• Title/Summary/Keyword: Construction work

Search Result 4,767, Processing Time 0.032 seconds

A Study on the Effective Management Methods of Craftsmen through Job Environment and Productivity Analysis of Construction Craft Workers (건설기능인력의 업무환경 및 생산성 분석을 통한 기능인력의 효율적인 관리방안에 관한 연구)

  • Ha, Gee-Joo;Ha, Min-Su;Yi, Dong-Ryul
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.12
    • /
    • pp.173-180
    • /
    • 2019
  • Construction work is a labor-intensive industry, which is required systematic production activities using materials, manpower, and equipment. Among them, manpower resources play a very important role in achieving efficiently production in the organization. Construction work is highly dependent on construction craft workers, and the level of proficiency can be directly related to the construction productivity and quality. However, a rapidly aging construction craft workers in Korea, is being replaced by a foreign construction craft workers because of advoidance of new laborers in the construction site. In the future, if the continuous development and management of construction manpower is not made properly, it may be lead to adverse effects such as setbacks in production, delayed completion, faulty construction, industrial disasters, and decreased productivity in construction site. In this study, it was proposed four important factors for work capacity management of construction craft workers. These were ensuring of physical strength through the health management of construction craft workers, securing of proficiency through career management, ensuring of productivity through work capacity and establing of informatization through work capacity management. By introducing a systematic system, it is possible to improve construction craft workers' professionalism, enhancing the level of welfare, reflecting the realities of labor costs, increasing the quantitative and qualitative levels of construction craft workers, Futhermore it was demanded the continued interest and policy support for the realization of effective management of construction craft workers.

A Study on the Impact to Safety Management by the Speedy Construction Work and the Prevention Measure (돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구)

  • Ha, Haeng-Bong;Bang, Myung-Seok
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.2
    • /
    • pp.143-149
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.

SUGGESTING IMPROVEMENT METHODS OF FORM WORK FOR COST REDUCTION IN THE MID-RISE APARTMENT HOUSING

  • Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1608-1614
    • /
    • 2009
  • In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.

  • PDF

A Study on Estimating Time for PRD (Percussion Rotary Drill) Piling Work (도심지 토공사 PRD (Percussion Rotary Drill) 공법의 천공작업 소요시간 산정 방안에 관한 연구)

  • Kim, Yong-Gyu;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.3-10
    • /
    • 2018
  • In recent years, mechanized construction has become commonplace due to increases in the scale and complexity of construction, and construction machinery is a major factor in successful construction. However, even though the proportion of construction machinery is increasing, analysis of the work capacity of construction machinery is inadequate. In addition, since the standards for all construction machines are currently not defined in quantity-per-unit, the construction period is arbitrarily applied according to the operator at the time of the construction plan. As a result, the construction period of the actual construction is insufficient, and rushed work or construction delays occur. Therefore, in this study, in order to calculate the construction period of the piling work of the pile driver used in the PRD method more accurately than the existing method, the formula for calculating the time required for the piling work of the pile driver was established by collecting piling time data from the daily task reports through the field survey. If the precise construction period of piling work is estimated based on the results of this study, it will be possible to prevent the rushed work and construction delays that occur due to the short construction period.

A Study on the Risk Level of Work Types in Nuclear Power Plant Construction (원자력발전소 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Lee, Jun Kyung;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.3
    • /
    • pp.95-99
    • /
    • 2013
  • The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.

A Study on the Peculiarity of Construction Work for Architectural Properties during $1910{sim}1965$ ($1910{sim}1965$ 건조물문화재 보수공사의 시공특징에 관한 연구)

  • Kim, Jae-Kuck
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.77-99
    • /
    • 2006
  • This study is on the construction work of Preservation for Korean architectural properties during the period of japan invader. Korea lost their preservation ability of architectural properties when went through specific background from 1910 to 1945, which was the period of japan invader. Through this situation japan had to face the preservation of architectural properties for japan and korea. After 1945, korea has preserved the architectural properties over 50's years and which accomplishment every yew. Also, there are some architectural properties which registered in world heritages. However, the study of this period is not studied enough. Especially a construction work for architectural properties during this period is not become known. Therefore, the purpose of this study is for three. First is to analyze construction work data(a specifications and etc.) for accessing originality of korea architectural properties. Second is to understand about the construction works of preservation for the korean architectural properties. and the last is to compare the peculiarities of construction work of Preservation for korean architectural properties between during 1910-1945 and 1945-1965.

  • PDF

Risk Assessment Method for Activities of Apartment Construction (공동주택 건축공사 단위작업의 위험성 평가 방법)

  • Park, Sungpyo;Choi, Jae-Wook;Lee, Chansik
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.135-145
    • /
    • 2020
  • Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.

A Study on Development of Electronic Performance Support System Prototype for Improving the Efficiency of Quality Inspection of Temporary Work (가설공사 품질점검 업무효율 향상을 위한 전자작업지원시스템(EPSS) 프로토타입 개발에 관한 연구)

  • Yoon, Soo-Ho;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.13-27
    • /
    • 2019
  • While temporary construction work applies to a temporary facility, it has a high use frequency during the construction period accounting for around 10% of the construction cost, it requires systematic management. However, construction inspection information of temporary construction work often has no special specification in the design documents and specification items, with the items on various standards also being formidable. Because of this, related inspection are likely to be performed inefficiently with a high probability for occurrence of human errors when quality inspection is conducted for the temporary construction work. In the present study, therefore, apply to the electronic operation support system capable of supporting implementation of inspection of providing related information for the contemporary construction work. To achieve this, a prototype is developed by using IDEF0 to identify information flow by process and organizing EPSS-based quality inspection Task. And then, efficiency of the quality inspection and information accessibility for temporary construction work are to be improved by verification method of Sample Project.

Construction Cost Analysis of HPC Method by PC Construction Project Cases (사례분석에 의한 HPC공법의 공사비 분석)

  • Noh, ju-seong;Kim, Jae-yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.101-102
    • /
    • 2017
  • This study was carried out as basic study to apply to construction site the HPC method which is being developed. The construction cost of HPC method was analyzed in comparison with conventional method (half slab method). With regard to research method, it was decided that data on construction work carried out by half slab method was analyzed. According to the results of study, in case of being applied to the construction work using a divided column, the number of columns was decreased. So, it was shown that member production cost, and transport and assemblage cost reduced. In case of being applied to construction work using an undivided column, the analysis showed that there was little difference in construction cost. Therefore, the analysis showed that, if HPC construction method was applied to large structure using a large column, the construction cost was reduced to some extent in comparison with conventional half slab method.

  • PDF

A Study of Improving Construction Process by Work Structuring (Work Structuring에 의한 시공 프로세스 개선방안에 관한 연구)

  • Na Kyung-Chul;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-427
    • /
    • 2001
  • There are many problems such as uncertainty of sequencing and irrational interdependence of processes in work breakdown structure of construction project. This study suggests work structuring for improving work reliability and transparency of processes to solve problems of work breakdown structure. Also, It proposes a process design diagram The goal of improving process design by work structuring is to make work flow more reliable and quick while delivering value to the customer. The process design diagram aims at achieving lean project objectives, such as, reduction in the share of non-value adding activities, increased transparency, process simplification and increased product flexibility.

  • PDF