM) data trade, and deployed a smart contract that satisfies 32 function call scenarios that require access control. Also, we evaluated the stability in consideration of the possibility of decryption through brute-force attack. Through our approach, we confirmed that the data can be safely shared between users in blockchain environment.

IFC test between commercial 3D CAD application using IFC (IFC를 중심으로 한 상용 3D CAD의 호환성테스트)

  • Lim, Jae-In;Kim, Jae-Woo;Kwon, Hyuk-Do;Yoon, Su-Won;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.85-94
    • /
    • 2008
  • The process of construction industry basically consists of many complicated phase, such as planning, design, construction, MO&R(Maintenance, Operation, and Repair), and deconstruction. And various participants communicate each other during every phase of process. Since construction components have become more complex and diverse recently, many researches on how to exchange and standardization of building. However, in Korea research on IFC(Industry Foundation Classes) which is a standard for international data exchange have been conducted with only study limited Issues, such as studies on the development of 2D extension model for IFC, researches on 3D or 4D based IFC extension, and etc. This stuff covers tests of the compatibility among commercial 3D CAD programs using IFC file format. Several problems of the current IFC model are retrieved as a result.

A formal representation of data exchange for slope stability analysis of smart road design and construction

  • Dai, Ke;Huang, Wuhao;Wen, Ya;Xie, Yuru;Kim, Jung In
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1130-1137
    • /
    • 2022
  • The Industry Foundation Classes (IFC) provides standardized product models for the building construction domain. However, the current IFC schema has limited representation for infrastructure. Several studies have examined the data schema for road and highway modeling, but not in a sufficiently comprehensive and robust manner to facilitate the overall integrated project delivery of road projects. Several discussions have focused on slope engineering for road projects, but no solution has been provided regarding the formalized parametric modeling up to now. Iterative design, analysis, and modification are observed during the process of slope design for road projects. The practitioners need to carry out the stability analysis to consider different road design alternatives, including horizontal, vertical, and cross-section designs. The procedure is neither formalized nor automated. Thus, there is a need to develop the formal representation of the product and process of slope analysis for road design. The objective of this research is to develop a formal representation (i.e., an IFC extension data schema) for slope analysis. It consists of comprehensive information required for slope analysis in a structured manner. The deliverable of this study contributes to both the formal representation of infrastructure development and, further, the automated process of slope design for road projects.

  • PDF

Concrete Reinforcement Modeling with IFC for Automated Rebar Fabrication

  • LIU, Yuhan;AFZAL, Muhammad;CHENG, Jack C.P.;GAN, Vincent J.L.
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.157-166
    • /
    • 2020
  • Automated rebar fabrication, which requires effective information exchange between model designers and fabricators, has brought the integration and interoperability of data from different sources to the notice of both academics and industry practitioners. Industry Foundation Classes (IFC) was one of the most commonly used data formats to represent the semantic information of prefabricated components in buildings, whereas the data format utilized by rebar fabrication machine is BundesVereinigung der Bausoftware (BVBS), which is a numerical data structure exchanging reinforcement information through ASCII encoded files. Seamless transformation between IFC and BVBS empowers the automated rebar fabrication and improve the construction productivity. In order to improve data interoperability between IFC and BVBS, this study presents an IFC extension based on the attributes required by automated rebar fabrication machines with the help of Information Delivery Manual (IDM) and Model View Definition (MVD). IDM is applied to describe and display the information needed for the design, construction and operation of projects, whereas MVD is a subset of IFC schema used to describe the automated rebar fabrication workflow. Firstly, with a rich pool of vocabularies practitioners, OmniClass is used in information exchange between IFC and BVBS, providing a hierarchy classification structure for reinforcing elements. Then, using International Framework for Dictionaries (IFD), the usage of each attribute is defined in a more consistent manner to assist the data mapping process. Besides, in order to address missing information within automated fabrication process, a schematic data mapping diagram has been made to deliver IFC information from BIM models to BVBS format for better data interoperability among different software agents. A case study based on the data mapping will be presented to demonstrate the proposed IFC extension and how it could assist/facilitate the information management.

  • PDF