• Title/Summary/Keyword: Construction types

Search Result 3,457, Processing Time 0.029 seconds

Analyzing Defects Types and Causes of Activities in Information and Communication Works Based on Investigation (정보통신공사 하자관리 실태조사를 통한 세부 공종별 하자 유형 및 원인 분석)

  • Eom, Yong-Been;Sohn, Sung-Geun;Kang, Sang-Hun;Park, Hyun Jung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.269-270
    • /
    • 2021
  • As the era of the Fourth Industrial Revolution arrives and the culture of contact-less was established due to the long-term COVID-19, the construction industry is striving to develop smart home services to expand the scope of information and communications technology (ICT) to provide convenience to residents. However, various defects are occurring in information and communications technology facilities in apartments, and related research is lacking. In this study, case studies and research methods of related prior studies are analyzed as a basis for identifying the types and causes of defects that occur in information and communications technology facilities. To analyze various studies, we divided them into studies on smart home Internet of Things (IoT), information and communications technology construction of apartments, and investigated their features and limitations. Plus, future research will be conducted on apartments within 10 years of completion among apartments completed by domestic construction companies to supplement the limitations of prior research. In addition, we will prepare basic data on defects of ICT construction by analyzing the major causes of defect types through the analysis of defect types and frequency by detailed work type of information and communications technology construction.

  • PDF

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

CONSTRUCTION ERROR TYPES - THE EXECUTION STAGE OF DUBAI PROJECTS

  • Hamad Aljassmi;Sangwon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.459-467
    • /
    • 2011
  • Construction errors can have significant effects on project performance. Yet, any attempt to tackle error should be driven by the ability to understand its archetypal nature. This study aims to analyze a variety of construction errors at the execution stage, in order to develop a comprehensive set of categories that shall provide insights about the effect of different error types on the industry. We investigate a database provided by an authoritative source, which includes a number of 256 construction errors that occurred in the year 2009 in Dubai construction industry. Results from this study reveal that the most common error arose from 'poor workmanship' which accounted for 21% of the total encountered faults. The next most common types arose from the 'usage of impaired materials', followed by the 'deviation from an intended dimension'. These observations infer that the majority of construction errors are driven by workers' lack of skill or competence. Moreover, it suggests that execution-oriented errors are the major cause of faults and accidents rather than design errors.

  • PDF

An Analysis of the Accident Types and Causes of Construction Cranes (크레인 관련 중대재해사례를 통한 재해 유형 및 원인 분석)

  • Kim, Hong-Hyun;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.109-112
    • /
    • 2007
  • As buildings become higher, larger, and more complex, safety issues for construction workers working at such environments become more important. We analyzed 140 critical accident cases reported to the KOSHA(Korea Occupational Safety & Health Agency) for construction cranes and lifts by types of cranes and by patterns of accidents and causes. By finding out the accident's types and causes, we expect to develop an efficient measure for preventing similar accidents in the near future. The cases will be studied further and reexamined using the FMEA(Failure Mode and Effect Analysis) as a quantitative analysis method.

  • PDF

Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum - (계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 -)

  • Lee, Yoo-Seob;Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.155-163
    • /
    • 2007
  • Multiple parties-owners, engineering and construction contractors, and suppliers involve the delivery process of capital facility projects in the construction industry, and each party obtains or provides their workforce, material, equipment, or service tied into specific contracts. Considering that construction projects are based on the contracted relationship between the parties and that contract types are one of the significant factors determining project success. it is critical for project stakeholder to select appropriate contract types for successful deliveries of projects. With these considerations, this paper assesses impacts of different contract types on project cost, schedule, safety, change, or rework. Analyzing data from real construction projects, the differences in project performance between two contract types, Cost Reimbursable and Lump Sum are measured and statistically tested to investigate if the differences are significant. For this analysis, performance metrics developed by Benchmarking and Metrics program, the Construction Industry Institute are used.

Quantitative Analysis of Magnitude of Rework by Project Types and Sources of Rework

  • Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.202-211
    • /
    • 2006
  • Rework in the construction industry can adversely affect project cost and schedule performance. Based on direct rework costs recorded on 359 construction projects, this paper presents an assessment of the magnitude of rework by various types of projects and sources of rework. The results from this paper establish that on average 4.5% and 2.5% of actual construction costs were spent on rework for owner and contractor projects, respectively. Furthermore, this paper determines that the direct rework costs differ by project types and sources of rework. Finally, it permits the development of rework reduction initiatives. By quantifying and recognizing the different magnitude of rework, the industry can be aware of the waste from rework and develop effective plans for managing rework, ultimately improving project cost performance.

Strategies to Promote Supervisor's Leadership for Preventing Accidents in Construction Projects (효과적인 건설재해예방을 위한 현장소장 리더쉽 육성방안)

  • Hong, Sung-Ho;Lee, Seung-Hyun
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.2 s.74
    • /
    • pp.63-69
    • /
    • 2006
  • The main purpose of this study is to present the strategies for strengthening the leadership of field supervisors to effectively prevent construction accidents. To this end, first, this research study reviewed the meanings, functions, types and characteristics of the leadership of field supervisors in safety management activities on construction sites through the literature review. Second, the researcher investigated the types of supervisors' leadership and the level of field safety management activities through questionnaires. Third, the types of supervisors' leadership are categorized by that level. Fourth, the leadership type of field supervisors is suggested to effectively prevent construction accidents. Finally, the strategies to promote supervisors' leadership are developed.

Framework for a Strategic Knowledge Management for Construction Companies (건설기업의 전략적 지식축적 Framework)

  • Jung Young-Soo;Kang Seung-Hee;Lee Kyoo-Hyun;Choi In-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.157-160
    • /
    • 2005
  • The purpose of this paper is to develop a framework for strategic construction knowledge management. The variables of proposed framework includes knowledge types, strategic business functions, and engineering data types. The Proposed framework and knowledge action Plan for the construction company will contribute to develop knowledge management system related to engineering capabilities of strategic business functions

  • PDF

A Study on the Types and Solves Plan of Popular Complaint by Construction Work Types - Focus on the Gwang-Ju City - (건축공사 공종에 따른 진정민원의 유형과 처리에 관한 연구 - 광주 지역을 중심으로 -)

  • Song, Hyuk;Go, Seong-Seok;Park, Hyeon-Ku
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.97-105
    • /
    • 2005
  • As construction project is becoming larger, construction progress and works are more various and complex according to recent Korean construction tendency. The growth of construction induces much pollution on the progress of construction and the problems due to the construction pollution are raised into social problem strongly, because it is increasing the need on the quality of lift and the desire of clean environment. This study aimed to seek far the effective solving plan of the construction popular complaints by surveying the real condition of construction popular complaints and analyzing the cause and tansaction period of popular complaints. For this study, the laws related and popular complaints were analysed focusing on the documents in low district offices of Gwangju from 2000 to 2004. As a result, the types of construction popular complaints were divided into 17 and the causes were as follows in order: crack and subsidence of ground(14.90%), infringement of private life(11.55%), noise(10.80%), infringement of a right to sunshine(10.07%) and breakdown(6.7%). Consequently, it is considered that these complaints are occurred by physical and environmental causes.

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF