Proceedings of the Korean Institute of Building Construction Conference
/
2013.05a
/
pp.205-207
/
2013
In a situation that building energy consumption is increasing worldwide, the research utilizing BIM technology to analyze building energy has been actively conducted. On the other hand, data input method of the building energy analysis has been still manually entered. This paper proposed a improved input method of required information for building energy analysis using the ECO2-OD program. As a result, although some required information of BIM based design software could be almost entered when it comes to general information and architectural sector, it has a problem to be handled in HVAC sector. Therefore, in the both of general and architectural sectors, the BIM information from the BIM-based design software could be directly used to automatically and systematically input the information. Future research should be studied the algorism and method in connection with data exchange to utilize input method of ECO2-OD from BIM data.
Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
Journal of Construction Engineering and Project Management
/
v.4
no.4
/
pp.47-59
/
2014
Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.
International conference on construction engineering and project management
/
2005.10a
/
pp.845-848
/
2005
Technology transfer (TT) has been defined as the shared responsibility between the source and the destination for ensuring that technology is accepted and at least understood by someone with the knowledge and resources to apply and/or use the technology. The adoption of TT in construction industries is necessary for economic growth to occur in developing countries such as Thailand. This process should provide numerous benefits for the host sector in areas such as increased productivity, enhancement of product quality, cost savings, improvements in market share and entry to new markets. However, there are many factors, which may impact on the TT process and its subsequent outcomes for Thai construction firms and individuals, including, the transfer environment, learning environment, transferor characteristics and transferee characteristics. The performance and interaction of these enablers will influence the degree of value added to the local construction sectors in areas such as economic advancement, knowledge advancement and project performance. This paper presents a conceptual framework for international TT that accommodates the numerous factors believed to impact on the processes effectiveness. Through a Pilot Study, where 27 industry professionals from Thailand were interviewed, the significant factors which impact on the TT process have been identified along with the strength of interrelationship between individual and groups of factors. Future research seeks to target a greater sample of respondents with the view to validate the conceptual model and apply it on a number of large Thai projects where international TT was incorporated into the project agreement.
International conference on construction engineering and project management
/
2011.02a
/
pp.99-106
/
2011
Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning model
Broughton, Benjamin;Lee, Soon-Jae;Ryu, Jay Sang;Talley, Kimberly
Journal of Construction Engineering and Project Management
/
v.6
no.4
/
pp.15-23
/
2016
The construction industry suffers from declining productivity and lack of trust between stakeholders and among the public. Increasing technical, regulatory, environmental and ethical challenges face the sector and necessitate a new type of leader. Authentic leadership is a relatively new construct that focuses on a leader demonstrating self-awareness, relational transparency, an internalized ethical and moral perspective and balanced processing. This study uses the Authentic Leadership Questionnaire to measure construction superintendent's levels of authentic leadership and compares them to effectiveness ratings. There is a correlation between higher authentic leadership scores and effectiveness and this study concludes that authentic leaders are more effective superintendents.
Journal of Construction Engineering and Project Management
/
v.7
no.3
/
pp.26-38
/
2017
The architecture, engineering, and construction (AEC) industry is yet to formulate a holistic strategy to realign the evolving technological infrastructures with organisational ambitions and adaptive knowledge of the workforce. This study attempts to create an understanding of the underlying processes adopted by technology-enhanced construction organisations to disseminate and maintain knowledge within the workforce in order to keep pace with the evolving construction technologies. The study adopted expansive learning and adaptive expertise constructs to help better explain workplace learning support structures for organisational effectiveness in a turbulent situation. The two theories were tailored to empirically evaluate three case study construction organisations that have embarked on technology-enabled organisational changes. The study concluded on the creation of a facilitating workplace learning environment to enable the workforce to adapt into and resolve any inherent contradictions and cognitive ambiguities of the changing organisational conditions. This could ensure that novel and conflicting features of the emerging technologies can be adapted across the myriad multi-functional project activities in order to expand the frontiers of the technological capabilities to address the eminent issues confronting the AEC sector.
Recently, industrial accidents rate has been gradually decreasing due to the development of safety management methods, but until now, the accident rate in the construction sector is higher than other industries. Large-scale construction sites are operating systematic safety systems to reduce industrial accidents. However, small and medium sized construction sites do not have systematic safety system and lack safety management ability, so that disaster is not reduced compared with large scale construction site. As a result, disaster prevention technology instruction system has been implemented to reduce the disasters of small and medium scale construction sites. However, in the case of a small construction site less than 2 billion won, there is little decrease in the accident rate, and in some cases, the accident rate increases. After the technical guidance system has been implemented, it is necessary to identify the performance and problems of implementation and to improve its effectiveness. In this study, we suggest the improvement plan to improve the efficiency of the technical guidance system by analyzing the problems and actual conditions of technical guidance operation in small and medium sized construction work sites.
Hakami, Waled Gaber Mohammed;Yousif, Mohamed Ibrahim
Journal of Construction Engineering and Project Management
/
v.4
no.1
/
pp.1-7
/
2014
The Sudanese construction sector is characterized by many small and large projects and high labor intensity, and accounted for 3.2% of the Sudanese country's GDP. The basic problems facing the Sudanese construction projects are the factors that affect on construction project performance. The objectives include identifying the factors affecting the performance of Sudanese construction projects, and to determine the critical factors. The literature review has been done to gather the information about the causes and their factors that affect on the performance of construction projects from the previous researches. The research methodology was conducted to gather the data by questionnaire which was examined to be reliable and valid according to statistical tests. The (34) factors were identified as factors affect on construction projects and the (10) factors were the critical factors which may lead to poor performance of Sudanese construction projects. This study has some conclusions such as the instrument for measuring the critical factors on the performance is reliable and valid, so the project management stage performance is 64.2%.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.05a
/
pp.43-44
/
2021
As drone technology advances, the cases of using drones in the construction industry are increasing rapidly. Research by the Ministry of Trade, Industry and Energy, has shown that drone use in the construction sector is expected to expand the fastest, and research has been carried out continuously to utilize drones in the construction industry. In this way, we will identify drone research trends in the construction industry as a basic data that will provide direction for future research. This paper collected papers for 10 years from 2011 to 2020 and keyword analysis through Gephi 0.9.2. This paper was classified by the study details of the paper with the upper keywords by year, through which it analyzed the changes in the direction of the study by field. The data in this paper is designed to contribute to the development of balanced drone utilization research, despite the limitations of 10-year statistics.
Kim, Dae-Geon;Cha, Hun;Jung, sinyoung;Choi, Sang-Hwan;Moon, Kyeong-Sik
Proceedings of the Korean Institute of Building Construction Conference
/
2014.11a
/
pp.216-217
/
2014
Science & Technology(S&T) is the most important thing to attain competitiveness in the 21st century. Our traditional S&T policies have been forcused on hardware infra structure. We should consider software of S&T to enhance effectiveness. S&T Should be had a correct understanding method of the creation for S&T culture. It implies that S&T policy should consider nonmaterial factors which include social, environmental and culture. Under this background, The purpose of this paper is to seek new S&T policy. Therefor this paper deals with how we can prepare for the future S&T policy and classify the change of S&T policy of korea. In addition, Recent construction sector integration and fusion technologies in various areas of research and planning system is being maintained by the system. Past experience of conservative management in this emerging technology-driven technology commercialization in management of technology through the convergence of various technologies and to find synergies to secure the future of construction technology because it is a need.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.